Design-and-build office fit-out and renovation across Kuala Lumpur, Selangor and Putrajaya — partitions, ceilings, lighting, flooring, pantry and reception joinery, planned around your lease date and your building’s rules.

An office fit-out is part design, part construction and part paperwork with your building. We plan the layout around how your team works, then build it: partitions and glass rooms, ceilings and lighting, flooring, pantry and reception joinery, painting and the finishing details. One team carries the job from the first layout sketch to handover, so you are not coordinating five trades yourself.
This page covers what an office renovation contractor in KL actually does, what it costs per sq ft in 2026, how long it takes, which approvals the tenant needs, and what to send us so we can quote. If you are opening a shop, cafe, restaurant, clinic or salon instead, see our shop and restaurant fit-out page.
Office renovation is priced per square foot of the floor you occupy. The bands below are the indicative 2026 Klang Valley ranges from our office renovation cost guide. The level you land in depends on how much of the floor is rebuilt, how many enclosed rooms you need and how much of the existing ceiling, lighting and air-conditioning can be reused. If the unit is handed over as CAT A rather than bare shell, much of that base is already in place — see CAT A vs CAT B office fit-out explained.
| Fit-out level | RM per sq ft (2026) | Typical scope |
|---|---|---|
| Basic | RM50 – RM120 | Paint, carpet or vinyl, light partitions, existing ceiling |
| Mid-range | RM120 – RM220 | New ceiling and lighting, glass partitions, pantry, meeting rooms |
| Premium / HQ | RM250 – RM300+ | Designer reception, bespoke joinery, full M&E, AV and ACMV |
A full fit-out of a bare or previously stripped unit costs more at the bottom end, because the base services have to be built first. Our office fit-out cost guide puts a basic functional fit-out at RM80–RM130 per sq ft, a mid-range corporate fit-out at RM140–RM200 and premium Grade-A space at RM250+, with KL CBD fit-outs commonly at RM120–RM220 per sq ft. Mechanical and electrical works (air-conditioning, wiring and fire protection) make up 30–40% of the budget, so the M&E scope moves the final figure more than the finishes do. If your office sits in a ground-floor shoplot rather than an office tower, the ground-floor shoplot renovation cost guide covers that building type.
This worked example from the same cost guide shows how a mid-range 2,000 sq ft office breaks down. Use it to check that a quotation covers every line, not just the visible finishes.
| Work item (2,000 sq ft, mid-range) | Typical cost |
|---|---|
| Demolition & protection | RM8,000 – RM15,000 |
| Partitions (gypsum + glass) | RM45,000 – RM80,000 |
| Ceiling, lighting & electrical | RM60,000 – RM100,000 |
| ACMV modification | RM30,000 – RM55,000 |
| Flooring (carpet tile / vinyl) | RM25,000 – RM45,000 |
| Reception & pantry joinery | RM30,000 – RM55,000 |
| Fire protection & Bomba submission | RM15,000 – RM30,000 |
| Paint, signage & finishing | RM12,000 – RM25,000 |
| Typical total (excl. furniture) | RM225,000 – RM405,000 |
| Office size | Typical budget (excl. furniture) |
|---|---|
| 1,000 sq ft (small studio) | RM120k – 200k |
| 2,500 sq ft (SME) | RM300k – 500k |
| 5,000 sq ft (department / HQ floor) | RM600k – 1.0m |
| 10,000 sq ft (full HQ) | RM1.2m – 2.5m |
Items usually quoted separately: workstations at RM800–RM2,500 per seat, meeting-room AV at RM8,000–RM30,000 per room, and structured cabling at RM200–RM500 per data point. If you only need a layout and drawings for your own builder, our office interior design guide puts design-only fees at about RM3–RM8 per sq ft. For layouts that make a small floor plate work, see small office interior design.
WhatsApp us your floor area and building name and we will tell you which band your office is likely to fall in before the site visit.
As a commercial fit-out contractor we work on most business premises in the Klang Valley. Each type has its own cost drivers, covered in a dedicated guide:
From these stages in the office renovation cost guide, design and approvals take about 2–4 weeks, and construction of a 2,000–4,000 sq ft office runs 5–9 weeks. Premium fit-outs with bespoke joinery and AV can reach 12–16 weeks end to end.
| Stage | Typical duration |
|---|---|
| Design & space planning | 1 – 3 weeks |
| Approvals (building management, Bomba) | 1 – 3 weeks (can overlap with design) |
| Construction (2,000 – 4,000 sq ft) | 5 – 9 weeks |
| Furniture, IT & handover | 1 – 2 weeks |
The usual schedule stretchers are building work-hour limits (many buildings only allow noisy works after office hours), service-lift booking and late approvals. Start the design before you sign the lease if you can; the commercial fit-out timeline guide shows the order that keeps an opening date safe.
Approvals belong to the tenant (or the owner, for an owner-occupied unit). The exact list depends on the building and on how much the fit-out touches fire safety, layout and services. Most office fit-outs involve:
Authority submissions are made with drawings endorsed by a registered professional, and our commercial renovation permit guide puts the submission (drawings and fees) at about RM8,000–RM25,000 depending on scope. A fit-out contractor typically supplies the layout drawings, material specifications and method statements those applications ask for. Agree early who is preparing and submitting each one, because the build programme follows the approval dates.
Also check the lease for reinstatement. Most commercial leases require you to return the unit to bare condition at the end. Our office reinstatement guide puts a light make-good at RM3–RM6 per sq ft, a standard strip-out at RM6–RM12 and a heavy strip-out to bare shell at RM12–RM20+, so bespoke built-ins cost you twice.
You do not need drawings to start. These details let us give you a realistic range and plan the site visit:
Send these on WhatsApp and we'll reply as soon as we can. We cover Kuala Lumpur, Selangor and Putrajaya.
One contractor from layout to handover.
Layout, workstations, meeting rooms and reception, with 3D views and a specification before you commit.
Gypsum and glass partitions, acoustic meeting rooms, feature walls and wall panels.
Plaster and grid ceilings, LED and linear lighting, and the electrical points your layout needs.
Reception counters, pantries, storage walls and lockers, built to your layout.
Carpet tile, vinyl and SPC plank, painting and the finishing details that make it look done.
A defects walk before move-in, and reinstatement (make-good) when a lease ends.
One team from layout to handover: fewer hand-offs, fewer gaps between trades.
A flat price for the agreed scope, with what is in and out written down.
Experienced KL & Selangor contractor; WhatsApp us and we'll reply as soon as we can.
WhatsApp us your job details — we'll reply as soon as we can with a free quote.
💬 Get Your Free QuoteFree guides for office tenants and facility managers:
Fill in a few details and it opens WhatsApp with your enquiry ready to send. We'll reply as soon as we can.
No spam — your details go straight to our team on WhatsApp.
WhatsApp us your requirements — we'll reply as soon as we can.