Before
AfterWhole unit repainted
Every wall in a two-bedroom unit, from tired blue-green to a clean, even white. Ten rooms and corridors photographed before, fourteen after.
Every photo on this page was taken on site by our own technicians, before and after the work. Nothing staged, nothing borrowed. This is the standard we hand back to every owner.
Figures from our job records since April 2026.
The problem is recorded on camera before anything is touched.
The same spot, after the work, so you can compare for yourself.
Every pair is checked against what was asked for before the job is closed.
Each pin is a building where our team has completed work. Bigger pins mean more jobs. Tap a pin to see the building, and pinch or use + to zoom in.
Before
AfterEvery wall in a two-bedroom unit, from tired blue-green to a clean, even white. Ten rooms and corridors photographed before, fourteen after.
Before
AfterWater marks and scuffs across the living room and walls. Repainted end to end and handed back ready for the next tenant.
Before
AfterA loose wire hanging from the ceiling. Mounted properly, wired safely, and the fan fitted into the tray ceiling.
Before
AfterPaint coming away in sheets. Stripped back, skim-coated smooth and repainted, so it stays put this time.
Before
AfterA coil packed with dust and mould. Chemical-washed, flushed and refitted across the whole unit.
Before
AfterA scorched hob socket in the kitchen. Replaced with a new switched socket and checked before handover.
Before
AfterBlowing weak and musty — the filters and coil were caked solid. Serviced, sanitised and back to cold.
Before
AfterOpened up for repair — and closed up clean, with nothing left dangling.
Before
AfterThe fan controller was hanging off the wall with wiring exposed. Rewired, remounted, new controller fitted.
Before
AfterFailed ceiling light swapped for a bright new LED downlight.
Before
AfterThe tap had snapped off at the base. A new flexible spray faucet, fitted the same visit.
Before
AfterNothing but a pipe stub in the wall. New rainfall head mounted and sealed.
Before
AfterWorn and stained — replaced with a brand-new seat.
Before
AfterA corroded joint someone had patched with tape. We fitted a new valve properly.
Before
AfterThe wash basin had been torn clean off the wall. Re-plumbed, remounted — plus a new mirror.
Before
During
AfterWater was getting through the shower area. We stripped the floor, applied a waterproofing membrane, and rebuilt the tiled floor watertight.
Before
DuringWater tracking through a bedroom wall — sealed from the inside by polyurethane injection. Shown right after injection; the cured foam is trimmed flush and made good before handover.
Before
AfterLeak staining across the bathroom plaster ceiling — sealed, skimmed and repainted, with the lighting refitted.
Before
AfterSpotting and small holes patched, sealed and repainted — finished with a new light.
Before
AfterThe stain cut out, plaster repaired and repainted — and a new downlight installed.
Before
AfterBathroom moisture had rotted and delaminated the door’s bottom edge. Rebuilt, sealed and refinished — no full door replacement needed.
Before
AfterDamaged door replaced end-to-end: supplied, hung and painted.
Before
AfterRusted through and failing. New soft-close hinge — the door swings right again.
Before
AfterAn empty lock cutout on the grill door. Full lockset supplied and installed.
Before
AfterDull and dusty — machine-polished back to a gloss.
Before
AfterDegraded sealant and a blackened, water-rotted counter edge — stripped back, restored, and re-sealed with fresh silicone.
After
After
After14 jobs on a single work order: leak repair and waterproofing, plaster ceiling, full repaint, doors, lights and furniture — handed back rental-ready.
WhatsApp us your job details. We'll tell you what it needs and when we can come.
WhatsApp us your job details — we'll reply as soon as we can with a free quote.
💬 Get Your Free Quote