TTDI’s terraces, semi-Ds and condos, next to Bukit Kiara — renovation planned with DBKL’s terrace-extension and minor-works rules in hand.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.
Taman Tun Dr Ismail was developed from 1973 on former plantation land, and it has aged into one of Kuala Lumpur’s most settled neighbourhoods: landed streets such as Lorong Rahim Kajai, Lorong Datuk Sulaiman and Lorong Aminuddin Baki, townhouses, and condominiums added later, with terrace designs that vary from section to section. The Taman Tun Dr Ismail MRT station on the Kajang Line serves the area.
With houses now forty to fifty years old, TTDI renovation briefs tend to be substantial: an extra storey or a rebuilt rear, wet areas taken back to the slab, and new wiring and plumbing. Planning disputes have a long local history: in April 2023 the Federal Court quashed the development order for a 29-storey block and eight serviced-apartment blocks on the 10.08-hectare Taman Rimba Kiara park after a residents’ challenge.
| Item | Detail |
|---|---|
| Local authority | Kuala Lumpur City Hall (DBKL) |
| Developed | from 1973, on former plantation land |
| Housing | terraces (design varies by section), semi-Ds, townhouses and condominiums |
| Hillside neighbour | Bukit Kiara, along Jalan Abang Haji Openg |
| Rail | Taman Tun Dr Ismail MRT station (Kajang Line) |
Extending a terrace. DBKL’s renovation guideline for 1-, 2- and 3-storey terrace and link houses on standard lots (in force from 1 January 2017) applies to lots wider than 5,490mm (18 ft) — typically about 6,000mm. Among its limits: a ground-floor addition keeps at least 4,500mm from the front boundary, the car-porch roof may run to the front boundary, a first-floor addition keeps 3,000mm, and an open, unroofed balcony may come to 1,500mm. At the back, a lot with a rear lane of 3,000mm or more can build to the boundary on every floor. Plans must be submitted by an architect or registered draughtsman through DBKL’s One Stop Centre, and the centre’s committee (JKPS) makes the final decision. The guideline does not cover townhouses, cluster homes, semi-detached houses, bungalows or strata-titled homes.
Smaller works. DBKL’s minor-works permit guideline (third edition, updated 30 September 2025) lists what needs a permit on an individual landed lot: replacing a gate (opening no wider than 6,100mm), replacing a fence with a masonry wall up to 2.7m (1.8m solid plus 0.9m see-through) — or 1.5m for terrace and link houses — welding grilles in place, new plaster ceilings, re-tiling floors and walls, replacing roof tiles without touching the trusses, a bigger or relocated water tank, repairing existing plumbing, and EV chargers or solar panels. Each permit costs RM100, covers one item and must be completed in three months; work is allowed Monday to Saturday, 9am to 6pm. The owner applies directly, with a statutory declaration sworn before a Commissioner for Oaths.
The same guideline lists work that needs no permit: aircon, factory-made grilles, electrical wiring, lights and CCTV, painting, gutters and downpipes, panel (non-plaster) ceilings, wallpaper and built-in cabinets. That split is useful when planning a TTDI refresh: a repaint and new carpentry can start as soon as you are ready, while the fence and ceiling items need their own permits.
Terraces. Because terrace designs differ by section, the lot width decides which DBKL guideline applies — standard-lot houses wider than 18 ft use the rules above, narrower lots have their own small-lot guideline. Houses of TTDI’s age often carry earlier extensions, so the draughtsman’s first job is to compare what stands on site with what was approved.
Semi-detached houses and townhouses. Neither is covered by the standard-lot terrace guideline, so an addition goes through a full building-plan submission. For semi-Ds, DBKL’s separate semi-detached guideline asks that an added storey follow the original roof design, finish and colour.
Services. At forty-plus years, original concealed pipes and wiring are worth replacing while walls are open, and wet areas generally need a new membrane rather than tiles laid over old ones. Repairing existing plumbing is on DBKL’s minor-works list, so budget for the permit.
On 18 April 2026 a retaining wall at a hillside landscaping project linked to a proposed Bukit Kiara arboretum collapsed after rapid tree clearing. Two days later ankle-deep muddy water ran along Jalan Abang Haji Openg; Malay Mail described the project as affecting about 300 homes. The Public Works Department’s preliminary finding was that hillside run-off had overwhelmed the drainage, and a stop-work order was issued. In May 2026 DBKL imposed a 300m buffer zone on a proposed pair of 30-storey condominiums opposite the Bukit Kiara park, far wider than the previous 50m guideline set by the National Landscape Department. TTDI was also among the areas named in the flash floods of 26 September 2026.
For homes on the hillside edge, that record argues for renovating to shed mud and water: keep the front and perimeter drains open (replacing a perimeter drain inside the lot is itself a DBKL minor-works item), raise the threshold of the car porch where the approved plans allow, and use tiled or cement-board finishes low on ground-floor walls.
Guides with prices and detail for the work TTDI owners ask about most:
Send us a photo of the job on WhatsApp — we reply within the hour with a free quote.
💬 Get Your Free QuoteTTDI lies beside Bukit Kiara in west Kuala Lumpur; we cover the landed lorongs, the townhouses and the condominiums across the area.
Next door to TTDI:
The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:
WhatsApp us your property details — free quote within the hour.