Browse 12 kitchen designs for older flats and apartments: narrow galleys ending at the yard door, gas cylinders, grilled windows and old concrete worktops.
📍 We serve KL, Selangor & Putrajaya.

The kitchen of an older Malaysian flat or low-cost apartment is usually a narrow galley or a compact L that ends at the yard door, with a gas cylinder under the hob, a grilled window, an old concrete or tiled worktop on brick legs and little room for a hood duct. The yard behind it is often the laundry too. Designs that suit it keep one clear walkway, use tough finishes that cope with damp and heavy cooking, give the gas cylinder a vented cabinet, bring light in from the yard and keep the worktop clear. These 12 concept designs show modern, minimalist, Scandinavian, practical and budget-refresh ideas.
Each design below is an illustrative concept render of a kitchen in an older flat or apartment, grouped by style. Tap any image to enlarge it, and open the details for what each idea suits, the finish and what to watch for. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Scandinavian
A narrow galley with white cabinets and a hob on one side and oak open shelves with white crockery on the other, a glass door at the end.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Budget refresh
A concrete L-shaped worktop on exposed brick legs with new white cabinet doors fitted between them, a sink and a grilled window.
💬 WhatsApp us about this design
concrete kitchen worktops →Illustrative concept design · Practical & tough
Woodgrain-finish aluminium cabinets with a stainless worktop and a gas hob, a grilled window and a glass door to the yard.
💬 WhatsApp us about this design
stainless vs aluminium cabinets →Illustrative concept design · Practical & tough
An open white cabinet under the hob holding a plain gas cylinder, its door cut with vent slots.
💬 WhatsApp us about this design
gas smell and leak detectors →Illustrative concept design · Modern
A black angled hood above an induction hob on white tiles, beside a window looking out to other blocks.
💬 WhatsApp us about this design
kitchen hood and hob →Illustrative concept design · Minimalist
A frosted glass sliding door in a slim white frame, half open onto a white kitchen with a glass door to the yard beyond.
💬 WhatsApp us about this design
sliding door designs →Illustrative concept design · Practical & tough
A narrow yard with a white front-loading washer, a small sink run, a ceiling drying rack and a grilled window.
💬 WhatsApp us about this design
laundry and yard cabinets →Illustrative concept design · Modern
Black wall rails holding plain utensils on white tiles under the wall cabinets, with a kettle and a board of plain jars on the worktop.
💬 WhatsApp us about this design
kitchen organisers →Illustrative concept design · Scandinavian
A pale sage L-kitchen with a double sink under a louvred window and a hob on the short side under a slim hood.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Minimalist
A white handleless kitchen wall seen straight on, with a pale grey glossy splashback and a warm LED strip glowing under the wall cabinets.
💬 WhatsApp us about this design
kitchen floor tiles →Illustrative concept design · Practical & tough
Stainless steel worktops with a sink and a gas hob, dark open shelves and grey tiles, the door to the yard at the end.
💬 WhatsApp us about this design
stainless steel worktops →Illustrative concept design · Modern
White wall cabinets over wood-look base units with a grey backsplash, a gas hob, a fridge and a glass door at the end.
💬 WhatsApp us about this design
kitchen cabinet door replacement →These are illustrative concept designs created to show kitchen options for flats, PPR and low-cost apartments. They are not completed ClickBina projects. We renovate flat kitchens in KL and Selangor, and your kitchen is assessed and quoted to its own size, gas and water points and the management's rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with what the flat fixes: the gas cylinder or gas point, the sink's waste pipe, the grilled window and the yard door. ClickBina's walk-up flat guide recommends a single straight run or an L-shape for compact flat kitchens, tall cabinets to the ceiling, a proper hood vented outside where possible, and sockets where the appliances will actually sit.
Then choose the look. In a small kitchen one cabinet colour, or two tones at most, keeps it calm.
| Move | What it solves | What to check |
|---|---|---|
| Re-tile the old concrete top | A new look without demolition | Cracks and damp in the legs |
| Aluminium or stainless cabinets | No swelling in a damp kitchen | Hinges and runners that do not rust |
| Vented gas cylinder cabinet | Safe storage under the hob | Ventilation and quick shut-off |
| Slim hood | Less smoke and grease | Duct route or recirculating filter |
| Sliding glass kitchen door | No swing door in the way | A clear wall to slide along |
| Yard laundry | Washer out of the kitchen | Water and drain points |
| Your kitchen | Usually works | Watch for |
|---|---|---|
| Narrow galley | One run of cabinets, open shelves opposite | Walkway width |
| Old concrete top | Re-tile it and add new doors | Hidden damp |
| Damp, yard-side | Aluminium or stainless cabinets | Hardware quality |
| Dark inner kitchen | Light tiles, LED, a glass door to the yard | Gloss splashes |
| Heavy daily cooking | Stainless worktop and a slim hood | Duct route |
This gallery covers the kitchen in older flats and apartments. For cabinet sizes in very small kitchens, see small kitchen cabinet design; for hoods, the kitchen hood and hob guide; and for the yard, laundry and yard cabinet costs.
The walk-up and low-cost flat renovation guide explains what to fix first in an older flat, including wiring and pipes, before the kitchen is rebuilt.
ClickBina's walk-up and low-cost flat guide puts a compact flat kitchen of cabinets, worktop, sink, tiling and ventilation at RM10,000 – RM22,000. The stainless vs aluminium cabinet guide puts aluminium cabinets at RM400 – RM700 per foot run and stainless steel at RM650 – RM1,000 per foot run (indicative Klang Valley ranges for 2026).
Re-tiling an old concrete top, a gas cabinet, rails and a sliding door are quoted per job. Ask for the cabinets, worktop, plumbing and electrical points to be listed separately.
We renovate kitchens in walk-up, PPR and low-cost flats in KL and Selangor: cabinets, worktops, tiling, hoods and the yard behind the kitchen, planned for the stairs and the management's rules. WhatsApp us your job details for a quote: the block, the floor level, the kitchen layout, how you cook and the look from this page you like. We'll reply as soon as we can with next steps, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a kitchen option for an older flat or apartment. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.