Old House Bathroom Design Malaysia: 12 Makeover Ideas
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Old House Bathroom Design
12 Makeover Ideas for a 30 to 50-Year-Old Bathroom

Browse 12 bathroom makeover looks for an older landed house, from removing the bathtub to keeping the retro tiles, then see what each involves.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: grey large-tile bathroom with a sliding glass shower, a tall frosted window, a seated toilet and floor traps

An old house bathroom often has a built-in bathtub, a squat toilet, coloured tiles, galvanised pipes and waterproofing that has outlived its design life. In a landed house there is no unit below, so hacking the floor to rebuild the falls and the waterproofing is normal and usually the right call. The look is then a choice: keep the retro pink or mosaic tiles you like, or go fully modern with a walk-in shower, a seated WC, a wall-hung basin and a proper exhaust. These 12 concept designs show full refits, retro keeps and safety upgrades. Use the filters below to narrow them by style or home type.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

How to plan an old house bathroom makeover

Start with what you cannot see. ClickBina's old house renovation guide explains that bathroom waterproofing in a 30 to 50-year-old house is past its design life, and that galvanised iron pipes more than about 25 years old should be replaced while the walls are open. In a landed house the bathroom has no unit below, so hacking the floor to rebuild the falls and the membrane is normal.

  • Strip and rebuild the floor and waterproofing if there are leaks, damp walls or poor falls.
  • Re-pipe to PPR before any new tiles go on.
  • Decide the look: keep coloured or mosaic tiles you like, or go fully modern.
  • Fix the air: a louvre window or an exhaust fan, so the new finish does not grow mould.
  • Plan for age: a seated WC, grab bars and an anti-slip floor if parents will use it.

For the rest of the house, the old house makeover gallery shows what to keep and what to replace in living rooms, floors and stairs.

Keep or replace: old bathroom features

Old featureKeep whenReplace when
Built-in bathtubSomeone uses it and it does not leakUnused, cracked, or leaking at the edge
Squat toiletEveryone is happy squattingParents find it hard, or you plan to sell or rent
Coloured or mosaic tilesSound, no leaks, and you like themHollow, cracked, or hiding a leak
Galvanised pipesRarelyRusty water, low pressure, or more than about 25 years old
Open vent blockRarelyDamp, mould and insects; fit a fan

Quick pick by house type

HomeUsually worksWatch for
Old single-storey terraceSkylight or louvre for a dark back bathroom, floor rebuiltRoof flashing round a skylight
Old double-storey terraceTub to walk-in shower upstairs, re-pipingLeaks into the ceiling below
Old semi-DLong bathroom split into WC and shower, wall-hung basinSeparate falls for each zone
Old bungalowMosaic floor kept, grab bars, anti-slip tilesLarger areas to waterproof

Checks before you start

  • Leaks. Find out whether the old bathroom leaks before deciding to keep tiles; tiles over failed waterproofing will leak again.
  • Drain positions. Moving a toilet or floor trap means breaking the slab; keep them where they are if you can.
  • Wiring. Heaters, fans and lights in a bathroom need safe wiring by a competent electrician.
  • Skylights. A new opening in the roof needs proper flashing; see the skylight guide.

What an old house bathroom makeover costs

ClickBina's guides quote (indicative Klang Valley ranges for 2026): a full hack-and-redo including retiling at RM4,500 – RM9,000 for a standard bathroom; a new WC supplied and installed from about RM350 – RM1,200; tiles supplied and laid at RM10 – RM18 per sq ft for ceramic and RM18 – RM35 for porcelain; a fixed shower panel at RM500 – RM900; mosaic niche work at RM20 – RM45 per sq ft; a basic polycarbonate skylight at RM1,500 – RM4,000; and concealed PPR re-piping for a terrace house at RM6,500 – RM11,000.

Ask for the hacking, waterproofing, plumbing, tiling and fittings to be listed separately, so you can see where the money goes and which items can wait.

How ClickBina can help

We renovate bathrooms in older houses, including hacking, waterproofing, re-piping, tiling and fittings, in the right order. WhatsApp us your job details for a quote: the house type and age, what is in the bathroom now, who uses it, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina old house renovation guide — waterproofing age, pipe age and the re-piping figure.
  • ClickBina tub-to-shower, squat-to-seated, bathroom re-tiling, small bathroom layout, shower niche and skylight guides — every other RM figure.

About the images: every image on this page is an illustrative concept design generated to show a bathroom option for an older house. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Should I remove the old bathtub?
If nobody uses it, most owners do. The floor under it is re-waterproofed and re-tiled with a fall to a drain; ClickBina's guide puts a full hack-and-redo including retiling at RM4,500 – RM9,000.
Can I keep my pink or green 1980s bathroom tiles?
Yes, if they are sound and the bathroom does not leak. Clean and re-grout them and pair them with simple white fittings.
Do I need to hack the floor of an old bathroom?
Often yes, when the waterproofing has failed or the floor does not drain. In a landed house there is no unit below, so rebuilding the falls and membrane is the lasting fix.
Should I change the pipes during a bathroom makeover?
If they are galvanised iron and more than about 25 years old, yes, while the walls are open.
How do I brighten a windowless back bathroom?
A small skylight brings daylight in; ClickBina's skylight guide puts a basic polycarbonate one at RM1,500 – RM4,000. Add an exhaust fan for air.
How do I make an old bathroom safe for elderly parents?
A seated WC, grab bars fixed into solid wall, anti-slip floor tiles and a level shower entry.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show bathroom options. Your bathroom is assessed and quoted after a check.

Get a Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides