Renovation, repairs and waterproofing for PJ’s older terraces, 1990s condos and newer sections — with the MBPJ paperwork explained before you start.

Local facts last reviewed 27 September 2026. Sources are listed at the end of the page.
PJ began in the early 1950s on the 1,200-acre Effingham rubber estate off Jalan Klang Lama. The first settlement was the Old Town, with its shop houses, community centre and bus station, and Jalan 1 was the very first road. The southern sections from Section 8 to the Old Town were settled from around 1953; the SS neighbourhoods to the west, Taman Mayang, Taman Seapark and Kelana Jaya came later. Seven decades on, a single PJ street can hold an original 1960s terrace, a rebuilt two-and-a-half-storey house and a condominium block, and each needs a different renovation plan.
MBPJ now describes its area as 97.2 sq km with more than 807,000 residents and about 276,800 property holdings (council estimate, January 2024). That is a large, mature housing stock, and much of the work homeowners ask about is renewal rather than new build: bathrooms that have leaked for years, kitchens rebuilt around old wiring, flat roofs and parapets that need resealing.
| Item | Detail |
|---|---|
| Local council | Petaling Jaya City Council (MBPJ) |
| Council area | 97.2 sq km; 807,879 people and 276,793 property holdings (MBPJ, Jan 2024) |
| District population | Petaling district: 2,298,130 people and about 617,700 households — the largest district in Malaysia (Census 2020) |
| Oldest sections | Old Town and PJ South (from about 1953); SS and PJ West sections later |
| Rail | Taman Jaya or Kelana Jaya LRT (Kelana Jaya Line), depending on the section |
MBPJ’s building-control FAQ is blunt: under Section 70(1) of the Street, Drainage and Building Act 1974 (Act 133), no building, addition or renovation may be carried out without the local authority’s prior written permission. For a home renovation, the owner appoints a consultant to submit the application before any construction starts, and submissions go online through MBPJ eBuilding and the KPKT OSC 3.0 Plus system.
The council splits applications by size. Minor works use form PB.B13, standard “pelan setara” add-ons such as a typical rear extension use PB.B04, and full building plans for an individual house use PB.B03. Among other items, the minor-works checklist asks for proof of ownership, the latest assessment and quit-rent receipts and colour site photos; if you live in a strata unit it also needs a permission letter from your JMB or JMC. Replacing the original roof structure (not just the roof tiles or sheets) needs an engineer’s drawing and calculations.
Two conditions attached to MBPJ minor-works approvals affect how a job is run on site: the renovation-permit banner has to be displayed, and work is allowed from 8am to 6pm only, not on Sundays or public holidays. Mixing cement on the road is not allowed. We plan the programme around those hours from the first quote so there are no surprises for you or your neighbours.
Reading PJ’s map by age helps predict what you will find behind the tiles:
One PJ-specific detail: MBPJ’s pelan setara form requires a structural plan and reinforced-concrete calculations for housing on former mining land and ex-landfill sites, naming PJS, SS 7 and PJU 1A (Kelana Idaman). If your house is in one of those areas, allow for an engineer from the start of any extension.
By March 2025 MBPJ had identified 53 flood hotspots across the city, 28 of them resolved and 19 in progress. In April 2026 it named seven for priority works, including Taman Sri Manja, Taman Buana Perdana, Taman Dato Harun, Taman Medan Baru and Jalan PJS 10/11E. On 18 July 2026 Kampung Sungai Kayu Ara and Kampung Chempaka were hit by flash floods and a landslide.
In May 2026 the council said it would order homeowners to remove illegally covered drains in front of houses, and the mayor said PJ’s drains cannot cope with more than 60mm of rain in an hour. If you are paving the front yard or building a car-porch ramp, keep the drain open and accessible; covering it is exactly what MBPJ is now issuing notices about.
These are the services PJ homeowners most often ask us about, each with a detailed local guide covering prices, materials and the MBPJ or strata steps:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWe cover the whole MBPJ area, from the Old Town and Section 17 to SS2, Kampung Tunku, Bukit Gasing, Kelana Jaya and the PJU sections.
If your property is just outside PJ, these pages cover the neighbouring councils and estates:
The local facts on this page were checked against the sources below on 27 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.