Kepong’s 1970s–80s terraces, New Village homes and newer condos, renovated with DBKL’s rules and the area’s flood-prone streets in mind.

Local facts last reviewed 27 September 2026. Sources are listed at the end of the page.
Kepong traces back to a nineteenth-century tin-mining settlement and grew into a mature township that is mostly single-storey terrace housing from the 1980s, with condominiums added since. The Kepong parliamentary seat had 106,199 residents in Census 2020, and Kepong sits inside Kuala Lumpur City Hall, the most populous local authority in Malaysia at 1,982,112 people. Its named neighbourhoods include Jinjang, Kepong Baru, Bandar Menjalara, Taman Bukit Maluri and Metro Prima.
Taman Bukit Maluri is a mature estate of terrace houses, shop-offices and factory lots, and Kepong Baru is one of the older landed pockets, mostly single-storey freehold terraces. Jinjang Utara, in the north, has had its own drainage problems, covered below. Where a street was built in one go, its houses tend to age together, so neighbours often find themselves dealing with wet areas, roofs and rear kitchens around the same time.
| Item | Detail |
|---|---|
| Local authority | Kuala Lumpur City Hall (DBKL) |
| Population | P.114 Kepong 106,199 (Census 2020) |
| Main estates | Taman Bukit Maluri, Bandar Menjalara, Jinjang, Kepong Baru, Metro Prima |
| Flood-hit areas | Taman Antoi, Taman Pusat Kepong, Taman Nanyang, Jinjang Utara |
| Rail | Kepong Sentral (KTM Komuter and MRT Putrajaya Line) |
For landed houses, DBKL publishes renovation guidelines specifically for existing terrace and semi-detached houses in Kuala Lumpur, alongside a minor-works permit guideline for residential houses. Minor works are applied for online through OSC 3 Plus using form B2-PK, which asks for a sketch or plan, a copy of the title or sale-and-purchase agreement, photos of the building and a location plan.
For condominiums and apartments, the same form requires written consent from the JMB or MC, and the Commissioner of Buildings’ strata renovation procedure applies: minor works such as aircon, grilles, wiring and plumbing repairs need the JMB’s or MC’s written permission, and anything affecting common property needs owners’ approval at a general meeting. Since 1 August 2023, circular COBKL 2023/01 bars adding partition walls to create extra rooms in KL strata units.
One Kepong-specific enforcement point: in October 2024 authorities linked flash floods in Jinjang Utara to blocked drains and to residents’ illegal concrete ramps built over the drains on Jalan Benteng Timur, with more illegal structures over drains found on Jalan Benteng Utara. A car-porch ramp or a paved frontage must not bridge or block the public drain.
The Star has reported more than 30 flooding incidents in Kepong since 2022, with Taman Antoi and Taman Pusat Kepong among the worst hit and water reaching up to 1m in August 2024. On 19–20 April 2026 the Jalan Development commercial area in Taman Kepong and Taman Antoi flooded again, to about 0.61m. Jalan 3/16e in Taman Nanyang flooded twice in late March 2026, after which DBKL planned drain cleaning and a new connecting drain.
If you live in one of those streets, build the renovation to recover from water rather than pretend it will not come: raise power sockets on the ground floor when rewiring, use tiles and water-resistant boards low on the walls instead of plasterboard or chipboard carcasses, choose kitchen base cabinets with aluminium or PVC carcasses, and keep the front drain open and reachable.
For costs and local detail, see our Kepong guides:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWe cover Kepong from Jinjang and Kepong Baru to Bandar Menjalara, Taman Bukit Maluri and Metro Prima.
Next door to Kepong:
The local facts on this page were checked against the sources below on 27 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.