Who builds what in an office, what to check in the tenancy, and how the starting point changes your budget.

CAT A is the landlord's basic finished space; CAT B is the tenant's fit-out that turns it into a working office. A CAT A handover usually means a basic ceiling, raised floor, base air-conditioning and lighting are already in; CAT B adds the layout, partitions, meeting rooms, pantry, branding and finishes. The labels are not fixed by law, so the tenancy's handover specification is what counts. A bare shell costs more to fit out because the base services must be built first. ClickBina's office renovation guide puts a basic office at RM50 – RM120 per sq ft and a mid-range office at RM120 – RM220 per sq ft (indicative 2026, Klang Valley). A site visit is RM150, waived if you go ahead.
The terms describe who builds what in an office. The office fit-out cost guide puts it simply: landlords often hand over space as a CAT A shell with a basic ceiling, raised floor, base air-conditioning and lighting, and the tenant's fit-out, the CAT B, is everything that makes it your office: layout, partitions, branding, meeting rooms, pantry and finishes.
The labels come from the office market and are used loosely. One landlord's CAT A includes ceiling tiles and light fittings; another's stops at the main aircon ducts and a capped sprinkler grid. That is why the first thing to read is not the brochure but the handover specification attached to the letter of offer or tenancy.
| Item | Usually in CAT A (landlord) | Usually in CAT B (tenant) |
|---|---|---|
| Ceiling | Basic ceiling grid and tiles | Feature ceilings, bulkheads, changes for rooms |
| Floor | Raised floor or screeded slab | Carpet tile, vinyl or SPC on top |
| Aircon | Base system to open-plan zones | Extra units or zones for meeting rooms and server room |
| Lighting | General lighting to the open floor | Feature and task lighting, room switching |
| Fire protection | Base sprinklers, detectors and alarm | Relocating heads and detectors around new rooms |
| Rooms | None; one open floor | Partitions, meeting rooms, pantry, reception, store |
| Power and data | Main supply to the floor | Floor boxes, desk power, structured cabling |
| Finishes and brand | Plain painted walls | Graphics, signage, joinery, furniture |
Treat the table as a starting point, not a contract. Each line is one to confirm in writing with the landlord before you price the fit-out.
There are really three starting points, and they change the budget more than any finish choice. A bare shell, sometimes called a cold shell, has a raw floor, exposed soffit and capped services; the office renovation cost guide explains that it costs more than refurbishing an existing office because the ceiling, flooring, lighting and air-conditioning are built from scratch. A CAT A unit has those basics in. A unit left by the previous tenant may have useful partitions and aircon, or may have things that need stripping out before you start.
Shophouse offices are a fourth case. The upper-floor shoplot office guide notes there is no CAT A handover there at all: the renovation has to supply what an office block would have provided.
Get these answers before the layout is fixed. A meeting room that sits under a capped aircon duct or blocks a sprinkler grid is far cheaper to move on paper than after the partitions are built.
CAT B work follows the order of any office fit-out: survey the space, agree the layout, get the building's approval, then build partitions and ceilings, run power and data, adjust aircon and fire services, lay floors, install joinery and finish. The partition guide compares drywall with demountable systems, and the office cabling guide explains how a raised floor changes where outlets can go.
Specialist systems belong to specialists. Sprinkler and fire-alarm changes are done by the building's fire contractor or a licensed fire specialist; central aircon changes by the aircon specialist; fixed wiring by a registered wireman. A fit-out contractor coordinates these with the rest of the work.
The same layout can cost very different amounts depending on the starting point. On a CAT A floor the budget goes mostly into rooms, finishes and furniture. On a bare shell it also has to carry the ceiling, base lighting, aircon and flooring. ClickBina's published office figures give a feel for the items (indicative 2026, Klang Valley):
| Item | Indicative price | Source |
|---|---|---|
| Basic office renovation (paint, carpet or vinyl, light partitions, existing ceiling) | RM50 – RM120 per sq ft | Office renovation cost guide |
| Mid-range office (new ceiling and lighting, glass partitions, pantry, meeting rooms) | RM120 – RM220 per sq ft | Office renovation cost guide |
| Drywall partition, single board | RM10 – RM16 per sq ft | Partition guide |
| Vinyl plank flooring, supplied and installed | RM6 – RM10 per sq ft | Office flooring guide |
| Structured cabling and network | RM200 – RM500 per point | Office cabling guide |
| Ceiling cassette aircon unit | RM2,800 – RM6,000 | Office aircon guide |
| Standard reinstatement at lease end | RM6 – RM12 per sq ft | Partition guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteThe classic waste in a CAT A to CAT B fit-out is removing what the landlord just installed. Ceiling tiles come down for a feature ceiling, a new raised-floor layout fights the floor boxes, or the landlord's light fittings are thrown away for a different style. Some landlords will agree to leave out items you will replace, or to credit them, if asked before handover. Ask early, and put any agreement in writing.
The same goes for a previous tenant's fit-out: if partitions, aircon or a pantry suit your layout, agreeing with the landlord to keep them can save both the strip-out and part of your CAT B.
Whatever you build, read what you must give back. Many tenancies require the unit to be returned to its original condition, which may mean back to CAT A or back to bare shell. The reinstatement dispute guide explains how the standard, scope and evidence decide deposit deductions. Record the condition at handover, and agree in writing any items that may stay.
ClickBina handles commercial renovation and fit-out works and coordinates the trades: partitions, ceilings, floors, finishes and joinery, with aircon, fire services and electrical works coordinated with the building's specialists. WhatsApp us your job details for a quote: how the unit is handed over, its size and the building. We reply within the hour, and the price agreed is a flat price with no hidden charges. A site visit is RM150, waived if you go ahead. See also office renovation.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each. CAT A and CAT B are market terms, not legal ones; the tenancy's handover specification always decides.