Termites, rot or a sagging roof line all point to the frame. Here is how to decide between repair, timber and light steel.
📍 We serve KL, Selangor & Putrajaya.

Timber roof trusses that are termite-eaten, rotten or sagging can be repaired, strengthened or replaced; when a large part of the roof is affected, many owners replace them with light steel trusses, which termites cannot eat. Either way the new structure must be designed for the roof covering it will carry, by an engineer or the truss supplier, not sized by eye. ClickBina's roofing guides put truss repair or replacement at RM5,000 – RM20,000 as an add-on to a re-roof (indicative 2026, Klang Valley).
A truss is the triangulated frame that holds the roof up. Rows of trusses sit on the walls or beams, battens run across them, and the tiles or metal sheets sit on the battens. The truss carries the weight of the roof covering and passes it down to the walls. When one member fails, the load shifts to its neighbours, which is why a sagging roof line is a sign to act on, not a cosmetic problem.
Most older Malaysian terraces have timber trusses. ClickBina's Kuala Lumpur renovation guide notes that older terraces may have timber roof trusses that need inspection for termite damage and rot, and that roof repairs should be dealt with before interior work begins.
Look from below with a torch, and do not walk on timbers you suspect are damaged. ClickBina's termite damage repair guide is clear that termites in roof trusses and battens are a structural matter that needs assessment before carpentry.
| What the inspection finds | Usual answer | Why |
|---|---|---|
| A few damaged members, termites treated | Replace or splice those members | The rest of the frame is sound |
| Members undersized for a heavier roof | Strengthen as the engineer specifies | The frame was built for a lighter load |
| Rot confined to one leak area | Fix the leak, replace the rotten timbers | Water was the cause, not the frame |
| Widespread termite damage or sagging | Strip the roof and replace the trusses | Patching a failing frame costs more over time |
| Re-roofing anyway, timber in poor shape | Replace while the roof is open | Stripping and scaffolding are paid once |
Before any repair, the termites have to be dealt with. New timber fixed next to an active colony is simply new food; see the termite inspection guide.
| Point | Timber trusses | Light steel trusses |
|---|---|---|
| Termites | Vulnerable unless treated, and treatment wears off | Termites cannot eat steel |
| Rot and damp | Rots where leaks persist | Coated steel resists rot; damage to the coating needs attention |
| Weight | Heavier members | Lighter members for the same span |
| Design | Often built by carpenters to traditional sizes | Usually designed by the supplier's engineers for the roof load |
| Installation | Cut and fixed on site | Pre-cut or pre-fabricated, then fixed on site |
| Future changes | Easy to cut and alter | Should not be cut or altered without the designer's approval |
Light steel is not automatically better for every roof. It removes the termite risk from the roof frame, but the house still needs termite protection for doors, floors and cabinets, and the steel must be protected where it meets walls and where leaks could sit on it.
A roof frame is structure. Its members are sized for the span, the pitch and the weight of the covering, and for how it is fixed to the walls. A replacement should be designed, either by a professional engineer or by the truss supplier's own engineers, with drawings that show member sizes and fixings. Ask for these drawings before work starts, and keep them.
ClickBina's renovation permit guide lists changes to the roof line or roof pitch among the works that need council approval. Replacing trusses to the same roof shape is different from changing it, so confirm with the engineer or the council which applies to your job.
Truss replacement often goes with a change of roof covering. The metal vs tile roof guide explains the trade-off: tiles are heavy and need trusses that can carry them, while metal is light and suits low pitches. ClickBina's roof tile types guide adds that switching between tile and metal is not like-for-like, because the battens have to be reconfigured. Decide the covering first, because the frame is designed around it.
A roof opened in the rainy season needs a plan for temporary cover at the end of every working day. Ask the contractor how the house will be kept dry while the roof is off.
ClickBina's roofing guides price truss work as an add-on to a re-roof, alongside the other structural items (indicative 2026, Klang Valley):
| Item | Indicative price | Notes |
|---|---|---|
| Truss repair or replacement | RM5,000 – RM20,000 | Add-on to the re-roof itself |
| Stripping and disposing of the old roof | RM1,500 – RM4,000 | Add-on |
| Replacing battens | RM2,500 – RM6,000 | Add-on |
| Scaffolding | RM1,000 – RM3,000 | Add-on |
| Termite-damaged timber trusses: treat, replace damaged members, relay roof | RM8,000 – RM30,000 | Kuala Lumpur renovation guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteThe spread is wide because it depends on how many trusses are affected, the roof area, and whether the whole roof comes off. Ask for the truss work, the roof covering and the scaffolding to be priced as separate lines.
In a terrace, the roof is continuous across the party wall and the trusses may bear on it. Work at the boundary affects the neighbour's roof, flashing and ceiling. Tell the neighbour before work starts, agree how the junction will be made watertight, and record the condition of their side first.
WhatsApp us your job details for a quote: what you have seen in the roof space, whether termites have been treated, the roof covering, and whether you want to change it. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina roof rust grading and Kuala Lumpur renovation guides, where they are published as indicative 2026 ranges for the Klang Valley.