Browse 12 kitchen designs built around what a condo gives you: a closed or open kitchen, a service yard, a fixed gas point and a hood with nowhere to vent.
📍 We serve KL, Selangor & Putrajaya.

In a condo the big kitchen decision is open or closed, and the building often makes it for you. Gas cooking and wok frying favour a closed kitchen; a hood that can only recirculate, or no gas at all, makes an open kitchen workable. The service yard is usually the only outside air, gas and plumbing points stay where the developer put them, and cutting a kitchen wall needs the management's approval. These 12 concept designs show the moves that work inside those limits: glass sliders that open a closed kitchen, induction for an open plan, light from the yard, slim hoods, corner storage and dining built against the kitchen wall. This page covers the main condo kitchen; cabinet sizing lives on the small kitchen cabinet page.
Each design below is an illustrative concept render of a condo kitchen, grouped by style. Tap any image to enlarge it, and open the details for what each idea suits, the finish and what to watch for. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Contemporary · Condo
A white kitchen seen through full-height black-framed glass sliding panels, with a dining table and pendant lights inside.
💬 WhatsApp us about this design
sliding door designs →Illustrative concept design · Minimalist · Condo
An open island with a flush induction hob under a stainless canopy hood, an oak-and-white run behind and the sofa and dining area beyond.
💬 WhatsApp us about this design
kitchen hood and hob →Illustrative concept design · Modern · Condo
A full-height white-framed glass door at the end of the kitchen opening onto the service yard, with a white washer and a drying rack outside.
💬 WhatsApp us about this design
laundry and yard designs →Illustrative concept design · Scandinavian · Condo
A tall white one-wall kitchen with an oak-fronted short island counter in front of it, a round dining table by the balcony glass.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Contemporary · Condo
A one-wall kitchen with grey upper cabinets and walnut and beige base units, and a large oak worktable in front by the balcony glass.
💬 WhatsApp us about this design
wet and dry kitchens →Illustrative concept design · Modern · Condo
Inside the yard: a white washer-dryer beside tall white cabinets, a stainless double sink run and wall cabinets under a louvred window.
💬 WhatsApp us about this design
laundry and yard designs →Illustrative concept design · Minimalist · Condo
White handleless wall cabinets with a slim hood strip built in over a black hob, plain white tiles and a window to other blocks.
💬 WhatsApp us about this design
kitchen hood and hob →Illustrative concept design · Scandinavian · Condo
A sage and white L-kitchen with an oak worktop, the corner base door open to show chrome pull-out baskets, a window to other blocks.
💬 WhatsApp us about this design
corner cabinet solutions →Illustrative concept design · Japandi · Condo
A built-in L bench with cushions, a round oak table and a chair by the window, with the white galley kitchen run alongside.
💬 WhatsApp us about this design
small kitchen cabinet ideas →Illustrative concept design · Industrial · Condo
Black-framed reeded glass barn doors on a top rail half drawn across the kitchen opening, white cabinets behind and a grey sofa in front.
💬 WhatsApp us about this design
barn door designs →Illustrative concept design · Scandinavian · Condo
A windowless L-run with white wall cabinets to the ceiling, pale sage base cabinets, a light worktop and warm under-cabinet light.
💬 WhatsApp us about this design
kitchen cabinet colours →Illustrative concept design · Modern · Condo
A tall white cabinet wall with a white double-door fridge set into it and a short run with a sink between the tall units.
💬 WhatsApp us about this design
pantry cabinet designs →These are illustrative concept designs created to show kitchen options for condo units. They are not completed ClickBina projects. We renovate condo kitchens in KL and Selangor, and your kitchen is assessed and quoted to its own layout, gas and plumbing points and your building's rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the points the building fixes: the gas supply, the water and waste pipes, the hood's possible exit, and the yard. Then decide open or closed. Most Malaysian condos were handed over with a closed kitchen and a service yard; opening it up looks better but brings cooking smells and grease into the living room.
Plan the yard at the same time. A washer, dryer and drying space have to fit there, and the yard is usually where the kitchen's only window is.
| Move | What it solves | Approval and checks |
|---|---|---|
| Glass sliding partition | Light and view, still closable | Usually none; check floor and ceiling fixing |
| Open kitchen with induction | One open room, no gas flame | Power circuit for the hob; hood type |
| Glass door to the yard | Daylight into an inner kitchen | Outdoor-rated frame; facade windows unchanged |
| Half-height counter in a wall | Opens kitchen to dining | Management approval; engineer's check |
| Recirculating hood | No duct route needed | Filter changes; heat stays in the room |
| Moving the sink or gas point | A different layout | Pipes and gas work need approval and the right trade |
| Your kitchen | Usually works | Watch for |
|---|---|---|
| Closed, gas cooking | Glass sliders or a reeded barn door, slim hood | Smell and grease when the doors are open |
| Open plan, induction | Island or one-wall run with a short island counter | Hood type and power circuit |
| Inner, no window | Glass yard door, light two-tone cabinets, LED under the wall units | Stains near the hob |
| Small L-shape | Pull-out corner, wall cabinets to the ceiling | Corner fitting widths |
| Kitchen next to the dining area | L bench against the kitchen wall or a half-height counter | Approval for any wall cutting |
This gallery covers the condo kitchen as a whole. For cabinet sizes and small-run layouts, see small kitchen cabinet design; for hood types and prices, the kitchen hood and hob guide; and for the open-or-closed decision in more depth, wet kitchen vs dry kitchen.
More styles are in the kitchen design gallery, and the laundry area design gallery covers the service yard behind most condo kitchens.
ClickBina's Kuala Lumpur kitchen guide puts a compact condo kitchen refresh with new cabinets, worktop and backsplash at RM12,000 – RM22,000, and a full mid-range remodel with a wet-and-dry partition and new appliances at RM22,000 – RM38,000. A wet-and-dry glass partition alone is RM2,000 – RM5,000. The small kitchen cabinet guide lists melamine at RM180 – RM300 and laminate at RM280 – RM420 per foot run (indicative Klang Valley ranges for 2026).
Ask for the cabinets, worktop, glass, hood and hob, and any plumbing or electrical changes to be listed separately, so you can see what the layout itself costs.
We renovate condo kitchens in KL and Selangor: cabinets, worktops, glass partitions, hoods and the yard behind them, planned around your gas and plumbing points and your building's rules. WhatsApp us your job details for a quote: the building, open or closed, how you cook and the look from this page you like. We'll reply as soon as we can with next steps, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a condo kitchen option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.