A sliding door that disappears into the wall: the kit, the wall it needs, new partition vs brick, and what makes up the cost.
📍 We serve KL, Selangor & Putrajaya.

A pocket door slides sideways into a hollow cavity inside the wall, so when it is open the leaf disappears and takes no floor or wall space. It needs a pocket door kit (a steel or timber frame with a top track) built into a wall that is at least as long as the door again beside the opening, with no pipes, cables or switches in that stretch. In a new gypsum stud wall it is straightforward; in an existing brick wall, part of the wall has to be hacked out and rebuilt around the kit. ClickBina quotes pocket doors per job; the components include hacking a non-structural brick partition at RM10 – RM25 per sq ft and a hollow-core door at RM250 – RM600 (indicative 2026, Klang Valley).
A pocket door is a sliding door that hangs from a track at the top of the opening and runs into a slot hidden inside the wall. When it is open you see only the edge of the door, or nothing at all. When it is closed it looks like an ordinary flush door. It suits places where a swing door would hit a bed, a cabinet, a toilet or a corridor wall, and where a surface-mounted barn door has no clear wall to slide onto. Our sliding door design guide compares the pocket door with barn, bi-fold and other sliding types.
The heart of the job is the kit. It is a frame that forms the pocket: split studs or steel channels that make a hollow box the width of the door, a top track with rollers that carry the door's weight, a floor guide that stops the door swinging in the pocket, and end stops. The kit is fixed in place first, the wall is boarded or plastered around it, and the door is hung last.
| Point | Pocket door | Barn (surface) door | Swing door |
|---|---|---|---|
| Space when open | None: slides into the wall | Needs clear wall beside the opening | Needs floor space for the swing |
| Wall work | Wall must be built around a kit | Track fixed above the opening | Standard frame |
| Sound and privacy | Gaps at edges; less sealed | Large gaps; least private | Seals best |
| Wall beside the opening | No pipes, cables, switches or shelves | No switches or art where it slides | Free to use |
| Later repairs | Track inside the wall; needs a good kit | Everything visible and easy to reach | Simple |
A pocket door wins on space, a swing door wins on sound and privacy, and a barn door is the simplest to fit. For a bathroom or bedroom off a tight passage, the pocket door is often the best compromise.
The wall beside the opening has to hold the whole door when it is open, so it must be at least as long as the door width again, and that stretch of wall cannot carry anything inside it. Check for:
New gypsum stud partition. This is the easiest case: the kit is set up as part of the partition frame and boarded over, which is why pocket doors are common in condo renovations that move walls anyway.
Existing brick wall. The brick beside the opening has to be hacked out over the length of the pocket, a lintel provided over the wider opening, the kit fixed, and the gap closed with boards or thin block and plastered to match. It is more disruptive and costs more, and the wall must be confirmed non-structural first. Our new door opening guide covers hacking, lintels and make-good for openings in brick walls.
A pocket door is a good fit for a small bathroom, with care. Choose a door that resists moisture (not a plain hollow-core door that swells), seal its edges, and keep the shower well away from the pocket so water does not run into the wall cavity. A pocket door seals less well than a swing door, so sound and smell travel more; for a bathroom off a living area, add a good extractor fan. Our bathroom door types guide compares moisture-resistant door materials.
ClickBina quotes pocket doors per job because the wall work varies so much. These are the published component figures that make up a typical job (indicative 2026, Klang Valley).
| Component | Indicative price | Source guide |
|---|---|---|
| Hack non-structural brick partition and disposal | RM10 – RM25 per sq ft | New door opening guide |
| RC lintel for a new opening in a brick partition | RM300 – RM800 per opening | New door opening guide |
| Make-good after hacking (patch, plaster, paint) | RM800 – RM2,500 per opening | New door opening guide |
| Hollow-core door, supply and install | RM250 – RM600 | New door opening guide |
| Single-skin standard gypsum partition | RM15 – RM22 per sq ft | Gypsum partition guide |
| Door opening in a gypsum partition (framing, lintel, finishing) | RM400 – RM900 | Gypsum partition guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteNot every row applies to every job. In a new gypsum wall, the pocket kit and door replace the hacking, lintel and make-good lines; in an existing brick wall, the hacking and make-good lines are usually the biggest part. The kit itself, soft-close dampers and a solid or moisture-resistant door move the total up.
| Problem | Usual cause | Prevention |
|---|---|---|
| Door scrapes or sticks in the pocket | Kit not plumb, or the wall bowed when boarded | Set the kit level and plumb; stiff frame |
| Door rattles or swings | Missing or loose floor guide | Fit and adjust the floor guide |
| Screw through the board hits the door | Someone fixed a shelf to the pocket wall | Mark the pocket; keep fixings off it |
| Door swells and jams | Plain door in a humid bathroom | Moisture-resistant door, sealed edges |
| Rollers worn, cannot reach them | Cheap kit with a fixed track | Kit with a removable door and accessible track |
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the hacking, partition, electrical point changes, plastering, door and painting for a pocket door can be planned as one job. WhatsApp us your job details for a quote: the room, whether the wall is brick or gypsum, and the rough opening width. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026. A complete pocket door is quoted per job.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.