Browse 13 front looks made for an intermediate terrace, where your facade sits flush between two neighbours, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A terrace house facade is a narrow front squeezed between two party walls, with the porch roof, the upstairs window and the gate all stacked on one face. The looks that work best on it change what sits on the front (paint, a cladding band, a slat screen, a grille, an awning, lighting) and leave the shared walls, the shared porch column and the roof line alone, because those are shared with your neighbours or fixed by the approved plan. These 13 concept designs show double-storey and single-storey terrace fronts in modern, contemporary, tropical, industrial and repaint styles. Use the filters below to narrow them by style or storey.
Each design below is an illustrative concept render of one terrace house front, with the neighbours' walls left as they are. They are grouped by style and by storey. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
13 designs shown
Illustrative concept design · Modern · Terrace
A row of grey double-storey link houses; the nearest has an upstairs bay with a glass balustrade and a panel of dark vertical slats beside it, under a flat dark roof edge.
💬 WhatsApp us about this design
aluminium louvre and slat screens →Illustrative concept design · Contemporary · Terrace
A row of attached cream double-storey houses along a lane, each upstairs balcony front over the porch clad in horizontal timber boards on slim white posts.
💬 WhatsApp us about this design
exterior cladding options →Illustrative concept design · Contemporary · Terrace
A terrace car porch whose column bases are clad in grey split stone, cream walls and glass doors on one side, and a long row of attached houses beyond.
💬 WhatsApp us about this design
stone wall cladding →Illustrative concept design · Modern · Terrace
A black laser-cut gate with a branching pattern in front of a white terrace porch with black-framed windows and door; the window behind has no grille yet.
💬 WhatsApp us about this design
window grille designs →Illustrative concept design · Modern · Terrace
A grey double-storey terrace house between its neighbours, with a slim dark awning above the upstairs windows, a glass balcony railing and black-framed doors below.
💬 WhatsApp us about this design
awning designs →Illustrative concept design · Contemporary · Terrace
A beige terrace front at dusk with tall vertical lines of warm LED light at its edges, warm downlights in the porch ceiling and dark neighbouring houses.
💬 WhatsApp us about this design
outdoor lighting →Illustrative concept design · Repaint & refresh · Terrace
A row of single-storey terrace houses; the nearest unit has a grey textured gable over a small entrance porch, white walls, dark grey wall strips and a low white gate.
💬 WhatsApp us about this design
house roof designs →Illustrative concept design · Tropical · Terrace
A long grey stone-look planter of ferns and spiky plants under a black-framed window beside the porch, white walls and wall lamps.
💬 WhatsApp us about this design
landscape designs →Illustrative concept design · Industrial · Terrace
The end of a double-storey terrace row: the nearest unit has red brick ground-floor walls, gate piers and column strips, with a grey upper floor and black gates.
💬 WhatsApp us about this design
exterior wall tiles →Illustrative concept design · Tropical · Terrace
A terrace car porch with a warm timber strip ceiling and round downlights, cream walls, glass doors at the back and open black gates.
💬 WhatsApp us about this design
car porch ceilings →Illustrative concept design · Tropical · Terrace
A white terrace row; the middle unit has a wire screen at its upstairs window with a creeper hanging from it, planter boxes on the porch roofs and grey slatted gates.
💬 WhatsApp us about this design
vertical gardens →Illustrative concept design · Repaint & refresh · Terrace
The end of a double-storey terrace row with sand-coloured textured panels on the upper floor between white pilasters, a white ground floor and white gates.
💬 WhatsApp us about this design
the exterior repaint process →Illustrative concept design · Contemporary · Terrace
A terrace porch with a full-height sage green panel of vertical tiles beside a timber front door, white walls and a stone-paved porch floor.
💬 WhatsApp us about this design
exterior wall tiles →These are illustrative concept designs created to show terrace facade options. They are not completed ClickBina projects. We repaint, clad and refit terrace fronts as part of our renovation work, and your house is assessed and quoted to its own walls, neighbours and council or management rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start from what is shared and what is yours. On an intermediate terrace the side walls are party walls, the porch column on each edge is often shared with the next house, and the roof runs across the whole row. Your own part is the front face between those edges: the walls, the windows, the porch beam and ceiling, the gate and the front yard.
Talk to the neighbours before work touches anything shared, such as the porch column, the parapet line or the party wall. ClickBina's guide to party walls and shared walls explains why that matters.
| Element | What it changes | Terrace watch-out | Approval to check |
|---|---|---|---|
| Repaint, new colour | The whole mood of the front | Stop the colour at the party-wall line | Usually cosmetic; gated or strata schemes may control colour |
| Cladding band or tile panel | Warmth or texture on one area | Keep it off the shared column half | Management in gated or strata schemes |
| Slat screen or awning | Shade and privacy upstairs | Fix into your own wall, seal the joint | Management; council for larger structures |
| Window grille and gate | Security and the pattern of the front | Gate swing and track within your lot | Usually none for like-for-like |
| Raised parapet or gable | The outline of the house | Roof junction with the neighbours | Council approval for facade or roof line changes |
| Facade lighting | How the front reads at night | No glare into the neighbour's windows | Wiring by a competent electrician |
| Front | Usually works | Watch for |
|---|---|---|
| Double-storey intermediate | Slats or an awning upstairs, a cladding band on the porch beam, a matched gate | Upstairs access needs scaffold |
| Single-storey intermediate | A new colour, a gable or parapet feature, a planter ledge, a porch ceiling | Low roof eaves limit how much a feature can rise |
| Older terrace, original front | Repaint plus new grilles and a gate in one colour | Old paint and cracks need preparation first |
| Newer terrace, developer front | One added feature such as lighting or a tile panel | Developer or management rules on the facade |
This gallery covers the terrace front as a whole. The parts around it have their own galleries, so you can match them: the main gate design gallery for gates, the car porch ceiling guide for the porch underside, and the landscape design gallery for the strip of garden beside the porch. For fronts of any house type, see the wider house exterior design gallery.
Plan them together. A charcoal gate, charcoal grilles and charcoal window frames read as one design on a narrow terrace; three dark colours from three contractors usually do not.
Repainting is the part with published figures. ClickBina's exterior repaint guide puts an exterior repaint at RM2,000 – RM4,000 for a single-storey terrace and RM4,000 – RM8,000 for a double-storey terrace, with scaffold or rope access for upper floors adding RM800 – RM2,500 (indicative Klang Valley ranges for 2026).
For the add-ons, the awning design guide quotes polycarbonate at RM350 – RM700 and aluminium louvre at RM800 – RM1,800 per metre run, and the window grille guide puts a standard mild steel window grille at RM80 – RM130 per sq ft. Cladding, tile panels, parapet work and lighting are quoted per job, because the wall area, fixing and access differ from house to house. Ask for each item to be listed separately so you can phase the work: paint first, then a feature, then lighting.
We repaint, clad and refit terrace fronts as part of our renovation work, and we can install awnings over your upstairs windows. Council and management rules for your house still apply, so check them before the work starts. WhatsApp us your job details for a quote: single or double storey, which parts of the front you want to change, and the look from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a terrace facade option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.