Starting a big renovation? Here is how the strip-out stage works, what must stay, and what to check before anything is hacked.
📍 We serve KL, Selangor & Putrajaya.

Strip-out is the first stage of a renovation: removing old ceilings, flooring, tiles, kitchen and bathroom fittings, built-in carpentry and non-structural partitions so the new work starts on a clean, sound base. It is not a free-for-all: structural walls, columns and beams stay, services must be isolated first, strata units need management approval, and the debris must be removed properly. On our guides hacking a brick partition with disposal is RM10–RM25 per sq ft and debris removal RM400–RM1,200 per bin or load (indicative 2026, Klang Valley).
Strip-out, hacking or demolition before renovation all describe the same stage: taking out whatever will not stay, down to the parts of the building that will. In a full refurbishment that can mean everything except the structure, the main services and the windows. In a partial job it may be one kitchen and two bathrooms.
| Level | What comes out | Typical project |
|---|---|---|
| Soft strip | Loose fittings, carpentry, curtains, lights, old appliances | Repaint and new furniture, rental refresh |
| Room strip | One kitchen or bathroom back to the wall and floor substrate | Kitchen or bathroom renovation |
| Full strip | Ceilings, floor finishes, wall tiles, fittings, carpentry, non-structural partitions | Whole-house refurbishment, older or lelong units |
Knowing the level before you ask for quotes stops two contractors pricing different jobs.
Load-bearing walls, columns, beams and slabs are not part of a strip-out. Removing or cutting them needs a professional engineer's assessment and the local authority's approval. Our wall hacking guide explains how to tell a partition from a load-bearing wall, and the unauthorised hacking guide explains what happens when that line is crossed.
In a condo, anything that is common property, such as the facade, external walls, balcony railings, shared risers and the slab itself, stays too. The building's renovation rules say what you can and cannot touch.
For a landed house, the local council may require a minor-works permit and a debris deposit, depending on the work and the council. For example, the Subang Jaya council's minor-works permit asks for an RM250 construction-debris deposit, as recorded on our debris disposal guide. For structural alterations, plans and approvals are needed.
In a condo, submit the renovation form, scope and contractor details to the management and wait for written approval. Buildings usually restrict hacking to set hours, require the service lift to be booked and protected, and may ask for a refundable deposit. Our strata renovation rules guide covers the typical conditions.
Floor tiles are broken out with the screed if the new floor needs a fresh, level base, or left in place if the new finish can go over sound tiles. Hollow or popped tiles usually have to come out. Wall tiles in kitchens and bathrooms come off back to the plaster or brick, which is also the moment to check the pipes behind. Old plaster ceilings are taken down when they are sagging, stained or in the way of new wiring and aircon piping.
Our floor tile replacement guide explains when the old floor must come out and how that changes the price.
A kitchen or bathroom strip-out goes back to the substrate: tiles, screed, fittings and often the old pipes. In a bathroom that is the point where the old waterproofing is removed and must be replaced properly before any new tile goes down. Leaving a stripped wet area exposed for long is a risk in a condo, because any water that gets through can reach the unit below.
A full strip-out produces a lot of debris. It leaves the site by bags carried to a lorry, by a RoRo bin on a landed property, or by scheduled removal through a condo's service lift. Debris must go to a proper disposal site; illegal dumping can come back to the owner. Our debris disposal and RoRo bin guide explains bin sizes, council rules and what the quote should say.
The inspection after strip-out matters. It is when hidden problems show up, and it is far cheaper to fix a rotten pipe or a termite trail with the walls open than after new tiles and carpentry are in.
These are indicative Klang Valley ranges for 2026 from the ClickBina guides named in the sources section. A whole-house strip-out is priced after a site visit, because the scope varies so much.
| Item | Indicative price | Source guide |
|---|---|---|
| Hack non-structural brick partition, with disposal | RM10 – RM25 per sq ft | Wall hacking guide |
| Hack drywall partition, with disposal | RM5 – RM12 per sq ft | Wall hacking guide |
| Make good after hacking, per opening | RM800 – RM2,500 | Wall hacking guide |
| Break out old floor tiles, with disposal | RM1.50 – RM3 per sq ft | Floor tile replacement guide |
| Bathroom hacking and debris disposal (full hack to substrate) | RM1,500 | Bathroom renovation cost guide |
| Debris disposal, per bin or load | RM400 – RM1,200 | Debris disposal and RoRo bin guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteClickBina handles whole-house refurbishment and coordinates the trades, including older and lelong units that need a full strip-out before anything else can happen. Strip-out, debris, services and the new work are planned as one job, so what is found behind the walls is dealt with before it is covered up. WhatsApp us your job details for a quote: the property type, which rooms and what needs to come out. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are indicative Klang Valley market ranges for 2026, not fixed rates. Council and building requirements vary; check with your council and management.