House Renovation Contractor KL & Selangor
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏠 House Renovation

House Renovation Contractor
in KL & Selangor

We design and build whole-house and condo renovations, kitchens, bathrooms and extensions, with one team running every trade from hacking and tiling to carpentry and paint. Flat price, no hidden charges, and we reply on WhatsApp within the hour.

Full renovation in progress inside a landed terrace house with new tiles stacked

ClickBina is an experienced house renovation contractor in KL, Selangor and Putrajaya: we design and build whole-house and condo renovations, kitchens, bathrooms, extensions, upper floors and demolish-and-rebuild projects, with one team running every trade at a flat price with no hidden charges. If you are still working out what a renovation should cost, read the full house renovation cost guide or plan it room by room in the renovation planner. This page explains what we do, how a project runs and what to decide before any hacking starts.

One Team, Every Trade

The whole renovation, designed, quoted and built as one scope.

📐
Design & layout

We measure the home, draw the layout and choose finishes with you before anything is built.

🍳
Kitchen renovation

Dry and wet kitchens, custom cabinets, worktops, tiling and the points behind them.

🚿
Bathroom renovation

Waterproofing, tiles, sanitaryware and plumbing for every wet area.

🏗
Extensions & upper floors

Rear and side extensions, upper floors and demolish-and-rebuild projects.

🧱
Hacking, tiling & flooring

Strip-out, new floor and wall tiles, vinyl and laminate, and level bases.

🔨
Custom cabinets & carpentry

Kitchen cabinets, wardrobes and TV units built to the measured room.

💡
Ceiling, lighting & electrical

Plaster ceilings, lighting, new points and rewiring as part of the scope.

🎨
Painting & finishing

Interior and exterior paint, feature walls and the final clean before handover.

House renovation in KL & Selangor: what we do

A house renovation is rarely one trade. Even a modest job touches hacking, plumbing, wiring, plaster, tiles, carpentry and paint, and the order those trades arrive in decides whether the work goes smoothly. We take the whole job: we measure, design the layout, fix the scope and the price, then build it and hand it over clean. You talk to one team instead of chasing six separate tradesmen.

Most enquiries we get fall into a handful of jobs, and each has its own page with more detail: a kitchen renovation, a bathroom renovation, a house extension or upper floor, interior design and build for a home that needs a new look as well as new finishes, and custom cabinets built to the measured room. A whole-house renovation simply combines several of these into one programme of works.

Typical renovation scopes by property type

The same brief, say a new kitchen, two bathrooms and new floors, plays out differently in a condo, a terrace house and a semi-D. The table is a planning guide, not a fixed scope.

PropertyWhat owners usually changeWhat to check before work starts
Condo or apartmentKitchen and bathrooms, flooring, built-in wardrobes, a plaster ceiling with new lighting, sometimes two small bedrooms joined into oneManagement rules on working hours, deposits, lift booking and which walls, pipes and wet areas you may touch
Terrace houseA dry kitchen in front with a wet kitchen behind, re-done bathrooms, new floors, the rear yard roofed or built out, the facade refreshedWhether the back is an original kitchen or an earlier extension, the state of the drains, and any party-wall issues with neighbours
Semi-D or bungalowOpen-plan living areas, a show kitchen with a separate wet kitchen, en-suite bathrooms, landscaping and car porch workStructural walls before anything is removed, roof and gutter condition, and the larger scope needing tighter planning
Older house or walk-up flatRewiring and re-piping behind new finishes, levelling floors, fixing damp walls and leaking wet areas before anything decorativeThe age of the wiring and pipes, hidden cracks, and old waterproofing under the tiles
New house after keysKitchen cabinets, wardrobes, grilles, ceiling and lighting, plus fixing developer defects firstWhat the developer must still fix under the defect liability period before you cover it up

Each type has its own guide: semi-D and bungalow renovation, old house renovation, and the first renovation after keys for a new condo or a new terrace house.

Design first, then build

Renovations go wrong most often when building starts before the decisions are made. The layout fixes where the kitchen sink, the hob, the toilets, the power points and the air-conditioner pipes go, and every one of those positions decides what is buried in the walls and floor. So we design first: measure, draw the layout, choose materials and finishes, and only then fix the scope and the price.

Because we design and build, the drawing and the build come from the same team, which removes the hand-over gap between a designer and a contractor. The designer vs contractor guide compares the two routes, and our design ideas pages show styles by room and home type.

Hacking, structural changes and rebuilds

Knocking down a wall is the change owners ask for most, and the one to check most carefully. A partition wall can usually come out; a wall that carries a beam or the floor above cannot be touched without an engineer's advice. The guide to hacking walls explains how to tell the difference and what the work involves.

Bigger changes are a different class of project. Adding an upper floor to a single-storey house, building out at the back or knocking the house down and starting again usually need council approval and a registered professional to prepare and submit the plans, and a CIDB-registered contractor may be required. That is general advice: check with your local council early. The guide to adding a second storey and the demolish-and-rebuild comparison walk through those decisions.

How long a house renovation takes

Timelines depend on scope far more than on floor area. As a rough guide, a full condo renovation typically runs 6–10 weeks, a terrace house 8–14 weeks and a semi-D or bungalow 12–16 weeks or more; a cosmetic refresh is much shorter. Custom carpentry and any approval wait are usually what stretch a programme. The renovation timeline guide breaks it down stage by stage.

Living in the house while the work goes on is possible for many jobs, but the noisy, dusty stages come first and the kitchen or bathrooms are out of use for a while. The guide to renovating while you live in the house covers how to plan around it.

Condo rules, council permits and contractor checks

In a condo, the owner applies to the management office with the scope of works before anything starts, and most buildings set working hours, a renovation deposit and rules on lifts and debris. The strata renovation rules guide explains what a management office can and cannot refuse.

On a landed house, internal finishes generally do not need a council permit, but structural work, extensions and roofing over open space often do. The renovation permit guide lists which jobs need one. For bigger structural jobs, ask any contractor whether they are registered with CIDB, and check it yourself; the CIDB contractor guide shows how.

What a fair renovation quote shows

A fair quote lists each part of the job on its own line: hacking and disposal, plumbing and electrical points, waterproofing, tiling, ceiling, carpentry, painting and the final clean, each with its material and quantity. When two quotes are built differently, compare them line by line, not by the total. The guide to reading a renovation quote shows what is often left out.

Payment should follow progress, not dates, and the contract should state the scope, the drawings and what happens when something unexpected is found once the old finishes are opened up. The payment schedule guide and the renovation contract guide cover both. Our price is flat for the agreed scope, with no hidden charges.

Checks during the work and at handover

The most important checks happen before anything is covered up: pipes pressure-tested before tiling, waterproofing ponded before the tiles go on, wiring in place before the ceiling closes. Ask to see each of those stages; the stage inspection guide lists what to look for.

At the end, walk the whole house with a snag list before the final payment: doors and drawers, tile joints, falls to the drains, paint edges, every switch and tap. The handover snag list gives a room-by-room checklist.

Areas we cover

We renovate houses and condos across Kuala Lumpur, Selangor and Putrajaya: terraces, semi-Ds, bungalows, condos, apartments and older walk-up flats. Local notes on housing types and council rules are in our area pages for Petaling Jaya, Shah Alam and Cheras, the Kuala Lumpur renovation guide covers the city, and the full list of towns is on the areas we serve page.

Ready to plan your project?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

From First Message
to Handover

You see the scope and the price before any work starts.

01
WhatsApp Us

Tell us your area, property type and what you want done. We reply within the hour.

02
Site Visit & Measurement

We measure the home and check walls, pipes and wiring. A site visit is free.

03
Design & Flat-Price Quote

You get the layout and a quote with a flat price for the agreed scope, no hidden charges.

04
Build & Handover

The work is done to the agreed scope, and you walk the finished house before handover.

Common Questions

How long does a full house renovation take?
It depends on the scope. As a rough guide, a full condo renovation typically takes 6–10 weeks, a terrace house 8–14 weeks and a semi-D or bungalow 12–16 weeks or more. A cosmetic refresh of paint and floors is much shorter. Custom carpentry and approvals are the usual reasons a programme stretches.
What renovation work do you do?
Whole-house and condo renovations, kitchens, bathrooms, extensions, upper floors, demolish-and-rebuild projects, custom cabinets, tiling and flooring, ceilings, painting and carpentry. We design and build, so one team coordinates every trade from the first measurement to handover.
Do I need to be at home during the renovation?
Not all the time. You will need to be there for the site visit, the key design decisions and the handover walk-through. In between you do not need to be there: we manage the work and send you real-time progress photos on WhatsApp, so you can check the work before anything is covered up.
Can you renovate while we are still living in the house?
Often, yes. Dust screens and floor protection keep the rest of the home usable, but the kitchen or bathrooms are out of use while they are being redone, and hacking is noisy. For a full gut renovation, many families move out for the dustiest stages.
Can I buy some of the materials myself?
Yes. Tiles, sanitaryware, lights and appliances are often bought by the owner. Agree in writing who supplies what, when it must arrive on site and who checks it for damage, so a late delivery does not hold up the trades.
How do I choose a renovation contractor?
Compare at least two itemised quotes for the same scope, check the company is registered with SSM, ask to see finished jobs and read the contract before paying a deposit. The guide to choosing a contractor lists the questions to ask. You can see examples of finished jobs on our work page.
Which areas do you cover?
Kuala Lumpur, Selangor and Putrajaya: condos, apartments, terraces, semi-Ds and bungalows. WhatsApp us your area and property type and we reply within the hour.
How do I get a quote?
WhatsApp us your area, property type and what you want done; we reply within the hour. For renovation work, a site visit is free, and the quote that follows is a flat price for the agreed scope, with no hidden charges. If you are planning from scratch, the renovation checklist helps you prepare.

Costs, designs and areas — our free guides for this service:

Full renovation costKitchen costBathroom costHow to read a quotePayment scheduleRenovation glossaryRenovation plannerAreas we serve

Get a free, no-obligation quote

Fill in a few details and it opens WhatsApp with your enquiry ready to send. We reply within the hour.

No spam — your details go straight to our team on WhatsApp.

Ready to Renovate?

WhatsApp us your area and what you want done — we reply within the hour. A site visit is free for renovation work.