Waterproofing Contractor in KL & Klang Valley – ClickBina
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
💦 Waterproofing

Waterproofing
Contractor in KL

Leaks, damp and ceiling stains? ClickBina diagnoses the source and waterproofs it properly — bathrooms, balconies, roofs, basements and external walls — with a warranty across the Klang Valley.

Applicator rolling liquid waterproofing membrane across a flat condominium rooftop
ClickBina is a waterproofing contractor serving KL and the Klang Valley. We don’t just patch stains — we trace the source of the leak and apply the right waterproofing system for the area, backed by a warranty, so the problem stays fixed.

Most ceiling and wall leaks in Malaysia come from failed bathroom waterproofing, balcony seepage, or roof and pipe problems. Patching the stain without fixing the source just delays the next leak — so we always trace the cause first.

Dealing with a stain right now? Our ceiling leak repair guide → explains the common causes and who pays in a condo. For wet-area work, see our bathroom renovation guide →.

We waterproof homes, condos and commercial units across the Klang Valley. Send us your job details and we’ll advise on the cause and a fix.

Every Wet Area Covered

The right system for each surface — not a one-size patch.

🛁
Bathrooms & Wet Areas

Membrane waterproofing before tiling — the most common (and disputed) leak source.

🏠
Balconies & Terraces

Exposed-area waterproofing that handles sun, rain and movement.

🌧
Roofs & Gutters

Flat-roof membranes, flashing and gutter repairs for landed homes.

🪟
Basements & Car Parks

Negative-side and structural waterproofing for below-grade areas.

🤳
External Walls

Crack injection and elastomeric coatings to stop wall seepage.

🔎
Leak Diagnosis

Tracing the true source before any repair — we fix the cause, not the symptom.

Why Choose Us

🛡
Warranty-Backed

Workmanship and waterproofing warranty on completed works.

🔍
Source-First

We diagnose where the water really comes from before quoting.

🏢
Strata-Ready

We handle inter-floor leak situations and management requirements in condos.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Waterproofing — Common Questions

How much does waterproofing cost in Malaysia?
It depends on the area and system — bathroom re-waterproofing typically runs RM1,500–RM5,000, while balcony, roof and wall works vary by size and access. We quote after diagnosing the source.
Do you give a waterproofing warranty?
Yes. We provide a workmanship and waterproofing warranty on completed works, so you have recourse if a treated area leaks again.
Can you find where a leak is coming from?
Yes. Water travels along slabs and beams, so we inspect the area above and around the stain — bathrooms, pipes, roof — and may use a ponding test or moisture meter to confirm the source.
Who is responsible for a leak between condo floors?
Generally the unit above is responsible if the leak comes from their floor or bathroom; common-property pipes are the management's responsibility. We handle these inter-floor situations and document them for you.
Do I need to re-tile after bathroom waterproofing?
Bathroom waterproofing goes under the tiles, so re-waterproofing usually means removing and re-laying the floor tiles. We handle the full job, tiling included.

The maintenance calendar that catches leaks before they start:

Home maintenance checklist

Get a free, no-obligation quote

Fill in a few details and it opens WhatsApp with your enquiry ready to send. We reply within the hour.

No spam — your details go straight to our team on WhatsApp.

Get a Free Waterproofing Quote

WhatsApp us your requirements — we reply within the hour.

WhatsApp ClickBinaBrowse Guides
💬 Get Your Free Quote