Golf-course bungalows, semi-Ds, terraces and apartments. Sungai Long work planned with MPKj’s detached-house rules and hillside setbacks in mind.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.
The township’s named developments include Seri Sungai Long, Twin Palms @ Sungai Long and Tamarind Hill. It sits under MPKj, and the nearest rail link is Bukit Dukung on the MRT Kajang Line, reached by feeder bus rather than on foot. The housing combines high-end landed homes around the golf course with terrace streets and apartment blocks.
That spread gives Sungai Long a wider range of jobs than most MPKj townships — landscaping walls and pools at one end, strata interiors at the other.
| Item | Detail |
|---|---|
| Local council | Kajang Municipal Council (MPKj) |
| Development | from 1989, around a golf course |
| Housing | high-end landed homes around the golf course, plus terraces and apartments |
| Developments | Seri Sungai Long, Twin Palms @ Sungai Long, Tamarind Hill |
| Rail | Bukit Dukung MRT (Kajang Line), by feeder bus |
Detached houses. MPKj’s building-plan form for a rumah sesebuah (in use from 3 March 2023) is submitted by an architect registered with the Board of Architects (LAM). Beyond the usual title, assessment receipt and S&P, it asks for an engineer’s declaration on the ground and soil conditions, a comment letter from MPKj’s Engineering Department, photos of the site and its surroundings dated within seven days, reinforced-concrete drawings, and sanitary and rainwater-harvesting (SPAH) plans endorsed by an M&E engineer. The plan deposit for a detached house is RM300, and hoarding around the site is charged at RM6 per metre per month for at least six months.
Setbacks for garden works. MPKj’s residential extension guideline, which covers terrace, semi-detached and detached houses, sets a 2m setback from the boundary for a swimming pool, 600mm for an ornamental pond and 2m for a retaining wall. On a sloping plot, that retaining-wall rule shapes how much level garden you can actually create.
Condominium car parks. For electric-vehicle charging bays, MPKj’s OSC runs a separate checklist (2024) that asks for a registered professional’s application, the JMB or MC’s consent for strata buildings, a letter from TNB, a road-digging permit if cables cross a council road, and a Bomba letter for DC chargers.
Two smaller points from the same MPKj documents are worth knowing. The owner’s undertaking on the detached-house form comes in two versions, one for work not yet started and one for work already carried out, so an unapproved addition is expected to be declared rather than hidden. And the fee formula charges a swimming pool or water feature at half the ground-floor rate per 9 square metres, so a pool adds to the plan fee as well as to the build cost. Heights and setbacks between the house and its boundaries follow the latest Selangor planning standards manual.
Bungalows around the golf course are where the larger projects happen: new kitchens and bathrooms, pools and decks, and boundary walls. Because many plots have a level difference, retaining walls and drainage are usually part of the brief, and the 2m setback above applies.
Terrace houses follow the usual MPKj extension rules; the typical request is a rear kitchen or covered side yard, plus gates, fences and grilles.
Apartments and condominiums need the management’s approval first. The work is mostly interiors — wardrobes, kitchen cabinet doors, flooring and leaks from the unit above.
MPKj’s request for an engineer’s ground-conditions letter on detached-house plans is a reminder that sloping plots behave differently. Before landscaping or extending on a slope, check for cracks in existing retaining walls, weep holes that no longer drain, and water seeping from the bank; those need an engineer’s view before any cosmetic work.
On landed homes, heavy rain tests roofs and gutters first. Box gutters on larger houses and the valleys of complex roofs are the usual leak points, and keeping them clear is cheaper than repairing the ceiling below.
Pools and decks bring their own maintenance: a pool shell that loses water, tiles lifting around the coping, or a timber or composite deck that has started to rot near the waterline. Diagnose the cause first; a leaking pool is a waterproofing problem, not a tiling one, and re-tiling over a failed membrane only hides it for a season.
We have not written a Sungai Long guide yet; these cover the local jobs:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWe cover Bandar Sungai Long, Seri Sungai Long, Twin Palms and Tamarind Hill.
Other pages close by:
The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.