A second pair of eyes on the work your contractor did, before you pay the next claim, before the ceiling closes and before the final payment. We reply on WhatsApp within the hour.

A renovation inspection is a check of the work your own renovation contractor did, made by someone who is not that contractor, at the moments when a mistake is still cheap to fix: before a progress payment, before walls and ceilings are closed, and before the final payment at handover. Think of it as a home inspection for the renovation, not for the house: ClickBina offers a third-party inspection of your contractor's work; if you want, we can also quote the repairs. If you are doing the check yourself, start with the renovation handover snag list and the guide to inspecting each stage before it is covered up.
Booked around your payments and the stages of the works, not after everything is covered.
Is the work in this claim done, and done properly, before you pay it?
Wet areas, ceiling space and anything that will disappear behind plaster.
A clear list of what still needs rectifying before the final payment.
A re-check before the money held back for defects goes to the contractor.
A neutral look at the defect you and the contractor disagree on.
What the last contractor left behind, before the next one starts.
Renovating from overseas, another state or a rental unit.
Most homeowners in the Klang Valley meet the word inspection when they collect keys to a new home: the developer hands over the unit, you list the defects, and the developer repairs them. A renovation is a different job. The work was done by a contractor you chose and paid, under a quotation or contract you signed, and nobody else is checking it for you. If the contractor is also the one who decides whether the work is finished, the only person on your side of the table is you.
A renovation inspection puts a second pair of eyes on that work. The inspector walks the finished or half-finished works against what you were promised: the quotation, the drawings, the materials you chose and the way each trade is normally expected to leave its work. What comes out of it is a clear list of what is acceptable, what needs rectifying and what cannot be judged until a later stage.
It is not a design review and it is not a second quotation for the whole job. It also does not take sides by default: plenty of inspections end with the news that the work is fine and the contractor can be paid. That is useful too, because a payment released with confidence is worth more than one released with doubts.
The value of an inspection depends on timing. The same hollow tile costs a few minutes to lift before grouting and a whole afternoon after the floor is sealed and furnished. These are the moments that matter most:
| Moment | Why it matters | Guide |
|---|---|---|
| Before a progress payment | Each claim should match work that is actually done to standard | progress claim check |
| Before walls and ceilings are closed | Pipes, waterproofing and anything inside the ceiling space disappear after this | the stage inspection guide linked above |
| At handover, before the final payment | The last moment the contractor is still waiting to be paid | handover documents |
| Before you release the retention sum | Retention exists so defects found after handover still get fixed | retention release |
| When you and the contractor disagree | A neutral view of one defect often ends an argument faster than a letter | getting a third-party view |
| When the contractor has left mid-job | The next contractor should know what they are taking over | takeover inspection |
| When you cannot be on site | Owners abroad, in another state, or renovating a rental unit | renovating from overseas |
The two look alike on site, because both involve tapping tiles and running taps, but the paperwork and the person responsible are different. If your home is newly handed over by a developer, the new-home defect inspection page is the one you want.
| Renovation inspection | New-home defect inspection | |
|---|---|---|
| Whose work is checked | Your own renovation contractor, ID firm or the trades you hired | The developer's |
| What the work is checked against | Your quotation, drawings, materials list and any written contract | The sale and purchase agreement and the approved plans |
| Who rectifies | The contractor, under whatever you agreed with them | The developer, during the defect liability period |
| Typical timing | During the works, at handover, before the last payment or the retention release | Key collection and before the defect liability period ends |
| If they refuse | Your contract, then the consumer tribunal or court route | The housing tribunal or the developer's obligations under the sale agreement |
Every renovation is different, so the list follows your scope rather than a fixed form. On most residential jobs the walk-through covers:
An inspection looks at what can be seen, measured and operated on the day. It does not open up finished walls, floors or ceilings, so the earlier stages are where hidden work gets checked. The renovation photo log guide explains how to keep your own record of what went behind the plaster.
A fair inspection needs a yardstick. The strongest one is your own paperwork: the itemised quotation, the drawings, the brand and model list, and any messages in which a change was agreed. Where the paperwork is silent, the yardstick is the way each trade is normally expected to leave its work, such as tiles that sound solid when tapped and floors that drain to the trap. The guide to workmanship tolerances explains how CIDB's QLASSIC standard describes acceptable finishes.
That is also why the inspection is useful to the contractor. A list that points to the quotation line or the drawing is easier to act on than a complaint that something looks wrong, and it keeps the discussion on facts. If there was never a written contract, the guide to your rights without a written contract covers what still counts as evidence of what was agreed.
If the contract has no clause about third-party inspections, tell the contractor before the visit. Most accept it, and a clause for the next job is covered in the guide to putting inspection rights in your contract.
A finding is only useful if it leads somewhere. Send the list to the contractor in writing, ask for a date to rectify each item, and arrange a re-check before you pay the amount that was held back. Most items are settled at this point, because the contractor can see exactly what needs doing.
If the contractor will not fix the work, the guide to defects a contractor won't fix sets out the steps, and the guide to using inspection findings as evidence explains what makes a record usable at the Tribunal for Consumer Claims. Who pays for rectification depends on what was agreed, which the guide on who pays after an inspection walks through. If you would rather have the repairs done by someone else, that option is open too: if you want, we can also quote the repairs.
Two kinds of work need a specialist's word, not only a visual check. Lights that flicker, a trip switch that keeps tripping, or a socket that feels warm should go back to the contractor's electrical subcontractor straight away. Any repair or change to the electrical installation must be done by an electrical contractor registered with Suruhanjaya Tenaga.
Hacked walls, new openings, extensions and cracks that keep growing are structural questions. A crack, sagging beam or removed wall that may affect the structure needs a professional engineer's assessment. An inspection can flag that a question exists; it does not answer it. For rewiring, the guide to the test certificate to ask for after rewiring lists the paperwork.
In a condo, the management office usually holds a renovation deposit and inspects the common areas and the unit's external face before refunding it, so damage to the corridor or a blocked common drain becomes your problem. The guide to the condo renovation deposit inspection explains what management usually looks at. In a landed house the scope is wider: the roof, gutters, car porch, perimeter drains and any extension, each of which is easiest to check while the scaffolding is still up.
Landlords have a third situation: a rental unit renovated between tenants, often without the owner on site. The landlord's quality check guide covers what to look at before the next tenant moves in.
Plenty of owners check their own renovation, and a careful walk-through with a checklist catches most problems. An outside inspector earns their place when the job is large, when you are not sure what acceptable looks like, when you cannot be on site, or when a payment or a dispute depends on the answer. The DIY or inspector comparison lays out the trade-offs, and the questions to ask an inspector help you compare whoever you call.
WhatsApp us to book a renovation inspection — we reply within the hour. Third-party inspection of your contractor's work; if you want, we can also quote the repairs. Any visit fee is confirmed with you on WhatsApp before we come. We cover KL, Selangor & Putrajaya.
💬 Book a renovation inspectionYou agree what we check on WhatsApp before we visit.
Tell us your area, the type of home and the stage the works are at. We reply within the hour.
We confirm what will be checked and when. Any visit fee is confirmed with you on WhatsApp before we come.
We walk the works against your quotation, drawings and materials list, room by room.
We go through what we found with you, and if you want, we can also quote the repairs.
Checklists, payments and handover — guides for checking your contractor’s work:
Fill in a few details and it opens WhatsApp with your enquiry ready to send. We reply within the hour.
No spam — your details go straight to our team on WhatsApp.
WhatsApp us to book a renovation inspection — we reply within the hour. Any visit fee is confirmed with you on WhatsApp before we come.