Browse 14 arch designs by style and home type, from a simple arched doorway to arched doors, niches, mirrors and rounded walls, then see how each is built.
📍 We serve KL, Selangor & Putrajaya.

Arch design in a home usually means one of five things: an arched doorway with no door, an arched door made to fit a round-top frame, an arched niche for display or storage, an arched mirror or headboard that gives the curve without touching the wall, or a curved wall end. The first three change the wall itself, so the wall type decides what is possible; the last two are add-ons that suit any home, including rented condos. Use the filters below to narrow the 14 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the opening, the door, the niche or the cost behind that look.
14 designs shown
Illustrative concept design · Modern · Terrace
Two round-topped doorways side by side in a white wall, each lined with exposed brick reveals, lead through to a dining corner and a balcony door.
💬 WhatsApp us about this design
making a new opening in a brick wall →Illustrative concept design · Minimalist · Condo
A tall round-topped opening in a white wall leads into a compact white flat-panel kitchen with under-cabinet lighting, next to the dining table.
💬 WhatsApp us about this design
what can and cannot be hacked →Illustrative concept design · Classic · Semi-D
A walnut-tone timber door with a round arched top and raised panels, with a brass lever, sits in a cream wall with moulding frames.
💬 WhatsApp us about this design
door types and materials →Illustrative concept design · Modern · Terrace · Condo
A pair of slim black-framed glass doors with a gridded, gently arched top looks through to a dining table and a grey kitchen.
💬 WhatsApp us about this design
how interior doors are replaced →Illustrative concept design · Korean soft & cream · Condo
A full-wall cream wardrobe with round-cornered raised door panels has an open arch-topped hanging bay in the middle, with a rail and two drawers below.
💬 WhatsApp us about this design
built-in storage for small homes →Illustrative concept design · Korean soft & cream · Condo · Terrace
Two tall recessed arched niches with shelves of plain cream ceramics flank a decorative scalloped arch panel, behind a cream loveseat.
💬 WhatsApp us about this design
the Korean cream look →Illustrative concept design · Minimalist · Condo
A frameless arched-top mirror hangs above a floating light oak vanity with a white rectangular basin and a brushed brass tap.
💬 WhatsApp us about this design
bathroom mirror cabinets and lighting →Illustrative concept design · Mediterranean & rustic · Terrace
An arched recessed niche lined with small sage-green square tiles sits in a smooth off-white shower wall, below an aged-brass shower head.
💬 WhatsApp us about this design
shower niche sizes and waterproofing →Illustrative concept design · Modern · Semi-D · Bungalow
A tall white wall ends in a smooth, sweeping S-shaped curve beside a timber staircase, in a living area with a grey sofa.
💬 WhatsApp us about this design
curved panels around pillars and corners →Illustrative concept design · Minimalist · Condo · Terrace
A round-arched opening filled with fixed glass panels looks from the corridor into a small study with an oak desk and a black desk lamp.
💬 WhatsApp us about this design
lintels above doors and windows →Illustrative concept design · Korean soft & cream · Condo · Terrace
A tall arch-shaped dusty-pink upholstered headboard framed in light timber stands against a cream wall with moulding panels, behind white bedding.
💬 WhatsApp us about this design
custom bed frame and headboard costs →Illustrative concept design · Classic · Bungalow · Semi-D
A deep arched alcove in a cream foyer wall holds a built-in walnut bench with three drawers and a linen cushion, beside a dark timber door.
💬 WhatsApp us about this design
foyer and shoe storage ideas →Illustrative concept design · Mediterranean & rustic · Bungalow · Semi-D
A thick rounded arch in hand-plastered terracotta lime walls frames a warm room with two smaller arched doorways and a rustic dark timber table.
💬 WhatsApp us about this design
limewash and decorative wall finishes →Illustrative concept design · Modern · Condo · Semi-D
A full-length arched mirror in a slim oak frame leans against a bedroom wall beside a light oak full-height wardrobe.
💬 WhatsApp us about this design
how wall mirrors are fixed →These are illustrative concept designs created to show style options. They are not completed ClickBina projects; your arch is measured and quoted on your own wall, opening size and finish.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Arches have become the most requested curve in Klang Valley renovations because they soften a room without adding clutter. They work best as one repeated idea rather than curves everywhere: an arched doorway between the living and dining areas, a matching niche nearby, perhaps an arched mirror upstairs.
In a condo, keep to arches that do not cut structure: mirrors, headboards, niches in a false wall and arched joinery. In a landed home, a new arched opening in a brick partition is often possible once the wall has been checked.
| Arch shape | Look | Where it suits | Watch for |
|---|---|---|---|
| Round top (semicircle) | The classic arch; height grows with width | Doorways, niches, mirrors | A wide opening needs a tall wall above it |
| Elliptical or shallow | Wide and low, calmer | Kitchen openings, wide passages | A flat curve shows any unevenness |
| Tall slim arch | Elegant, vertical | Display niches, full-length mirrors | Narrow niches hold little; plan shelf depth |
| Rounded corner | Soft wall end, no sharp edge | Corridors, stair halls, living rooms | Skirting and flooring have to follow the curve |
| Arched joinery | The curve in doors, panels and headboards | Bedrooms, wardrobes, rented homes | Curved timber and panels cost more than flat ones |
A new arched doorway starts the same way as any new door opening. ClickBina's new door opening guide sets out the order: confirm the wall is a non-structural brick partition, hack the opening, put a lintel across the top and make good the edges. The arch is then formed inside that opening with a template, a frame and plaster or bent board, so the curve sits under the lintel rather than replacing it.
Load-bearing walls are a different job. The wall hacking guide is clear that an opening in a structural wall needs drawings from a professional engineer and a beam designed for the load, and the lintel guide explains why no opening should be left without something carrying the wall above it. Many condo walls around kitchens and bathrooms are reinforced concrete, which is why condo arches are usually niches, joinery and mirrors.
Niches are normally built into a false wall rather than cut deep into the existing one, because the existing wall may hide pipes or cables. Arched doors are made to measure: the opening, the frame and the leaf all follow one template, so the door is ordered only after the arch is formed and checked.
| Room | Arch idea that usually works | What to ask for |
|---|---|---|
| Living and dining | Full-height arched doorway, display niches | Wall type check and one radius used throughout |
| Kitchen | Wide shallow arch or arched glass doors | Plans checked for structural walls; a clear swing zone for doors |
| Bedroom | Arched headboard, wardrobe niche, full-length mirror | Removable or wipeable headboard cover; mirror fixings |
| Bathroom | Arched mirror, arched shower niche | Niche waterproofed and sloped; mirror on sound tiles |
| Foyer | Arched alcove with a bench | Bench clear of the door swing; a light in the alcove |
There is no single price for an arch, because the wall work, the curve and the finish are separate lines. ClickBina's new door opening guide prices the opening in a brick partition (indicative Klang Valley ranges for 2026): hacking RM10 – RM25 per sq ft, an RC lintel RM300 – RM800 per opening and make-good after hacking RM800 – RM2,500 per opening. Forming the arch itself is quoted on top of that, from your drawing.
Add-on arches are priced like the joinery or tiling they belong to. The shower niche guide lists mosaic tiling, niche and border work at RM20 – RM45 per sq ft; the custom bed frame guide puts laminate headboard joinery at RM280 – RM420 per ft run; and a built-in wardrobe runs about RM180 – RM600 per foot run depending on material. Hanging a single mirror is RM40 – RM80 per piece, with the arched mirror itself extra. Arched doors are made to measure and are quoted per door.
We design and build interiors across KL and Selangor, including arched doorways, niches and the joinery around them, and we coordinate the hacking, plaster and finishing trades on the same job. WhatsApp us your job details for a quote: the rooms, rough sizes, whether it is a condo or a landed home, and the arch design you like from this page. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.