Renovation Contractor in Cheras – ClickBina
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📍 Serving Cheras

Renovation Contractor
in Cheras

Cheras spans three councils and five decades of housing. We quote landed and strata jobs on the KL side, the MPAJ north and the MPKj south.

New steel grille door installed on an older walk-up flat corridor in Cheras
The first question for any Cheras renovation is which council you are under. Cheras is split between DBKL on the Kuala Lumpur side, the Ampang Jaya council (MPAJ) to the north and the Kajang council (MPKj) to the south, and each has its own forms and extension rules. Below: how each council handles renovation approvals, what the old estates such as Taman Midah and Taman Connaught are like to work on, and the Cheras-specific cost guides we have written.

Local facts last reviewed 27 September 2026. Sources are listed at the end of the page.

Few parts of the Klang Valley mix eras as sharply as Cheras. Taman Midah was launched in the 1970s by Bolton Bhd, now Symphony Life, as its first township on 350 acres; one corner terrace there was bought in 1970, and until the 1990s nothing but landed homes was built on it. Around those early estates sit walk-up flats, later townships such as Bandar Tun Hussein Onn, and the condominiums that have gone up near the MRT Kajang Line stations at Taman Midah and Taman Connaught.

On the Kuala Lumpur side alone, the P.123 Cheras constituency counted 135,823 residents and the neighbouring P.124 Bandar Tun Razak 191,318 in Census 2020 — before counting the Selangor townships across the boundary. A renovation plan that suits a 1970s single-storey terrace in Taman Midah is the wrong plan for a twenty-first-floor condo off Jalan Cheras, so we start every quote by pinning down the property type and the council.

Cheras at a glance

ItemDetail
CouncilsDBKL (Kuala Lumpur side), MPAJ (north), MPKj (south)
Population (KL side)P.123 Cheras 135,823; P.124 Bandar Tun Razak 191,318 (Census 2020)
Early estatesTaman Midah (1970s, Bolton / Symphony Life) and Taman Connaught
Later townshipsBandar Tun Hussein Onn, Bandar Mahkota Cheras, MRT-corridor condos
RailCheras LRT; MRT Kajang Line incl. Taman Midah and Taman Connaught stations

DBKL, MPAJ or MPKj: three sets of renovation rules

DBKL (Kuala Lumpur side). Small works go through the OSC 3 Plus online “Temporary Permit / Small Works Permit” (form B2-PK). It asks for a sketch or building plan, a copy of the title or sale-and-purchase agreement, photos of the building and a location plan. For a strata or landed-strata property you also need written consent from the JMB or MC, and if scaffolding or a lorry crane will stand outside your lot, a separate approval for that. DBKL’s Commissioner of Buildings has also barred adding internal partition walls to create extra rooms in residential strata units in Kuala Lumpur (circular COBKL 2023/01, in force from 1 August 2023) — relevant if you were planning to split a Cheras condo into more bedrooms.

MPAJ (north Cheras). Extensions and renovations of landed homes need an application that starts with a letter from a registered architect or draughtsman and a qualified engineer; a registered draughtsman may only sign for up to 3,000 sq ft and two storeys. Two-storey additions and flat concrete roofs need structural plans and calculations, a neighbour-notification letter is required, and a terrace house’s front ground-floor wall must stay 6,100mm (20 ft) clear of the boundary. MPAJ runs a separate application for interior renovation in multi-storey homes that does not change the structure.

MPKj (south Cheras). MPKj’s extension guideline requires reinforced-concrete drawings for two-storey extensions or single-storey extensions above 500 sq ft, and says new sanitary pipes must run to a gully trap and manhole, not the surface drain. Its forms page carries the renovation and minor-works applications.

Cheras homes: what each type usually needs

  • Older terraces in Taman Midah and Taman Connaught. Taman Midah’s first homes are half a century old, and many terraces here have had a kitchen or rear extension added at some point. Before adding another, it is worth confirming the earlier one was approved, because MPAJ and MPKj both check extensions against approved plans.
  • Walk-up and low-rise flats. Leaks through the floor slab into the unit below are the classic Cheras strata problem; fixing them properly means lifting tiles and redoing the membrane, not surface sealant.
  • Later townships such as Bandar Tun Hussein Onn: largely terrace housing, where owners are often on a second-generation renovation of kitchens and bathrooms.
  • MRT-corridor condominiums. Compact layouts where the JMB’s house rules, renovation deposit and permitted hacking hours drive the programme as much as the design does.

Flash-flood roads worth knowing

Jalan Cheras floods in heavy rain often enough to affect how materials are delivered. After an hour of rain on 4 March 2015, Jalan Cheras flooded near the Taman Billion roundabout. In September 2021 DBKL diverted traffic outside Eko Cheras Mall to dredge silt and remove old pipes to tackle flash flooding there. Taman Connaught was among the KL areas flooded on 30 November 2022, and on 23 November 2023 Jalan Cheras flooded from the Jalan Ikan Ayu lights towards Shamelin, as did the East-West link opposite Taman Connaught.

For a ground-floor unit in a low-lying estate, it is worth choosing water-tolerant finishes for the lowest part of the walls and floor, and raising power points in the kitchen and store areas, rather than repeating the same finishes a flood damaged last time.

Cheras jobs we quote most

Our Cheras guides break down costs and the approval steps for each council:

Get a free quote on WhatsApp

WhatsApp us your job details — we'll reply as soon as we can with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Cheras on the map

Cheras runs south-east from Kuala Lumpur along Jalan Cheras towards Kajang. We cover both the KL and Selangor sides, from Taman Connaught and Taman Midah to Bandar Tun Hussein Onn.

Neighbouring areas

Properties just beyond Cheras are covered here:

  • Bandar Mahkota Cheras — the MPKj township of two-storey terraces further south.
  • Sungai Long — golf-course township off the Cheras–Kajang corridor.
  • Kajang — MPKj’s home town, at the end of the MRT Kajang Line.
  • Ampang — north of Cheras, where MPAJ’s rules also apply.
  • Pandan Indah — MPAJ township next to north Cheras.
  • Balakong — former New Village south-west of Cheras, also under MPKj.

Cheras renovation: your questions

Which council approves renovation in Cheras?
It depends on your address: DBKL on the Kuala Lumpur side, the Ampang Jaya council (MPAJ) to the north and the Kajang council (MPKj) to the south. Your assessment-tax bill shows which one.
Can I add a bedroom partition in my Cheras condo?
Not on the Kuala Lumpur side. DBKL’s Commissioner of Buildings circular COBKL 2023/01 (from 1 August 2023) bars adding internal partition walls to create extra rooms in residential strata units in KL. For a Selangor-side condo, ask your management and the council before planning one.
What does DBKL need for a small-works permit in Cheras?
Form B2-PK on OSC 3 Plus asks for a sketch or building plan, the title or S&P copy, building photos and a location plan, plus written JMB or MC consent for strata properties.
Do I need an architect for an extension in north Cheras?
MPAJ’s extension application starts with a letter from a registered architect or draughtsman and an engineer; a draughtsman can sign for up to 3,000 sq ft and two storeys.
How do I get a price for a Cheras job?
WhatsApp us your job details for a free quote — we'll reply as soon as we can. If a visit is needed, it is free.

Sources & official references

The local facts on this page were checked against the sources below on 27 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:

Need a Contractor in Cheras?

WhatsApp us your property details — free quote.

WhatsApp ClickBina← Home
💬 Get Your Free Quote