DBKL’s 1980s new town: flats, narrow-lot terraces and LRT-side condos, renovated with the strata rules and DBKL’s small-lot guideline in mind.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.
Wangsa Maju was carved out of the Hawthornden rubber estate in Setapak and conceived in 1984, the Federal Territory’s tenth anniversary year; its proposed name was Bandar Baru Titiwangsa Maju. When the Prime Minister opened the new town on the Hawthornden estate on 26 February 1984, he described it as the second new town developed by Kuala Lumpur City Hall, after Bandar Baru Tun Razak (begun in 1975), built as a joint venture between DBKL and the company Paremba, and noted that the project was introducing more modern and faster building methods to local contractors. Most of the homes were to be sold directly to the public, with DBKL keeping a small number to rent to low-income families moved by government projects.
The township today has Sections 1, 2, 4, 5, 6 and 10 (there is no 3, 7, 8 or 9). One of its earliest developers, PGK Sdn Bhd, built medium- and high-rise condominiums, double-storey terraces, semi-detached houses, shops and offices with City Hall, and demand from college students fuelled later growth. Section 1 is still mostly low-cost flats with some shophouses. The Sri Rampai, Setiawangsa and Wangsa Maju LRT stations serve the area. The P.116 Wangsa Maju constituency, which covers only some of the sections and stretches to Danau Kota and Taman Melati, counted 215,600 residents in Census 2020.
| Item | Detail |
|---|---|
| Local authority | Kuala Lumpur City Hall (DBKL) |
| Origin | carved from the Hawthornden rubber estate; DBKL new town opened 26 Feb 1984 |
| Sections | 1, 2, 4, 5, 6 and 10 |
| Population | P.116 Wangsa Maju 215,600 (Census 2020) |
| Rail | Sri Rampai, Setiawangsa and Wangsa Maju LRT stations |
Flats, apartments and condos. DBKL’s guidelines page carries a separate renovation procedure for strata buildings (dated 5 August 2023) and the Commissioner of Buildings Kuala Lumpur circular COBKL 2023/01 on renovating residential and commercial strata buildings, which stops owners building new internal partitions to add rooms. DBKL also publishes guidance on enclosing balconies in strata-titled homes and a safety-handrail design for balconies, so ask management which of these they apply before you plan a balcony conversion or grille. The JMB or MC’s written consent comes first in every case.
Narrow-lot terraces. Since 20 April 2015 DBKL has applied a guideline for additions to one-, two- and three-storey terraces on small lots. Its original text defines a small lot as an intermediate lot narrower than 20 ft and shallower than 70 ft, under 1,400 sq ft in land area; DBKL’s later standard-lot guideline (from 1 January 2017) treats lots wider than 18 ft as standard, so if your lot is between 18 and 20 ft wide, ask DBKL which table it will apply. On small lots, a ground-floor extension must stay 4,500mm from the front boundary so a car can still be parked, the porch roof may run to the boundary, and first- and second-floor additions may come to within 1,000mm of the front boundary. Corner lots keep 1,500mm to the side wall. The guideline does not apply to townhouses, cluster homes, semi-detached houses, bungalows or strata-titled homes, and plans are submitted through DBKL’s One Stop Centre.
The common thread in Wangsa Maju is age and density rather than slopes or rivers. In buildings from the 1980s, water supply and waste pipes set into walls and floors were not designed to be reached easily, and a concealed pipe that starts leaking now often shows up as damp in a neighbour’s ceiling first. Before retiling a bathroom in an older block, it is worth a pressure test on the concealed pipes so you are not sealing a leak under new tiles.
In landed rows, the party wall is the other shared element. Cracks along it, or damp where an extension meets the neighbour’s roof, are common in houses that have been added to at different times. Agree the scope with the neighbour before work starts: DBKL treats repair of an existing party wall as a permit item that needs the adjoining owner’s consent.
For costs and methods, see:
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWe work across Wangsa Maju’s sections, Taman Sri Rampai, Taman Bunga Raya, Desa Setapak and Taman Melati.
Nearby pages:
The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work: