1980s terraces and newer condos in Sri Petaling — fences, gates, grilles, rear extensions and kitchens, quoted with DBKL’s permit list in hand.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.
Sri Petaling, also called Bandar Baru Sri Petaling, is an established Kuala Lumpur suburb founded in 1981, with its earliest streets developed through the 1980s. It takes in Taman Sri Petaling and Bandar Sri Petaling, sits between OUG, Kuchai Lama and Bukit Jalil, and has its own station, Sri Petaling LRT, on the line that carries its name.
A township of that vintage has a predictable renovation pattern. The original front gates and low fences are replaced with something taller and more secure; window and door grilles go on; the rear kitchen is pushed back into the yard; and on some streets, a second or third floor is added. Where a home is in one of the newer strata blocks instead, the work goes through the management body.
| Item | Detail |
|---|---|
| Local authority | Kuala Lumpur City Hall (DBKL) |
| Founded | 1981; earliest streets built through the 1980s |
| Areas | Taman Sri Petaling, Bandar Sri Petaling |
| DBKL permit fee | RM100 per minor-works permit, one job per permit |
| Rail | Sri Petaling LRT (Sri Petaling Line) |
DBKL’s minor-works permit guideline (third edition, updated 30 September 2025) is written for owners of houses that already have a CF or CCC, and several of its items read like a Sri Petaling to-do list. Permit needed: replacing an existing gate, as long as the opening stays within 6,100 mm and no new gate is added; replacing a fence with a masonry wall, up to 1.5 m high for terraced and linked houses; installing grilles that are welded in place; and replacing or repairing the perimeter drain inside your lot. No permit needed: factory-made grilles, replacing an existing wire fence with the same type, painting, and installing lights or CCTV.
The practical rules are tight. Each permit costs RM100 and covers one item of work, the work must be finished in three months, and it may only run from 9am to 6pm, Monday to Saturday, with nothing on Sundays or public holidays. The owner signs a declaration before a Commissioner for Oaths, the permit has to be displayed where it can be seen, and converting to an electric gate also needs Energy Commission approval. A permit extension costs another RM100.
Bigger additions are building-plan submissions, not minor works. For terraces, DBKL assesses them under its terrace renovation guidelines, and which one applies depends on the size of your lot.
DBKL’s guideline for 1-, 2- and 3-storey terraced houses on small lots (in force from 20 April 2015) applies to intermediate lots narrower than 20 ft (6,096 mm), shorter than 70 ft (21,336 mm) and under 1,400 sq ft (130 m²). If your Sri Petaling terrace meets that definition, measure it against the title before assuming the stricter standard-lot rules. On small lots:
Extending at the back changes how rain leaves the house. A rear extension built to the boundary loses the open yard that used to take roof run-off, so the new roof’s gutter, the downpipe and the shared rear drain have to be designed together, and a jack roof or air well needs its own flashing. Leaks in extended terraces commonly start at those new-to-old roof junctions.
Inside, a house of the early 1980s is worth checking for original wiring and a small distribution board before a kitchen with modern appliances is fitted.
Our Sri Petaling guide and related cost guides:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteSri Petaling is in southern Kuala Lumpur, bordered by OUG, Kuchai Lama and Bukit Jalil. We cover Taman Sri Petaling and Bandar Sri Petaling.
Next door to Sri Petaling:
The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.