Single-storey freehold terraces that have barely changed in decades — what DBKL’s terrace guideline allows, and the repairs these houses need.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.
Kepong Baru is one of the older landed pockets of Kepong, sitting between Bandar Menjalara, Taman Usahawan and Segambut, and it is mostly single-storey freehold terrace housing. A Star columnist who returned in 2015 after forty years found his old neighbourhood had changed very little, even as Segambut and Jalan Kepong around it were redeveloped. That stability is what makes it a renovation neighbourhood: owners tend to adapt the house they have rather than move.
The Kepong Baru MRT station on the Putrajaya Line now serves the area. Two ambitions come up again and again for a single-storey terrace — a bigger kitchen at the back, or a whole upper floor. Both are possible under DBKL’s rules, but they are building-plan jobs, not minor works.
| Item | Detail |
|---|---|
| Local authority | Kuala Lumpur City Hall (DBKL) |
| Housing | mostly single-storey freehold terraces |
| Neighbours | Bandar Menjalara, Taman Usahawan, Segambut |
| Rail | Kepong Baru MRT station (Putrajaya Line) |
| Key guideline | DBKL terrace renovation guideline for standard lots, in force 1 Jan 2017 |
DBKL’s guideline for renovating one-, two- and three-storey terraces on standard lots (wider than 5,490mm, typically about 6,000mm) replaced the older rules used since 15 May 2013. Applications are submitted by an architect or a registered draughtsman through DBKL’s One Stop Centre and decided by its One Stop Centre committee before any construction starts. It does not cover townhouses, cluster homes, semi-detached houses, bungalows or strata-titled homes.
Going up. A storey can only be added where the housing area received its certificate of fitness (CF) or CCC more than ten years ago, and a single-storey terrace may become two storeys, not three. A new floor may be no more than 3,500mm high, the building no more than 12,000mm overall, and a registered engineer has to confirm the original structure can carry the addition and submit structural calculations. The party wall has to be built entirely within your own lot, rise at least 230mm above the roof and have no windows or openings towards the neighbour.
Setbacks. At the front, a ground-floor extension stops 4,500mm from the boundary (a single-height porch roof may run to the boundary), an upper-floor wall stops 3,000mm back, and an open, unroofed balcony may come to 1,500mm. At the back it depends on what is behind you: with a back lane of 3,000mm or more you may build to the boundary; with a lane between 1,500mm and 3,000mm you may still build to the boundary if windows facing the rear neighbour are high-level, at least 2,000mm above the floor, or set back 750mm with ordinary windows. Roof eaves may overhang 500mm including the gutter, a light-and-air jack roof is capped at 1,500mm, and the roof design, material and colour should follow the original scheme.
The Star reported in June 2026 that back-to-back floods in April had submerged two Kepong Baru neighbourhoods, the commercial strip around Jalan Development in Taman Kepong and Taman Antoi. The Kepong MP said the authorities had identified illegal drain modifications, illegal bridges built on private land that narrowed the water channel, and rubbish as causes, and repair of the drain behind Jalan Development began after the investigation. DBKL started upgrading the drains on Jalan Antoi Kanan 2 on 29 April.
Residents link Taman Antoi’s floods to Sungai Keroh and the diversion of its water towards the Jinjang retention pond; in 2025 a federation of Kepong residents’ associations reported that a flood wall along the river and a deeper Taman Pusat Kepong retention pond were among the agreed short-term measures. For homeowners the lesson is local and practical: do not narrow or bridge the drain in front of your house when you build a porch or ramp, and raise sockets and use water-tolerant materials low down on the ground floor if your street has flooded before.
Useful guides for Kepong Baru terrace owners:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWe cover Kepong Baru and its neighbours, from Taman Kepong and Taman Antoi to Bandar Menjalara and Taman Usahawan.
Close to Kepong Baru:
The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.