Kitchen Renovation Contractor in KL & Selangor
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🍳 Kitchen Renovation

Kitchen Renovation Contractor
in KL & Selangor

We design and build kitchens in condos, terraces and landed homes: layout, custom cabinets, worktops, wet kitchens and tiling as one job. Flat price, no hidden charges, and we reply on WhatsApp within the hour.

Renovated terrace house kitchen with custom cabinets, a quartz worktop and a glass partition to the wet kitchen

ClickBina is a kitchen renovation contractor in KL, Selangor and Putrajaya: we design the layout, build the cabinets and do the hacking, tiling, wet-kitchen work and finishing as one job, at a flat price with no hidden charges. A typical Klang Valley kitchen takes three to six weeks on site once the design is fixed. If you are still working out the budget, start with our kitchen renovation cost guide or try the kitchen renovation calculator; this page is about what we do, how a project runs and what to decide before work starts.

One Team, From Layout to Handover

Every part of the kitchen, quoted as one scope.

📐
Kitchen design & layout

We measure the room and draw the layout around your sink, hob and appliances before anything is built.

🔨
Custom cabinets & worktops

Cabinets built to the measured room, with the worktop templated from the installed cabinets.

🧱
Hacking, tiling & flooring

Strip-out of the old kitchen, new wall and floor tiles, and a level base for the cabinets.

🚿
Wet kitchen build

Waterproofing under the tiles, a proper fall to the drain and a partition to close off the cooking area.

🔧
Plumbing & power points

New pipe runs and power points, planned in the layout drawing before any tiling.

💡
Ceiling, lighting & paint

Plaster ceiling, downlights, under-cabinet lighting and the final paint and clean.

Kitchen renovation in KL & Selangor: what we do

Most kitchens we are asked to renovate fall into one of three jobs. The first is a refresh: the layout stays, but the cabinets, worktop and wall tiles are replaced. The second is a full renovation, where the room is stripped back to the walls and floor, the sink, hob and power points may move, and a wet and dry split is often added. The third is a kitchen done as part of a whole-house renovation, which is usually the most efficient way to do it because the hacking, debris removal and trades are shared with the rest of the house.

Whichever it is, we handle the design and the build. You deal with one team from the first measurement to the final clean. If you would rather keep the cabinets and only change the doors or finish, the cabinet respray guide and the door replacement guide cover those smaller jobs.

Typical kitchen jobs by property type

The same brief plays out differently in a condo, a terrace house and a semi-D, mainly because of space, building rules and where the wet kitchen can go. The table below is a planning guide, not a fixed scope.

PropertyWhat usually changesWhat to check first
Condo or apartmentNew cabinets and worktop, wall tiles, lighting; a glass partition to close off the cooking areaManagement approval, working hours, lift booking and where the gas and exhaust can run
Terrace houseDry kitchen in front, wet kitchen at the back; often a new cabinet run and a raised or re-tiled wet floorWhether the back area is an original kitchen or an earlier extension, and the state of the drains
Semi-D or bungalowBigger layouts, islands, a show kitchen with a separate wet kitchen, pantry or storeStructural walls before anything is removed, and how much the island moves the plumbing
Older house or walk-up flatRewiring and re-piping behind the new kitchen, levelling uneven floors and wallsThe age of the pipes and wiring, and whether the old tiles hide a failed waterproofing layer

For layout ideas sized to each home, see the design galleries for condo kitchens, terrace house kitchens and semi-D and bungalow kitchens.

Design first, then build

A kitchen goes wrong most often when building starts before the decisions are made. We start with an accurate measurement and a layout drawing that fixes where the sink, hob, hood, fridge and oven sit, because those positions decide every water, drainage and power point behind the walls. Then the cabinet design, worktop, tiles and lighting are chosen around that layout, and the appliance models are confirmed so the cut-outs can be sized to them.

If you are still choosing a shape, the kitchen layout guide compares galley, L-shape, U-shape and island kitchens, and the kitchen design gallery shows styles by home type. Keeping the sink and hob where they are is the single biggest saving in most kitchens; moving them is possible, but it is a decision to make at the drawing stage, not halfway through.

Wet and dry kitchens

Many Malaysian homes cook with high heat, so a wet and dry split is the most common request we get. The dry kitchen holds the show cabinets, worktop and light cooking; the wet kitchen takes the wok burner, the main sink and the mess, behind a partition or a door. In a terrace house the wet kitchen usually sits at the back; in a condo it is often closed off with a glass panel.

The wet kitchen is where hidden work matters most. The floor needs a waterproofing layer under the tiles, a proper fall to the drain and wet-zone cabinets that do not swell. The kitchen waterproofing guide explains what should go under the tiles, and the wet kitchen design guide covers the layout.

Cabinets, worktops and finishes

Cabinets are the largest part of almost every kitchen, and the material matters more in the wet kitchen than anywhere else. We build custom cabinets to the measured room, so they fit the walls as they actually stand rather than a catalogue size; our custom cabinets service covers kitchens, wardrobes and TV units. For wet-zone carcasses, the plywood cabinet guide explains why moisture-resistant boards are the usual choice.

The worktop is measured from the installed cabinets, not from the drawing, so it sits flat on walls that are rarely perfectly straight. Quartz, solid surface, granite and stainless steel each suit a different way of cooking; the countertop guide compares them.

Plumbing, electrical points and gas

Behind the new kitchen there is usually more work than the owner expects: new pipe runs to a moved sink, extra power points for built-in appliances, a dedicated point for the hob or oven, and lighting circuits for under-cabinet strips. In a fair quote these are planned in the layout drawing and listed as their own lines, so nothing is added as a surprise after the tiles go on.

Gas is different. Any change to the gas piping, regulator or hob connection should be done by a gas installer registered with Suruhanjaya Tenaga, and a condo may have its own rules on gas points. Ask to see that registration before the work is booked. The exhaust ducting guide covers where a hood can vent.

How long a kitchen renovation takes

A typical Klang Valley kitchen takes three to six weeks from the start of work to handover, with custom cabinets usually the longest wait. A refresh that keeps the layout sits at the short end; a full wet and dry rebuild with moved points sits at the long end. Ordering cabinets and appliances early, once the layout is fixed, keeps the room from standing empty.

The order of works matters as much as the speed: pipes and wiring are buried before tiling, cabinets are levelled on the finished floor and the worktop is templated last. The kitchen renovation step-by-step guide walks through each stage and why it comes where it does.

Condo approval and council rules

In a condo, the owner applies to the management office with the scope of works before anything starts, and most buildings set working hours, a renovation deposit and rules on lift use and debris. If an application comes back rejected, the guide to a rejected renovation application explains the usual reasons. The form usually asks for the scope of works and a layout drawing.

On a landed house, a kitchen renovation inside the existing walls does not usually need a council permit, but removing a wall, building out at the back or adding a roof over the yard may. That is general advice only: check with your local council before any structural change, and see the rear kitchen extension guide if you plan to build out.

What your kitchen quote should show

A fair quote lists each part of the job on its own line: hacking and disposal, waterproofing, plumbing and power points, tiling, the cabinet run with its board and door material, the worktop, the partition, the ceiling and lighting, and the final clean. If two quotes are built differently, compare them line by line, not by the total. The guide to reading a renovation quote and the cabinet quote checklist list what is often left out.

A good contractor fixes the price for the agreed scope and, if something is found once the old kitchen is opened up, such as a corroded pipe, stops, shows you and prices it before carrying on. Ask how a quote handles that before you sign. Our price is flat for the agreed scope, with no hidden charges.

Areas we cover

We renovate kitchens across Kuala Lumpur, Selangor and Putrajaya, in condos, terraces, semi-Ds, bungalows and older flats. Local notes on building types and rules are in our area guides for Kuala Lumpur, Petaling Jaya and Shah Alam, and the full list of towns is on the areas we serve page.

Ready to plan your project?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

From First Message
to Handover

You see the scope and the price before any work starts.

01
WhatsApp Us

Tell us your area, property type and what you want done. We reply within the hour.

02
Site Visit & Measurement

We measure the kitchen and check the pipes, drains and walls. A site visit is free.

03
Design & Flat-Price Quote

You get the layout and a quote with a flat price for the agreed scope, no hidden charges.

04
Build & Handover

The work is done to the agreed scope, and you check the finished kitchen before handover.

Common Questions

How long does a kitchen renovation take?
A typical Klang Valley kitchen takes three to six weeks from the start of work to handover. A refresh that keeps the layout is at the short end; a full wet and dry rebuild with moved points is at the long end. Custom cabinets are usually the longest lead item, so they are ordered as soon as the layout is fixed.
Do you design the kitchen as well as build it?
Yes. We measure the room, draw the layout, design the cabinets around your appliances and then build it, so the drawing and the build come from the same team.
Can you renovate the kitchen while we are living in the house?
Usually, yes. The kitchen is out of use while work is going on, so plan for simple meals for a few weeks. Dust screens and floor protection keep the rest of the house usable, and the noisiest work, hacking, comes first.
Can the sink and hob be moved to a different wall?
Yes, but it is the change that adds the most hacking and piping, so decide it at the drawing stage. In a condo, the drainage and gas routes may limit where they can go; we check that during the site visit.
Do I need approval to renovate a condo kitchen?
Almost always. The owner submits a renovation application to the management office with the scope of works, and most buildings ask for a deposit and set working hours. Start the application early: work cannot begin before the written approval.
Should I buy the hob, hood and oven myself?
Either works. What matters is that the exact models are chosen before the cabinet drawing is signed, because the cut-outs and openings are sized to them.
How do I get a quote?
WhatsApp us your area, property type and what you want done; we reply within the hour. For new work like a kitchen renovation, a site visit is free, and the quote that follows is a flat price for the agreed scope, with no hidden charges.
Where can I see what a kitchen renovation costs?
Prices depend on the size of the kitchen, the cabinet material and whether points move. The wet and dry kitchen cost guide breaks the figures down for a split kitchen.

Costs, designs and areas — our free guides for this service:

Kitchen renovation costKitchen cost calculatorKitchen design ideasStep by stepCustom cabinetsAreas we serve

Get a free, no-obligation quote

Fill in a few details and it opens WhatsApp with your enquiry ready to send. We reply within the hour.

No spam — your details go straight to our team on WhatsApp.

Ready to Renovate Your Kitchen?

WhatsApp us your area and what you want done — we reply within the hour. A site visit is free for new work.

WhatsApp for a Quote← Back to Home
💬 WhatsApp for a Quote