That small room full of boxes can do more. Here is what it can become, what the building by-laws expect, and how to plan air, power and storage.
📍 We serve KL, Selangor & Putrajaya.

A store room or small box room can become a study, a walk-in wardrobe, a prayer room, a nursery or a properly organised storage room, but the room’s window, ventilation and size decide what is sensible. Malaysia’s Uniform Building By-Laws expect rooms to have windows of at least 10 percent of the floor area, unless permanent mechanical ventilation or air conditioning is provided, and they set minimum room sizes. A windowless store under the stairs makes a good storage or wardrobe space, not a bedroom. Plan power, lighting, air and built-in storage together, and fix any damp first.
In Malaysian homes the spare small room takes a few forms: the third bedroom of a condo that is too small for a bed and a wardrobe, a store room beside the kitchen or yard, the space under the stairs in a terrace house, or a former maid’s room with a small high window. Most end up as a dumping ground. With a clear use in mind and a modest budget, the same space can earn its keep.
| New use | Works best when | Guide |
|---|---|---|
| Study or home office | The room has a window or can take an aircon; needs power and data | Study room design |
| Walk-in wardrobe | Next to the master bedroom; no window needed but ventilation helps | Walk-in wardrobe |
| Prayer room | Quiet, clean, correctly oriented; a small room is enough | Prayer room design |
| Organised storage room | Windowless or awkward rooms; full-height shelving | Floating shelves and bookcases |
| Nursery or child’s room | Has a proper window, ventilation and size | Check the room rules below |
Our study room design guide, walk-in wardrobe guide and floating shelves guide go deeper on each use. A guest room with a day bed or wall bed is another common choice.
Start from how the household actually lives. A family that works from home three days a week gets more from a quiet study than from a spare bed used twice a year. A couple with overflowing wardrobes gains more from a walk-in wardrobe beside the master bedroom. If the room is mainly holding luggage, festive decorations and tools, a well-shelved storage room with good air may be the right answer, and it frees space everywhere else in the home. Write down what the room must hold before choosing furniture or carpentry.
The Uniform Building By-Laws 1984 set the baseline. By-law 39 says every room used for residential purposes shall have natural lighting and ventilation through windows with a total area of not less than 10 percent of the clear floor area, and not less than half of that must open to let air through. By-law 41 adds that where permanent mechanical ventilation or air conditioning is intended, the natural ventilation, lighting and room-height by-laws do not apply, with a back-up way of bringing in fresh air.
In practice, a room without a window is a poor choice for sleeping or long working hours unless it has proper mechanical ventilation. It is a very good choice for storage and a walk-in wardrobe, where air movement matters more than daylight.
By-law 42 sets minimum room areas in residential buildings: not less than 11 square metres for the first habitable room, 9.3 square metres for the second, and 6.5 square metres for all other rooms, with every habitable room at least 2 metres wide. A small store room below those figures can still be a useful wardrobe, study nook or storage room; it is simply not a habitable room in the by-law sense.
Closed store rooms trap humid air, and humid air means mould on walls, clothes and paper. Whatever the new use, plan for air:
Store rooms are usually wired for one light and nothing else. A study needs sockets at desk height, a data point or good Wi-Fi, and task lighting; a wardrobe benefits from lighting inside the cabinets and a switch at the door; a prayer room wants soft, even light. Our power points guide explains how new sockets are added and priced.
The floating shelves guide notes that built-in carpentry is priced per foot run and that shelves must be thick enough or supported for their load.
In terrace houses, the store under the staircase is often the biggest wasted space in the home. It suits pull-out drawers, a shoe store, a small wardrobe or a tidy utility cupboard. Our staircase renovation guide covers under-stair storage as part of a staircase refresh.
Most conversions change finishes, not structure: new flooring, paint, a better door, built-in cabinets. Moving or removing a wall is different. Our hacking guide explains why nothing structural should be touched without an engineer, and condos need management approval for most works. A room that becomes a bedroom should meet the window and size rules above.
These are figures published on ClickBina’s own guides (indicative Klang Valley).
| Item | Indicative price | Source |
|---|---|---|
| Wall or ceiling exhaust fan, installed | RM150–RM400 | Exhaust fan guide, where a power point exists |
| New wiring point for a fan | RM80–RM200 | Exhaust fan guide |
| Built-in wardrobe | RM180–RM600 per foot run | Built-in wardrobe cost guide |
| Cabinet run with laminate or HPL doors | RM280–RM420 per foot run | Floating shelves guide |
| Site visit | Free / RM180 | Free for renovation; RM180 repair inspection, deducted if you go ahead |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteMost small-room conversions are a mix of carpentry, electrical points, painting and flooring. Pricing them together on one job is usually cheaper than calling each trade separately.
A room conversion touches carpentry, wiring, paint, flooring and sometimes aircon, and ClickBina handles whole-house refurbishment with the trades coordinated on one job. WhatsApp us your job details for a quote: the room size, whether it has a window, and what you want it to become. We reply within the hour, the price we agree is a flat price with no hidden charges, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
Pricing note: prices are indicative Klang Valley figures quoted from ClickBina’s published guides; a conversion is priced in writing after the room has been measured.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.