Browse 12 dry-kitchen designs for semi-Ds and bungalows, where there is room for a show kitchen, a separate wet kitchen, a pantry and windows on the side of the house.
📍 We serve KL, Selangor & Putrajaya.

A semi-D or bungalow usually has room for two kitchens: a dry show kitchen that opens to the family hall, and a wet kitchen with a yard behind it for heavy cooking. That space changes the design brief. The show kitchen can have a long garden window, a pantry between the two kitchens, a tall appliance wall, a breakfast nook or doors to a side patio, and two people can cook at once. These 12 concept designs show modern, contemporary, classic, Scandinavian, Japandi, tropical and dark-timber ideas for the dry kitchen. The wet kitchen and its costs are covered in the wet and dry kitchen guides linked below.
Each design below is an illustrative concept render of a semi-D or bungalow dry kitchen, grouped by style and by home. Tap any image to enlarge it, and open the details for what each idea suits, the finish and what to watch for. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern · Semi-D · Bungalow
A white kitchen with a long counter and two stools facing the family hall sofa, a canopy hood and tall oven units.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Contemporary · Bungalow
A walnut full-height cabinet wall with flush tall panels and an oven stack, a white peninsula and glass doors to the garden.
💬 WhatsApp us about this design
wet and dry kitchens →Illustrative concept design · Classic · Semi-D · Bungalow
A walk-through pantry lined on both sides with white open shelves, unlabelled jars and baskets, the next kitchen through the far door.
💬 WhatsApp us about this design
pantry cabinet designs →Illustrative concept design · Scandinavian · Semi-D
A long white counter with a triple sink facing garden windows and glass doors, with a sage tall run and hob alongside.
💬 WhatsApp us about this design
kitchen sink sizes →Illustrative concept design · Classic · Bungalow
A curved cushioned bench in a white bay window around a round timber pedestal table, cream shaker cabinets either side.
💬 WhatsApp us about this design
kitchen design ideas →Illustrative concept design · Modern · Semi-D · Bungalow
A warm grey floor-to-ceiling panel wall hiding an integrated fridge behind a long handle, with a built-in oven and a small open niche.
💬 WhatsApp us about this design
pantry cabinet designs →Illustrative concept design · Tropical · Semi-D · Bungalow
A white kitchen with a granite-topped island under a black hood and black-framed folding glass doors pushed open to a planted patio.
💬 WhatsApp us about this design
sliding and folding doors →Illustrative concept design · Modern · Bungalow
A stainless counter run with a sink and a hob under a stainless canopy hood, open shelves with a mug and bowls, and an open door to the yard.
💬 WhatsApp us about this design
wet and dry kitchens →Illustrative concept design · Contemporary · Semi-D · Bungalow
Two facing kitchen runs in oak and white, each with its own sink, a wide walkway between them and glass doors to the garden at the end.
💬 WhatsApp us about this design
kitchen sink sizes →Illustrative concept design · Japandi · Bungalow
A light oak L-run under one long black-framed window full of garden greenery, with no wall cabinets on the window wall.
💬 WhatsApp us about this design
kitchen countertop designs →Illustrative concept design · Dark & timber · Semi-D · Bungalow
Charcoal base cabinets with brass pulls and walnut wall units, with plinth and under-cabinet lighting and a cove-lit ceiling.
💬 WhatsApp us about this design
kitchen cabinet colours →Illustrative concept design · Modern · Semi-D · Bungalow
A white tall cabinet wall with a lit oak-lined niche holding a coffee machine and white cups.
💬 WhatsApp us about this design
bar counter designs →These are illustrative concept designs created to show kitchen options for semi-detached houses and bungalows. They are not completed ClickBina projects. We renovate kitchens in landed homes across KL and Selangor, and your kitchen is assessed and quoted to its own layout, plumbing and gas points.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the split. Decide what happens in the dry show kitchen and what happens in the wet kitchen, then plan each to its job. In most Malaysian semi-Ds and bungalows the dry kitchen faces the family hall and the garden, and the wet kitchen sits behind it next to the yard, the gas and the drains.
Then choose the style. A big kitchen can take a darker scheme or two tones; a narrower one stays light.
| Move | What it gives | What to check |
|---|---|---|
| Show kitchen open to the hall | One space for family and cooking | Hood strength; smells kept to the wet side |
| Walk-through pantry | Storage between the kitchens | Ventilation; a door |
| Tall appliance wall | Hidden fridge, larder and oven | Ventilation gaps and power points |
| Kitchen opened to a patio | Indoor-outdoor cooking and eating | Structure and approval for a new opening |
| Two sinks, two zones | Two cooks at once | Water and waste for each sink |
| Long garden window | Light and a view | Storage elsewhere; west sun |
| Your house | Usually works | Watch for |
|---|---|---|
| Semi-D, kitchen on the free side | Long sink counter under a side window, tall wall opposite | Drain route for the sink |
| Semi-D, kitchen in the middle | Show kitchen open to the hall, pantry to the wet kitchen | Light and ventilation |
| Bungalow facing a garden | Window wall with no wall cabinets, breakfast nook | Storage and west sun |
| Bungalow with a side patio | Folding doors to the patio | Approval for the opening |
| Busy cooking family | Two-cook layout and a stainless prep run by the yard | Gas and ventilation |
This gallery covers the dry show kitchen. For the wet kitchen, see wet kitchen vs dry kitchen and the dry and wet kitchen cost guide. For storage, see the pantry cabinet gallery, and for more styles the kitchen design gallery.
The semi-D and bungalow interior design guide covers how the kitchens fit with the living hall, the staircase and the bedrooms in a larger landed house.
ClickBina's kitchen design guide puts a large semi-D or bungalow kitchen with an island at RM35,000 – RM70,000+, and prices cabinet doors per running ft: laminate or HPL at RM280 – RM420, acrylic or PU spray at RM380 – RM600, and glass or wood veneer at RM500 – RM750. The dry and wet kitchen cost guide puts a purpose-built rear extension for a semi-D, bungalow or link house at RM45,000 – RM80,000+ (indicative Klang Valley ranges for 2026).
Ask for the dry kitchen, wet kitchen, pantry and any structural work to be quoted separately, so you can phase them.
We renovate kitchens in semi-Ds and bungalows across KL and Selangor: dry show kitchens, wet kitchens, pantries, cabinets and worktops. WhatsApp us your job details for a quote: semi-D or bungalow, how you cook, whether there is a wet kitchen already, and the look from this page you like. We'll reply as soon as we can with next steps, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a semi-D or bungalow kitchen option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.