Planning a new kitchen? Here is how each layout works, which suits a condo, a terrace wet kitchen or an open dry kitchen, and how the layout sets the cabinet budget.
📍 We serve KL, Selangor & Putrajaya.

The main kitchen layouts are one-wall (a single run, common in condos), galley or parallel (two facing runs), L-shape (two runs meeting at a corner), U-shape (three runs), and layouts with a peninsula or an island. Our countertop guide puts a typical single-wall kitchen at 10–14 ft of run and an L-shape at 14–22 ft, and because cabinets and tops are priced per foot run, the layout largely sets the budget. In most Malaysian homes the choice also depends on the wet and dry kitchen split: heavy wok cooking in an enclosed wet kitchen, and the showpiece layout in the dry kitchen.
The layout decides how many steps you take between the fridge, the sink and the hob, whether two people can cook at once, and how much cabinet you pay for. Finishes can be changed later; a layout that puts the hob in a corner or the sink far from the window is with you for as long as the kitchen lasts.
Designers often talk about the “work triangle” between the fridge, the sink and the hob. It is a useful check rather than a rule: keep the three close enough to work between, with nothing blocking the path, and the kitchen will feel easy whatever its shape.
| Layout | Shape | Suits | Watch out for |
|---|---|---|---|
| One-wall | One straight run of cabinets | Condos, studios, narrow wet kitchens | Least worktop; everything in one line |
| Galley / parallel | Two runs facing each other | Long narrow kitchens | The walkway between the runs must stay clear |
| L-shape | Two runs meeting at a corner | Terraces and condos with a corner to use | The corner cabinet is awkward without the right fittings |
| U-shape | Three runs on three walls | Larger kitchens, lots of storage | Two corners, more cost, can feel enclosed |
| Peninsula | L or U with one run open to the room | Open-plan condos; breakfast counter | Needs clear space round the open end |
| Island | Freestanding unit in the middle | Large kitchens and open plans | Needs clearance on all sides |
Our small condo design guide notes that an L-shaped or galley layout typically uses less floor space than a U-shape, which is why those two dominate Klang Valley condos.
A one-wall kitchen puts sink, hob and fridge in a single line. It is the default in many condos and in the narrow wet kitchens behind terrace houses. It is the cheapest layout because it is the shortest run, and it works well if the fridge sits at one end, the hob at the other and the sink in the middle with worktop on both sides of it.
A galley or parallel kitchen adds a second run opposite the first. It gives far more worktop in the same floor area, and the cook can turn between the two runs. The price is the walkway: keep drawers and dishwasher doors from clashing, and use slim handles on the walkway side so sleeves do not catch, a point our cabinet handles guide makes about narrow kitchens.
The L-shape is the most popular layout for Malaysian homes because it fits a corner, keeps the room open on two sides and gives a natural triangle between the three work points. Put the sink on one leg and the hob on the other, with a clear stretch of worktop between them for preparation.
The weak point is the corner. A blind corner cabinet swallows pots you will never see again unless it has a carousel, a pull-out or at least a wide opening. Plan the corner fitting with the layout, not afterwards, and keep the hob and the sink out of the corner itself so two people can stand at the L at once.
A U-shaped kitchen runs cabinets along three walls. It offers the most storage and worktop and keeps through-traffic out of the cooking area. It also has two corners to fit out, the longest run to pay for, and in a small room it can feel boxed in. It suits larger landed kitchens, and the enclosed wet kitchen of a semi-D or bungalow where heavy cooking happens.
An island is a freestanding unit in the middle of the kitchen; a peninsula is a run that projects into the room from one end, open on three sides. Both add worktop, storage and somewhere to sit, and both need space. Our kitchen island cost guide advises at least 90–120 cm of clear walking space on all sides of an island, and suggests a peninsula, a pull-out breakfast bar or a movable trolley where the kitchen is too small for a full island.
Putting the sink or the hob on an island means running water, waste and power across the floor, which adds cost and cannot be moved later. A dry island used for preparation and eating is the simpler choice.
Many Malaysian homes have two kitchens: a dry kitchen that faces the living area and a wet kitchen behind it for heavy wok cooking. Our wet and dry kitchen guide explains the split. The layout choice follows it: the wet kitchen is usually a one-wall, galley or L-shape built for hard use and easy washing, while the dry kitchen takes the peninsula, island or open L that is on show.
Where there is only room for one kitchen, an L-shape with the hob run enclosed by a glass door or placed furthest from the living area keeps most of the smell and grease where it belongs.
Cabinets and worktops in Malaysia are priced per foot run, so the layout decides the size of the bill. Our countertop guide gives typical lengths: a single-wall kitchen has 10–14 ft of run, an L-shaped layout 14–22 ft, and an island adds a further 8–14 ft. Multiply the run by the rate for the cabinet build you choose:
| Cabinet build | Price per ft run (2026, Klang Valley) | Notes |
|---|---|---|
| Melamine board carcass | RM180 – RM300 | Budget dry kitchen |
| Laminate / HPL door (MDF or plywood carcass) | RM280 – RM420 | Mid-range, most common |
| Moisture-resistant plywood carcass, laminate door | RM350 – RM600 | Wet-kitchen best value |
| Full aluminium (3G / 4G frame) | RM400 – RM700 | Waterproof, termite-proof |
| Fixed base-cabinet island | RM5,000 – RM15,000 | No plumbing or electrical |
| Full custom island | RM18,000 – RM40,000+ | Stone top, seating, sink or hob |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteCorners, tall units, appliance housings and the worktop are added on top of the base rate, which is why an L or U costs more than its length alone suggests. Rates are from our stainless steel vs aluminium cabinet guide and island guide.
A new kitchen layout involves the cabinets, the worktop, the plumbing, the gas, the hood ducting and the electrical points, all in the right order. ClickBina handles whole-house refurbishment and coordinates the trades, so the layout, services and cabinets are planned together. WhatsApp us your job details for a quote: the kitchen size, the layout you have now and the one you want. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free. See our custom cabinets page for related work.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are typical Klang Valley market ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.