Browse 14 sliding door designs by style and home, then check the frame, the glass, the practical limits and the cost of each.
📍 We serve KL, Selangor & Putrajaya.

A sliding door design comes down to three choices: how it opens (a two-panel slider, stacking panels, a bi-fold, a barn door on a rail or a pocket door into the wall), the frame and glass (aluminium, uPVC or timber, with clear, frosted, fluted or double glazing) and where it goes: an outside door has to drain water at the track, while an inside door is about space, light and privacy. Use the filters below to narrow the 14 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that explains the hardware, the glass or the cost behind that kind of door.
14 designs shown
Illustrative concept design · Modern · Condo
A silver aluminium glass slider opens a condo living room onto a small balcony with potted plants, trees and other blocks beyond.
💬 WhatsApp us about this design
sliding door rollers and tracks →Illustrative concept design · Industrial · Condo
A row of full-height slim black-framed glass sliders separates a living area from an open white kitchen and dining space.
💬 WhatsApp us about this design
wet and dry kitchen layouts →Illustrative concept design · Modern · Semi-D
Dark-framed glass panels on parallel tracks park at both sides, opening a living room wide to the garden lawn.
💬 WhatsApp us about this design
bi-fold and stacking doors →Illustrative concept design · Tropical · Terrace
Charcoal bi-fold glass doors fold back to both sides of a rear extension, opening the dining area onto a paved yard with plants.
💬 WhatsApp us about this design
bi-fold door costs and hardware →Illustrative concept design · Rustic & barn · Terrace
A rustic Z-braced timber barn door hangs from a black steel rail and slides along the wall beside an opening to a balcony.
💬 WhatsApp us about this design
hidden and sliding cabinet doors →Illustrative concept design · Minimalist · Condo
A white shaker-panel door slides across a cased opening with a boxed head, opening onto a bathroom with a window beyond.
💬 WhatsApp us about this design
hidden door costs →Illustrative concept design · Classic · Condo
Brass-framed sliding panels of reeded fluted glass run across a condo room, glowing warm while blurring the view, with one clear panel to the balcony.
💬 WhatsApp us about this design
glass doors and windows compared →Illustrative concept design · Minimalist · Terrace
A white-framed sliding door with a frosted glass panel closes off a utility area off the kitchen.
💬 WhatsApp us about this design
frosted film or frosted glass →Illustrative concept design · Japandi · Condo
A pair of light timber grid sliders with frosted panels parts to show a calm guest room with a low bed.
💬 WhatsApp us about this design
Japandi interiors →Illustrative concept design · Minimalist · Terrace
A large plain greige panel slides on a slim ceiling-level track to close a wide opening, reading almost as part of the wall.
💬 WhatsApp us about this design
hidden doors and panels →Illustrative concept design · Modern · Condo
Tall sliding glass panels run along the balcony edge up to the slab above, turning the balcony into an enclosed glass room.
💬 WhatsApp us about this design
balcony design ideas →Illustrative concept design · Modern · Condo
A white-framed glass sliding divider runs across a white condo kitchen, closing off the cooking zone when needed.
💬 WhatsApp us about this design
wet and dry kitchens →Illustrative concept design · Modern · Condo
A thick white-framed four-panel balcony door with double-glazed panels opens onto a balcony with apartment blocks beyond.
💬 WhatsApp us about this design
soundproof windows and doors →Illustrative concept design · Classic · Semi-D
White-framed glass sliders with thin grid bars open a family room onto a covered terracotta-tiled terrace.
💬 WhatsApp us about this design
door and window types →These are illustrative concept designs created to show style options. They are not completed ClickBina projects; your door is measured and quoted on its own opening, wall and building rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the opening and what is on each side of it. A balcony or garden door fights rain; a kitchen or bedroom door fights smell, noise and lack of space. The same look can be a good or a poor choice depending on which job it has to do.
Inside the house, think about the wall the door slides onto: a barn door needs clear wall beside the opening, and a pocket door needs a wall cavity with nothing in it. Outside, think about the track first, because that is where water gets in.
| Type | How it opens | Suits | Watch for |
|---|---|---|---|
| Two-panel slider | One panel slides past a fixed or second panel | Condo balconies, kitchens | Track drainage, rollers |
| Stacking slider | Several panels park behind one another | Wide living-room openings | Threshold drainage, more tracks to clean |
| Bi-fold | Panels fold back in a concertina | Patios, rear extensions | Hinges and rollers wear; heavy panels |
| Barn door | Leaf hangs from a rail on the wall face | Studies, walk-ins, bedrooms | No sound seal; needs wall space |
| Pocket door | Leaf slides into the wall | Corridors, bathrooms | Needs a clear wall cavity |
| Hidden flush slider | Panel on a concealed top track | Store rooms, studies | Hardware precision and fixing above |
| Opening | Usually works | Ask about |
|---|---|---|
| Condo balcony | Aluminium two-panel slider, double glazing for noise | Weep holes, rollers, glass type |
| Landed patio or garden | Stacking slider or bi-fold glass | Threshold drainage, hinge and roller quality |
| Kitchen | Slim black-frame or white-frame glass divider | Safety glass, hood and power on each side |
| Bedroom or study | Barn door, Japandi grid slider | Wall space, sound |
| Ensuite or utility | Fluted or frosted glass slider, pocket door | Privacy, moisture, wall cavity |
ClickBina's doors and windows guide puts an aluminium sliding door at RM800 – RM2,000 per 2-panel set. The bi-fold door guide gives RM4,000 – RM12,000 for a bi-fold or stacking sliding door, RM5,500 – RM12,000+ for a bi-fold opening 3.0 m+ wide and 2.4 m+ high, and RM5,000 – RM10,000 for a typical 60 sq ft condo balcony enclosure in sliding glass (indicative Klang Valley ranges for 2026).
Inside the house, the wet and dry kitchen guide prices a sliding glass divider alone at about RM2,500 in a worked KL condo example, and the soundproof windows guide puts a double-glazed unit on a sliding-door panel at RM800 – RM2,000 per panel. Barn, pocket, fluted and hidden sliders are quoted per job, because the hardware and the wall work vary so much.
We supply and install sliding doors. WhatsApp us your job details for a quote: where the door goes, the rough width and height of the opening, the design you like from this page, and whether it is a condo or landed home. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026. No safety-glass height figure is given, because the source guide states two different thresholds.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.