Old House Kitchen Design Malaysia: 12 Makeover Ideas
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Old House Kitchen Design
12 Makeover Ideas for a 1970s to 1990s Kitchen

Browse 12 kitchen makeover looks for an older landed house, from a kept concrete worktop to a fully refitted kitchen, then see what each involves.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: U-shaped kitchen with sage green cabinets, a terrazzo worktop and floor, a wide window over the sink and a stainless hood

An old house kitchen usually has a concrete worktop on brick supports, tiled fronts, a gas cylinder corner, no hood duct and a back door to the yard, and often old pipes and wiring behind the tiles. A good makeover fixes the hidden services first, then decides what to keep: a sound concrete top or terrazzo floor can stay, while termite-hit timber cabinets are best replaced with aluminium or new carcasses. Opening the half-wall to the dining area, enlarging the window over the sink and ducting the hood out make the biggest difference. These 12 concept designs show keep-and-refresh, modern and retro kitchens. Use the filters below to narrow them by style or home type.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

How to plan an old house kitchen makeover

An old kitchen is two jobs: the services behind the walls and the kitchen you see. ClickBina's old house renovation guide sets the order for the whole house: make it safe and dry, treat termites, replace wiring and pipes while the walls are open, waterproof, re-tile, then carpentry and paint. In a kitchen that means the pipes, gas, wiring and hood route are decided before the cabinets are ordered.

  • Keep what is sound: a concrete worktop, a terrazzo floor, retro tiles you like.
  • Replace what has failed: termite-hit or swollen timber cabinets, cracked counters, a solid back door.
  • Open up where you can: a non-structural half-wall to the dining area, a wider window over the sink.
  • Duct the hood out through an existing opening if there is one.
  • Plan the yard: a covered back yard makes a wet kitchen, but needs approval.

The kitchen in a landed house usually has a yard and a back lane behind it, which gives options a flat or condo kitchen does not have: a wet kitchen outside, a glass back door, and a hood that vents straight out.

What to keep and what to replace in an old kitchen

PartKeep whenReplace when
Concrete worktop on brickSolid, level and not crackedCracked, too low, or pipes behind need replacing
Timber cabinetsRarelyTermite damage, swelling or rot
Old wall tilesSound, and you like the colourHollow, cracked or hiding a leak
Terrazzo floorSound, only dull or stainedBadly cracked or lifting
Galvanised water pipesRarely in a refitOld enough to rust; replace while walls are open

Quick pick by house type

HomeUsually worksWatch for
Old intermediate terraceOpen half-wall, glass back door, covered yard as wet kitchenBack-yard roof approval
Old corner terraceEnlarged side window, longer cabinet runLintel over the wider window
Old semi-DFull refit with aluminium cabinets, ducted hoodGas route and old wiring
Old bungalowTerrazzo kept, retro tiles kept, open shelvesLarger floor area to polish

Fix pipes, wiring and gas first

  • Water pipes: the old house guide advises replacing galvanised iron pipes when the walls are open; it puts concealed PPR re-piping at RM6,500 – RM11,000 for a terrace house. See re-piping costs.
  • Wiring: kitchens need dedicated circuits for the hob, oven and fridge; old kitchen wiring is often the first to fail. See house rewiring.
  • Gas: plan where the cylinder or piped gas goes before the pantry and hob positions are fixed.
  • Termites: treat before new cabinets go in.

What an old house kitchen makeover costs

ClickBina's guides quote (indicative Klang Valley ranges for 2026): laminate cabinet doors at RM280 – RM420 per ft run, aluminium cabinets at RM400 – RM700 per foot run, a concrete worktop at RM80 – RM180 per foot run, a floor-to-ceiling laminate pantry at roughly RM448 – RM924 per foot, fitting a replacement chimney hood at RM350 – RM600 plus RM200 – RM600 for new ductwork, removing a non-structural kitchen wall at RM3,000 – RM8,000 including make-good, an aluminium sliding window at RM200 – RM500 per panel, terrazzo polishing at RM8 – RM15 per sq ft, and a polycarbonate back-yard awning at RM2,000 – RM4,000.

Ask for the services, the hacking, the cabinets and the finishes to be listed separately, so you can see what the hidden work costs.

How ClickBina can help

We renovate kitchens in older houses, including hacking, re-piping, cabinets, worktops, tiling and hoods, in the right order. WhatsApp us your job details for a quote: the house type and age, what is in the kitchen now, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges. For the rest of the house, see the old house makeover gallery.

Sources & methodology

  • ClickBina old house renovation guide — order of work and the re-piping figure.
  • ClickBina cabinet door styles, small kitchen cabinet, stainless vs aluminium, concrete countertop, hood and hob, hacking walls, nako window, terrazzo restoration and back-yard roof guides — every other RM figure.

About the images: every image on this page is an illustrative concept design generated to show a kitchen option for an older house. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Should I keep the old concrete kitchen worktop?
If it is solid, level and not cracked, yes: re-tile the front and fit new doors below. Check the brick supports and the old pipes behind it first.
Can I remove the wall between my kitchen and dining area?
Often, in terrace houses the kitchen-dining wall is a non-structural partition. ClickBina's hacking guide puts removing it at RM3,000 – RM8,000 including make-good, but confirm it is not structural first.
What cabinets are best for an old house kitchen?
Aluminium cabinets resist damp and termites and suit the wet side; laminate doors on good carcasses suit the dry side.
My old kitchen has no hood. Can one be added?
Yes. A chimney hood can usually be ducted out through an existing vent or a new opening in the outside wall; plan a short, straight duct.
Should I change the pipes when I redo the kitchen?
If they are old galvanised iron, yes, while the walls are open. ClickBina's old house guide puts concealed PPR re-piping at RM6,500 – RM11,000 for a terrace house.
Can I roof over the back yard for a wet kitchen?
Usually only with the council's written approval, because the open space behind a terrace is controlled. Check before building.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show kitchen options. Your kitchen is assessed and quoted after a check.

Get a Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides