Taking out a tub nobody uses? Here is what the job really involves, from the old waste pipe to the ponding test.
📍 We serve KL, Selangor & Putrajaya.

Removing a built-in bathtub and turning the space into a shower is a bathroom floor job, not just demolition: the tub and its apron come out, the old tub waste is capped or rerouted, the floor is re-screeded to fall to a new drain, a new membrane goes across the old tub area and up the walls, it is ponding-tested, and then the floor and the walls behind the tub are retiled. ClickBina's published figures put a full hack-and-redo including retiling at RM4,500 – RM9,000 for a standard bathroom (indicative 2026, Klang Valley).
Many older condos and terrace houses in the Klang Valley were handed over with a built-in tub in the main bathroom. Years later it is the least-used fitting in the house: adults shower standing up, the tub collects storage boxes, and the silicone around it turns black. ClickBina's bathtub guide calls this one of the most common bathroom changes: take out the tub nobody uses and turn the space into a walk-in shower.
There are practical reasons too. Stepping over the tub edge is where elderly parents slip. A tub that has leaked behind its apron is often cheaper to remove than to repair properly. And a shower area with a glass panel uses the same footprint but makes a small bathroom feel bigger.
The catch is that the tub does a job: it holds the water, it drains through its own waste, and the walls behind it were often never tiled or waterproofed to shower standard. The new shower floor has to take over all of that.
| Your situation | Usual answer | Why |
|---|---|---|
| Tub used by young children, only the silicone is black | Keep it and reseal the perimeter | The tub still works; resealing is a small job |
| Tub rarely used, bathroom renovation planned anyway | Remove it during the renovation | The floor and walls are opened once, not twice |
| Tub leaks to the unit below or behind the apron | Find the cause first, then decide | The leak may be the waste, the seal or the membrane |
| Elderly parent who struggles over the tub edge | Remove it and build a low or level shower | Removes the step that causes falls |
| Small bathroom with no separate shower area | Usually worth converting | A shower area with glass frees floor space |
| Master bathroom where a tub adds resale appeal | Consider keeping one tub in the house | Some buyers with children look for one |
If the tub is only stained or the silicone has failed, read the bathtub guide's section on small jobs first. Removing a tub is the right answer when nobody uses it or when it is causing a leak that a reseal will not cure.
A built-in tub drains through a waste and overflow at one end, connected under the tub platform to the bathroom drainage. When the tub comes out, that pipe end is suddenly exposed. Left open, it brings sewer smells and insects into the bathroom; left half-capped under new screed, it becomes a hidden leak point.
There are two clean options. If the tub waste sits near where the new shower drain should be, it can often be reused, with a proper floor trap or linear drain fitted to it so there is a water seal. If not, it is capped and the shower drains to the existing floor trap or a new one. ClickBina's floor trap vs linear drain guide compares the two drain types for smell, flow and tiling.
The tub platform usually sits on a raised base. Once it is gone, the shower area has to be built with a fall so water runs to the drain and not towards the bathroom door. How level you can make the new shower depends on how much screed depth there is above the slab.
In a landed house there is often room to build the fall properly, and on the ground floor the shower area can sometimes be set a little lower. In a condo the structural slab is common property and cannot be cut, so the fall has to be formed within the existing screed. ClickBina's walk-in shower guide explains when a kerb can go and when a small one has to stay. A low kerb with a glass panel is a perfectly good result if the floor depth will not allow a level entry.
This is the step that decides whether the conversion lasts. Under a tub, the floor only ever saw the odd splash; a shower floor is soaked every day. The membrane must run across the whole new wet area, be turned up the walls, be sealed around the drain and every pipe, and join the existing bathroom waterproofing without a gap.
Insist on a ponding test before tiling. It is the only time a membrane fault can be found cheaply; once the tiles are down, the first sign of a fault is often a stain on the ceiling below. ClickBina's bathroom waterproofing requirements guide sets out what a proper membrane and ponding test look like.
Pull out a built-in tub and you often find the wall tiles stop just above the old tub rim, or carry on behind it as rough render. A shower sprays the full wall height, so those walls need membrane and tile up to at least the shower head zone. Matching old tiles is rarely possible, which is why most owners retile the whole shower wall or the whole bathroom.
While the wall is open, decide where the shower mixer, the shower head, a niche and a grab bar will go. Pipes and fixings are far easier to place before tiling than after.
In a strata building, a bathroom floor job affects the unit below if anything goes wrong. Most management offices ask for a renovation application, a deposit and permitted working hours before any hacking. Do not cut into the structural slab, and keep debris out of the common drains.
If the reason for removing the tub is a leak downstairs, find the cause first. ClickBina's upstairs bathroom leak guide explains how a leak through the floor is traced before anyone starts breaking tiles.
Removing a tub and building a shower is effectively a bathroom floor hack-and-redo. These indicative Klang Valley figures (2026) are ClickBina's published ranges:
| Item | Indicative price | Notes |
|---|---|---|
| Full hack-and-redo including retiling, standard bathroom | RM4,500 – RM9,000 | The usual scope when a tub comes out |
| Hacking and debris disposal | RM900 – RM1,600 | Tub, platform, floor tiles and screed |
| Re-screed with falls | RM500 – RM1,000 | New fall to the shower drain |
| Waterproofing membrane | RM700 – RM1,300 | Across the wet area and up the walls |
| Tiling, supply and install | RM2,000 – RM3,800 | Floor plus the walls behind the old tub |
| Fixed glass shower panel | RM500 – RM900 | Keeps splashes in the shower area |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteRerouting the mixer pipes, a linear drain, a new floor trap and grab bars are priced on top, depending on what your bathroom needs. If you only want to keep the tub and stop the black silicone, resealing a bathtub perimeter is a much smaller job at RM100 – RM250.
ClickBina is an experienced KL & Selangor contractor for bathroom renovation, whole-house refurbishment and trade coordination, and a tub-to-shower conversion brings together hacking, screeding, waterproofing, plumbing and tiling. WhatsApp us your job details for a quote. We'll reply as soon as we can, the price we agree is a flat price with no hidden charges, and a renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount.
How we estimated prices: every RM figure on this page is quoted unchanged from ClickBina's published guides, where they are indicative 2026 ranges for the Klang Valley. Your price depends on the bathroom size, tile choice and what is found once the tub is out.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.