New Door Opening in a Brick Wall: Process, Lintel & Cost
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🚪 Walls & Doors

Making a New Door Opening in a Brick Wall
Process, Lintel & Cost (2026)

Want a new doorway between two rooms? Here is which walls can take one, how it is done properly, and what it costs.

📍 We serve KL, Selangor & Putrajaya.

Freshly cut doorway in a brick wall with a concrete lintel across the top

A new door opening in a non-structural brick partition is a straightforward renovation job: the opening is marked, the brickwork cut out, a reinforced concrete lintel put in over the top, the door frame fixed and the wall made good. In a load-bearing wall it becomes a structural change that needs a professional engineer's design and approvals first. On ClickBina's guides an RC lintel for a new opening in a brick partition is RM300 – RM800 per opening and making good after hacking is RM800 – RM2,500 per opening, with the door itself on top (indicative 2026, Klang Valley).

When a new doorway makes sense

Owners cut a new doorway for all sorts of reasons: to give a bedroom its own door into a bathroom, to link the kitchen to the yard, to turn two small rooms into a suite, to give an elderly parent a shorter route to the toilet, or to create a second way into a room that is being rented out. Sometimes the old doorway is closed up at the same time.

It is a small opening compared with removing a whole wall, but the same rules apply. ClickBina's wall hacking guide sets out the first question for any opening: is the wall carrying load, or is it only a partition?

First: what kind of wall is it?

WallWhat a new opening involvesApprovals
Non-structural brick partitionCut out, RC lintel over the opening, frame, make goodCouncil usually not needed; condo management approval needed
Non-structural drywall partitionCut and frame the opening in the studsCondo management approval
Load-bearing wallEngineer-designed lintel or beam, propping, then cutEngineer's drawings, council and, in a condo, management
Party wall shared with a neighbourNot a place for a new doorwayNeighbour's consent at the very least
External wallStructural and planning question; also weatherproofingEngineer and council

The hacking guide's approvals column is the source for the first rows: a non-structural brick partition needs no council approval but does need JMB or MC approval in a condo, while a load-bearing wall needs a professional engineer, the council and, in a condo, the management. If there is any doubt about the wall type, the guide's advice is to have a professional engineer confirm it in writing before any hacking.

What to check before anyone cuts

  • What is above the opening. A beam running just above the new door head changes the job; so does a floor or a water tank sitting on the wall.
  • Pipes and cables in the wall. Switches and sockets beside the planned opening usually mean conduit running through it, and a wall next to a bathroom may carry water pipes.
  • What is on the other side. Built-in wardrobes, tiles or a kitchen cabinet run on the far face all have to come off and be put back.
  • The floor on both sides. Different tiles or floor levels meet in the new doorway and need a threshold or transition strip.
  • Door swing and furniture. Mark the door width and the arc of the leaf on the floor of both rooms before deciding the exact position.

For a sense of size, ClickBina's grille door guide notes that a standard full-height door opening on a terrace house is about 3 ft × 7 ft.

Why the lintel matters

ClickBina's lintel guide explains the principle: a wall is a stack of load, and when a hole is cut in it that load has to go around the hole. The lintel is the short beam across the top of the opening, bearing on the wall at each side. Without one, the load finds its own way down through the door frame and the brickwork above, and the result is cracks above the corners, a sagging head and a door that binds.

In a non-structural brick partition, the lintel is usually reinforced concrete, either precast and set in or cast in place. What size it is and how far it bears on each side are decisions for whoever designs the job; in a load-bearing wall they are an engineer's decisions, as the lintel guide makes clear.

How the opening is made, step by step

  1. Confirm the wall type and get management approval (condo) or engineer's drawings and approvals (load-bearing wall).
  2. Protect both rooms, and clear furniture, cabinets and fittings from both faces of the wall.
  3. Isolate and reroute any wiring or pipes that cross the opening.
  4. Mark the opening, including the lintel bearing on each side, and prop the wall above where the design calls for it.
  5. Cut the edges cleanly and remove the brickwork, working down from the top.
  6. Install the lintel over the opening and let cast concrete cure before loading it.
  7. Fix the door frame plumb and level in the opening, then plaster and skim the reveals and patched areas.
  8. Finish the floor in the doorway, fit skirting and architraves, hang the door and paint.

ClickBina's doors and windows guide makes a practical point about the frame: it should be set plumb and level in the opening before the wall is plastered, because an out-of-square frame is hard to correct once the plaster is on.

If the wall is load-bearing

A load-bearing wall can often still take an opening, but it is a different job. The hacking guide describes it: the opening is possible only with drawings stamped by a professional engineer and a beam or lintel designed for the load, and the floor or lintel above is supported before the wall below is removed. The lintel guide lists the engineer's assessment and drawings, and the lintel or beam itself, as separate items.

Do not let anyone skip the engineer to save money. A doorway cut into a load-bearing wall without the right support can crack the walls above, and in a strata building it is a breach of the building's rules as well.

Wiring, pipes and the old doorway

Most internal walls in Malaysian homes carry something. Sockets and switches may need to move to the side of the new door, which is an electrical job in its own right; ClickBina's power points guide covers adding and moving sockets. If the new doorway replaces an old one, the old opening is closed with brick, plastered and skimmed so it disappears into the wall, and the floor where the old doorway was is patched to match.

Floor, skirting and finishing details

The details that make a new doorway look original are all at the edges. The reveals (the short return walls inside the opening) need straight, square corners. Floor tiles or flooring from each room should meet in a neat line under the door, with a threshold strip if the floor levels or materials differ. Skirting is cut back and returned into the reveals, and the whole wall is repainted, not just the patches, so the repair does not show.

What a new door opening costs

A new doorway is priced as several items. These are the related prices published on ClickBina's guides (indicative 2026, Klang Valley).

ItemIndicative priceSource guide
Hack non-structural brick partition and disposalRM10 – RM25 per sq ftWall hacking guide
RC lintel for a new opening in a brick partitionRM300 – RM800 per openingLintel guide
Make-good after hacking (patch, plaster, paint)RM800 – RM2,500 per openingLintel guide
Hollow-core bedroom door, supply and installRM250 – RM600Bedroom door replacement guide
Engineer assessment and structural drawings (load-bearing)RM1,500 – RM5,000+Lintel guide
RC or steel lintel or beam in a load-bearing wallRM5,000 – RM15,000+Lintel guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Wiring changes, closing an old doorway, floor transitions and moving built-in carpentry are extra and depend on what is in and around the wall.

Common mistakes

  • Cutting the opening with no lintel, or with the door frame expected to carry the wall.
  • Assuming a wall is a partition because it sounds hollow or looks thin.
  • Starting in a condo before the management has approved the works.
  • Forgetting the conduit in the wall until the grinder finds it.
  • Placing the door where the swing blocks a wardrobe, a switch or another door.
  • Patching only around the opening instead of repainting the whole wall.

How ClickBina can help

WhatsApp us your job details for a quote: which wall, what is on each side, what is above it, whether it is a condo or landed house, and the door you want. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the hacking, lintel, wiring, plastering, flooring, door and painting are planned as one job. Where the wall is load-bearing, the first step is an engineer, and we will say so. We reply within the hour, and the price we agree is a flat price with no hidden charges. A site visit is free.

Sources & methodology

  • ClickBina lintel guide — what a lintel does, new openings, the engineer's role, and lintel and make-good prices.
  • ClickBina wall hacking guide — load-bearing versus partition walls, approvals and hacking prices.
  • ClickBina bedroom door replacement guide — door supply and install price.
  • ClickBina grille door guide — standard door opening size.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Can I cut a new door into any brick wall?
A non-structural brick partition, yes, with a lintel over the opening. A load-bearing wall needs an engineer's design and approvals first, and a party wall is not the place for a new doorway.
Do I need council approval for a new doorway?
For a non-structural partition, usually not, though a condo needs management approval. A load-bearing wall needs engineer's drawings and council approval.
Why does a new opening need a lintel?
The wall above the opening has to be carried around it. Without a lintel the load presses on the frame and brickwork, and cracks and a sagging head follow.
How much does a lintel for a new door opening cost?
ClickBina's lintel guide lists an RC lintel for a new opening in a brick partition at RM300–RM800 per opening (indicative 2026, Klang Valley).
What does the whole job cost?
Add hacking at RM10–RM25 per sq ft, the lintel, make-good at RM800–RM2,500 per opening and the door, plus any wiring or flooring changes.
How big is a standard door opening?
ClickBina's grille door guide gives a standard full-height door opening on a terrace house as about 3 ft × 7 ft.
Can the old doorway be closed at the same time?
Yes. It is bricked up, plastered and skimmed, and the floor is patched, so it disappears into the wall.