Renovation Contractor in Bangsar South – ClickBina
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📍 Serving Bangsar South

Renovation Contractor
in Bangsar South

Condo units, SOHO suites and serviced apartments on the old Kampung Kerinchi land — interior renovation and leak repairs planned around strata rules.

Built-in wardrobe being installed in an open-plan serviced apartment in Bangsar South
Bangsar South is a developer-built district on the site of Kampung Kerinchi, so nearly every job here is inside a strata building. That means your management body, not only DBKL, decides what you may change, and the towers themselves are old enough to fall under Kuala Lumpur’s periodic-inspection rule for buildings above five storeys. Below: where Bangsar South came from, how renovation is approved in its towers and in the older Kerinchi flats, and which leaks and disputes come up most in high-rise units.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.

Long before the office towers, this was Kampung Kerinchi, a settlement that traces its roots to the eighteenth century when a Kerinci community from Sumatra settled here, according to Free Malaysia Today. In the mid-2000s UOA Holdings bought a 60-acre leasehold site within Kampung Kerinchi, near Pantai Dalam, and set about rebranding it with billboards as Bangsar South. Its 2007 plan put about half of the land into housing — a residential component called The Park, drawn up as 2,100 condominium units in eight blocks — and the other half into offices and retail, including The Horizon, The Vertical and The Sphere.

The Edge reported in July 2009 that the first phase of The Horizon had just received its certificate of fitness, and that the first two blocks of The Park Residences were scheduled for early 2010. Around the new district the older affordable blocks remain: the Vista Angkasa apartments and the Kampung Kerinchi and Sri Angkasa flats, with Pantai Panorama and Pantai Hillpark condominiums a short drive away in Pantai Dalam.

Bangsar South at a glance

ItemDetail
Local authorityDBKL; strata matters via the Commissioner of Buildings (COBKL)
Former nameKampung Kerinchi (settled in the 18th century)
Master development60-acre leasehold mixed development by UOA, about half residential
Earliest completionsThe Horizon phase 1 CF in 2009; first Park Residences blocks planned for 2010
RailKerinchi LRT (Kelana Jaya Line)

Who signs off a renovation in a Bangsar South tower

For work inside your own unit, the first approval is almost always the management body’s. DBKL’s owner-applied minor-works permit is written for landed houses on individual lots, shophouses, offices and shopping-mall retail lots, not condominium parcels. For a condo, the Commissioner of Buildings’ strata renovation procedure decides whether your job needs the JMB’s or MC’s written permission or an owners’ resolution because it touches common property; since August 2023 circular COBKL 2023/01 also rules out extra-room partitions in KL strata homes.

Many Bangsar South units are serviced apartments or SOHO suites rather than conventional condos. DBKL publishes separate planning guidelines for service apartments and for SOHO developments, and the same strata renovation procedure applies to them. If you are buying a SOHO to live in, check the building’s by-laws on wet works and kitchen hoods before you design a full kitchen.

Renovation noise has its own paperwork too: DBKL lists a guideline on nuisance procedure in strata buildings, dated March 2023. Your building’s house rules on working hours are the first thing to check before booking noisy work.

What the towers and the older flats usually need

Buildings approaching or past ten years. Under Section 85A of the Street, Drainage and Building Act 1974, as applied in DBKL’s guideline on periodic building inspections, the Mayor can require the owner of a building above five storeys — for a strata block, its management corporation — to appoint a professional engineer to inspect it after the tenth year from its first certificate of fitness or CCC, and then at intervals of not more than ten years. The earliest Bangsar South blocks were completed around 2009–2010, so this is now a live issue for some management bodies; repairs that come out of such an inspection can affect the lifts, facade and roof works your renovation has to fit around.

Inside the unit. In units of this age the recurring items are bathroom membranes that have started to leak into the unit below, aircon condensate and trunking leaks, balcony floor drains and window seals — plus layout and carpentry upgrades for owners replacing developer finishes.

The Kerinchi and Angkasa flats. The older affordable blocks around the district are strata too, so the same approval route applies. In flats of that age, re-tiling, re-piping and repainting tend to matter more than layout changes.

High-rise logistics and leaks

In a mixed office-and-residential district, the site constraints are loading bays, booked service lifts and guard-house passes rather than street parking. Materials have to be scheduled around the management’s delivery windows, and debris goes out the same way, so we plan both from the first quote.

The weather risk sits at the building envelope: wind-driven rain at window frames and sliding doors, ponding on balconies, and water tracking along aircon pipes into ceilings. Where a leak appears in your ceiling, the first question is whether it comes from your own unit, the unit above or common property — that decides who pays under the strata rules.

Bangsar South jobs we quote

These guides cover the condo problems we are most often asked about here:

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Bangsar South and Kampung Kerinchi

Bangsar South is reached from the Kerinchi exit of the Federal Highway, between Pantai Dalam and Mid Valley. We also cover the Kerinchi and Angkasa flats and Pantai Dalam’s condos.

Neighbouring areas

Close to Bangsar South:

Bangsar South renovation questions

Do I apply to DBKL or to management for my Bangsar South unit?
Start with management. DBKL’s owner-applied minor-works permit is written for landed houses, shophouses and offices; for condo units, the Commissioner of Buildings’ strata procedure sets what needs the JMB’s or MC’s written consent.
My building is over ten years old. Does that matter?
Under Section 85A of Act 133, DBKL can require buildings above five storeys to be inspected by a professional engineer after the tenth year from the first CF or CCC, then at least every ten years. Resulting repairs can affect common areas around your unit.
Can I build a full kitchen in a SOHO or serviced apartment?
Check your building’s by-laws first. DBKL has separate planning guidelines for SOHO and service apartments, and management decides what wet works it allows.
Who pays for a ceiling leak from the unit above?
It depends on where the water comes from — the upper unit, your own unit or common property. Our inter-floor leakage guide explains how that is usually established.
Can renovation noise lead to a complaint?
Yes. DBKL publishes a nuisance-procedure guideline for strata buildings (2023), and most managements set fixed hours for noisy work.
How do I get a quote for a unit here?
Send your job details and your floor plan on WhatsApp for a free quote — we reply within the hour. A site visit is free.

Sources & official references

The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:

Need a Contractor in Bangsar South?

WhatsApp us your property details — free quote within the hour.

WhatsApp ClickBina← Home
💬 Get Your Free Quote