Rain, leaves and mosquitoes on one side, light and fresh air on the other. Here is how to choose.
📍 We serve KL, Selangor & Putrajaya.

Keep the air well open if it is the main source of light and fresh air for the rooms around it; cover it with a ventilated skylight or polycarbonate roof if rain, leaves and mosquitoes are the problem; enclose it as floor space only with an architect's check and council approval. Covering it fully without ventilation usually makes the middle of the house hotter. On ClickBina's skylight guide, a small fixed polycarbonate skylight is RM1,500 – RM3,500 installed and a custom steel-and-glass roof section RM15,000 – RM35,000+.
An air well is the open gap inside the footprint of a terrace, semi-D or older shophouse-style home, open to the sky, usually near the stair or between the front and back halves of the house. It brings daylight into rooms that have no outside wall, lets hot air rise out of the middle of the house, and lets rain fall onto a small drained floor instead of into the rooms.
ClickBina's terrace house interior design guide calls the air well the biggest asset in a terrace house, if it has one: opened up, glazed over with a skylight, or planted as an internal courtyard. The question for most owners is not whether the air well is useful, but how to keep its light and air without living with its rain, leaves and insects.
ClickBina's burglar-proofing checklist lists an air well among the things a person standing in a shared back lane might reach, alongside drying yards and low roofs, which is why many covers include a grille or a fixed top.
| Route | What it involves | Keeps light? | Keeps air? | Approval |
|---|---|---|---|---|
| Keep it open, fix the problems | Better drain, top grille or mesh, planting, splash-proof finishes | Yes | Yes | Usually none for small works |
| Cover it with a roof or skylight | Polycarbonate or glass roof, ideally with a ventilation gap or vented skylight | Yes | Partly, if ventilated | Ask the council; strata schemes need management approval |
| Enclose it as floor space | Roof plus walls or a new floor slab, turning it into a room | Only through a skylight | Only if designed in | Treat it as building work that needs approval |
Most owners choose to cover the air well and keep it as a light well. The two common materials are polycarbonate sheet and glass. ClickBina's polycarbonate roofing guide lists air-well covers among the usual uses of the material, because it is light, lets daylight through and is cheaper than glass. Glass looks clearer and lasts longer but needs a stronger frame.
The detail that matters most is ventilation. A sealed lid over an air well traps the hot air that used to escape, and the middle of the house warms up. Options that keep some airflow include a raised roof with a gap or louvres on the sides, a vented skylight, or a cover that stops short of the full opening. ClickBina's guide to a skylight that is too hot explains the order of fixes if a cover already makes the room uncomfortable: shade it, film it, let the hot air out, then upgrade the glazing.
Turning the air well into floor space, for example a bigger kitchen, a dining area or a study, changes the building, not just its finishes. Treat it like an extension: an architect or draughtsman checks the plans, the council decides whether approval is needed, and any new floor slab or roof structure is designed by an engineer.
The air well may also be how the rooms beside it meet the building by-laws. ClickBina's store room conversion guide quotes By-law 39 of the Uniform Building By-Laws 1984: every room used for residential purposes needs natural lighting and ventilation through windows of not less than 10 percent of the clear floor area. Close the air well, and a bedroom or kitchen whose only window faced it may no longer meet that rule.
Whatever you choose, water has to go somewhere. An open air well needs a floor that falls to a working drain sized for a storm, and a raised step or upstand so water does not run into the rooms. A covered air well moves the problem up: the roof must shed water into a gutter or onto the main roof without pouring onto the walls, and the junction between the new cover and the old walls needs proper flashing.
ClickBina's skylight cost guide is clear about this: a properly sealed install with aluminium flashing, liquid membrane and weep channels adds RM500–RM2,000, and it is what prevents leaks. Ask any contractor exactly how the junction will be sealed before you accept a quote.
ClickBina publishes these figures on its skylight and polycarbonate guides. The air well's size, the height of the opening and the access for scaffolding move a job within each range:
| Option | Indicative price (Klang Valley, 2026) | Source guide |
|---|---|---|
| Small fixed polycarbonate skylight | RM1,500 – RM3,500 | Skylight cost guide |
| Small fixed glass skylight | RM3,500 – RM7,000 | Skylight cost guide |
| Vented glass skylight, motorised | RM10,000 – RM18,000+ | Skylight cost guide |
| Custom steel-and-glass roof section | RM15,000 – RM35,000+ | Skylight cost guide |
| Polycarbonate or awning-style roof, per metre run | RM350 – RM1,800 | Polycarbonate roofing guide |
| Proper flashing, membrane and weep channels | RM500 – RM2,000 | Skylight cost guide |
| Low-E or solar-control coating, per skylight | RM500 – RM2,000 | Hot skylight guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteClickBina is an experienced KL & Selangor contractor for roofing, renovation and whole-house refurbishment, so the cover, the drainage, the grille and the finishes around an air well can be planned as one job. WhatsApp us your job details for a quote: the area, the property type and the rough size of the air well. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every figure is quoted unchanged from the ClickBina guide named beside it; they are indicative Klang Valley ranges, not a quotation. This page is general information, not architectural or legal advice.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.