For older landed houses: why the longkang ponds or overflows, which fix suits it, and how to cover it without losing access.
📍 We serve KL, Selangor & Putrajaya.

Most problems with the drain around an older landed house come down to four things: silt and leaves blocking it, cracked or sunken sections, a channel that no longer falls to its outlet, and a drain that is simply too small for the roof and paving that now drain into it. Clear it and watch it in the rain first; then repair the broken sections, rebuild the runs that pond, and only resize when the drain overflows even when clean. Cover it with removable gratings rather than sealing it shut. ClickBina's guides put clearing a blocked drain at RM120 – RM350 and a channel drain, supply and install, at RM150 – RM500 per metre (indicative 2026, Klang Valley).
The open drain (longkang) that runs along the outside walls of a terrace, semi-D or bungalow carries roof water from the downpipes and rain off the apron to the monsoon drain. When it stops working, the symptoms show up around the house long before anyone looks into the channel itself.
| What you see | Likely cause | Usual fix |
|---|---|---|
| Water stands in the same stretch days after rain | Silt build-up or a section that has sunk and lost its fall | Desilt, then re-screed or re-lay that run |
| Drain overflows onto the apron or porch in heavy rain | Blockage downstream, or a drain too small for the roof area | Clear first; resize only if it still overflows |
| Damp marks rising on the outside wall | Water sitting against the wall, or a crack at the drain edge | Repair the drain wall and seal the apron joint |
| Cracks or a broken drain wall | Settlement, tree roots or vehicles driving over the edge | Replace and re-bed the broken sections |
| Mosquito larvae and green slime | Standing water in low spots | Restore the fall so the drain empties |
| Bad smell near the kitchen or bathroom side | Waste water or debris rotting in a ponding drain | Desilt, restore the fall, check the connections |
| Covers rocking, broken or missing | Wrong size covers or a cracked seat | New covers that fit the channel |
For a new house still under its defect liability period, the developer should put falls and cracks right; our perimeter drain defects guide explains how to report them. This page is for the owner of an older house who has to fix it themselves.
| Option | Suits | Limits |
|---|---|---|
| Clear and desilt | A drain that ponds or overflows but is structurally sound | Comes back if the cause is upstream sand or a lost fall |
| Patch cracks and the drain edge | Fine cracks in a drain that still falls correctly | Does not fix sections that have sunk |
| Re-screed the base to a fall | Runs that pond because the base is flat or back-falling | The screed must be bonded and the outlet low enough |
| Replace and re-bed sections | Broken, sunken or root-damaged lengths | Needs a firm base or it sinks again |
| Rebuild the run | Long stretches that are broken, too shallow or wrongly placed | The biggest job; plan levels to the outlet first |
Clearing is the first step for any drain problem, because it shows what is underneath. Our drain cleaning guide explains the methods. Where roots or packed silt run inside a buried pipe section rather than the open channel, hydro-jetting is the tool that clears the full bore.
A drain that overflows in heavy rain even when it is clean and falls correctly is undersized for the water it now carries. This is common after a house has been extended, a car porch roofed, or the garden paved, because every one of those adds roof or hard area that drains into the same channel.
Where the garden itself floods, the garden drainage guide covers channel drains, French drains and where the water can legally go.
Owners cover drains to stop trips, mosquitoes, smells and leaves, and to gain a wider path beside the house. The rule is simple: a drain you cannot open is a drain you cannot clear.
| Cover type | Strengths | Watch for |
|---|---|---|
| Removable steel gratings | Water and air get in, lift out for cleaning, flush with the apron | Must be galvanised or coated; buy the load class for cars where needed |
| Precast concrete covers | Strong, cheap, look like part of the apron | Heavy to lift; leave gaps or slots so water can enter |
| Covers with grating at intervals | Solid path with inspection and inlet points | Inspection points must be at bends, junctions and downpipes |
| Fully closed (cast over) | A wider continuous floor | No access for clearing; smells and blockages are hidden until they flood |
Under a driveway or car porch the cover must take a car's weight; our drain grating guide explains load classes and why light walkway gratings bend under wheels.
Before a back kitchen or yard is extended or roofed, decide what happens to the drain underneath. Building straight over a perimeter drain without access points is the most common reason a renovated terrace house floods its back kitchen years later.
Our rear kitchen extension guide covers the extension itself.
The concrete apron between the wall and the drain should fall away from the house so rain runs into the drain. When it has sunk or tilts towards the wall, water sits at the base of the wall and damp creeps up the paint. Re-lay or top the apron to a fall, and seal the joint at the wall with a flexible sealant rather than mortar, which cracks again. If the porch slab next to the drain is also cracking, our cracked porch slab guide helps decide between patching and recasting.
These are ClickBina's published figures (indicative 2026, Klang Valley). Rebuilding or resizing a run is priced after the levels to the outlet have been checked, because depth, access and hacking drive the total.
| Item | Indicative price | Source guide |
|---|---|---|
| Clearing a blocked drain (localised) | RM120 – RM350 | Drain cleaning guide |
| Drain desilting / clearing, longer runs | From RM300 per visit | Drain grating guide |
| Channel or trench drain, supply and install | RM150 – RM500 per metre | Drain grating guide |
| Galvanised steel grating, supply | RM60 – RM220 per metre | Drain grating guide |
| Heavy-duty cast or ductile-iron cover, supply | RM150 – RM650 per piece | Drain grating guide |
| Gutter / downpipe repair | RM300 – RM1,500 | Gutter and downpipe guide |
| Hacking out an old floor, including debris disposal | RM1.50 – RM3 per sq ft | Porch flooring guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. RM180 for the inspection visit. If you go ahead with the repair, we'll give you a discount. We serve KL, Selangor & Putrajaya.
To quote faster, tell us your area, property type and the size or quantity.
💬 WhatsApp for a quoteGutters that overflow along the wall add to the water the drain has to carry; the gutter and downpipe guide covers that side.
WhatsApp us your job details for a quote: your area, house type, the rough length of drain, and what is happening (overflowing, ponding, cracked, or you want it covered). ClickBina is an experienced KL & Selangor contractor that clears drains and coordinates the hacking, concrete, gratings and apron work as one job. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. RM180 for the inspection visit. If you go ahead with the repair, we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.