Turning the back yard into a working kitchen or a BBQ corner? Here is what to get right first: the roof, cabinets that cannot rot, a top that takes the sun, and a sink that drains properly.
📍 We serve KL, Selangor & Putrajaya.

An outdoor kitchen in a Malaysian home is usually a covered back-yard or side-yard counter with a sink, a gas or charcoal cooking point and weatherproof cabinets, sometimes grown into a full BBQ area under a gazebo. Get four things right and it lasts: a proper roof, cabinets that cannot rot (stainless steel or aluminium, not wood), a top that shrugs off sun and heat, and a sink that drains to the right place. Indicative Klang Valley prices on our guides put stainless steel cabinets at RM650 – RM1,000 per ft run, a sintered stone top at RM400 – RM900 per foot run, and a BBQ area added to a gazebo at RM3,000–RM12,000. A permanent roof attached to the house usually needs council approval, so plan that step before you order anything.
In most Klang Valley terrace, semi-D and bungalow homes, the “outdoor kitchen” is not a showpiece grill island from a magazine. It is the back yard or side lane turned into a working space: somewhere to fry with a big wok flame, wash seafood, grill satay for a family gathering, or keep the heavy, smoky cooking out of the house. Many homes already use the back yard this way with a portable stove and a hose; an outdoor kitchen simply makes it permanent, dry and easy to clean.
There are three common versions. The simplest is a BBQ corner: a counter beside the grill with space to prepare and serve. The middle version is an outdoor wet kitchen, with a sink, a gas cooking point and cabinets, often built as an extension of the indoor wet kitchen. The largest is a BBQ area inside a gazebo or pergola, with seating, lighting and fans for entertaining.
Which one suits you depends on how often you will actually cook outside. A space used every day needs a sink and proper drainage; a space used for a few parties a year needs shelter, a solid counter and good lighting more than it needs plumbing.
Eleven outdoor kitchen and BBQ area designs for Malaysian homes: straight runs along the back yard or side lane, L-shapes, an island counter and BBQ corners, in stainless steel, aluminium, granite, sintered stone and a concrete base with metal doors, for terrace, semi-D and bungalow yards and one condo balcony. Each card is an illustrative concept render; filter by layout or by home, tap an image to enlarge it, and open the details for where it suits, the finish and what to watch.
11 designs shown
Illustrative concept design · Straight run · Terrace
A single brushed stainless run with a long sink and two gas burners sits between bare concrete walls under clear roof panels, with a warm light strip along the plinth.
💬 WhatsApp us about this design
Stainless vs aluminium cabinets →Illustrative concept design · L-shape · Semi-D
White shaker-style aluminium doors with bronze bar handles turn the corner of a patio beside the lawn, with the gas hob on the short leg and a light grey concrete-look top.
💬 WhatsApp us about this design
Stainless vs aluminium cabinets →Illustrative concept design · Straight run · Terrace
Flat pale sage metal doors on visible hinges fill a white rendered concrete base, under a dark speckled granite top with a small sink at one end and a gas hob at the other.
💬 WhatsApp us about this design
Stainless vs aluminium cabinets →Illustrative concept design · Straight run · Bungalow · Semi-D
A long run of teak wood-grain flat-front cabinets sits under a polished black granite top and upstand, with a gas hob and an undermount sink, against a grey stone-strip wall.
💬 WhatsApp us about this design
Granite prices →Illustrative concept design · Island counter · Bungalow
A long island with a pale speckled sintered stone top and brushed stainless doors stands under a white pergola with clear roof panels, with a flush cooktop, a flat griddle plate and two stools.
💬 WhatsApp us about this design
Sintered stone worktops →Illustrative concept design · BBQ corner · Semi-D · Terrace
A long black steel charcoal trough with a wire grate sits on a red brick counter capped in smooth concrete, with paving and shrubs around it.
💬 WhatsApp us about this design
Gas leak detectors →Illustrative concept design · BBQ corner · Condo
A short run of pale grey cabinets with a white top holds a round electric grill pan, with a covered outdoor socket box on the wall and a glass balustrade beside it.
💬 WhatsApp us about this design
Balcony design ideas →Illustrative concept design · Straight run · Semi-D · Terrace
Navy blue cabinets and drawers with a white top and a stainless double sink run along a white brick wall right beside the open back door, under clear roof panels.
💬 WhatsApp us about this design
Wet and dry kitchens →Illustrative concept design · L-shape · Bungalow
Light oak-look cabinets turn an L under a white boarded roof with warm downlights and a white ceiling fan, a flush gas hob and a sink set in a pale stone top, seen at dusk.
💬 WhatsApp us about this design
Outdoor lighting →Illustrative concept design · Straight run · Terrace
A deep stainless sink with a basket strainer and wire grid is set in a stainless worktop on legs, with a slotted floor drain grating on the dark grey tiles beside it.
💬 WhatsApp us about this design
Garden pest control →Illustrative concept design · Straight run · Terrace
White cabinets with an orange terracotta-tiled top and splashback, a gas hob and a small sink run along one wall of a side lane under clear roof panels, leaving a clear path to the back gate.
💬 WhatsApp us about this design
Renovation permits →These are illustrative concept designs created to show the options. They are not completed ClickBina projects. Prices shown are the indicative cabinet or worktop rates per foot run from the tables on this page; the roof, plumbing, drainage and electrical points are extra, and cards without a price are quoted per job. We build and install outdoor kitchens as part of our renovation work. WhatsApp us your job details (the size of the space, whether it is covered, and how you plan to cook) for a quote.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Malaysian weather decides whether an outdoor kitchen gets used. Afternoon sun makes an open counter too hot to touch, and a sudden downpour ends the cooking. So the roof comes first. The usual choices are an awning fixed to the house wall, a freestanding pergola, or a full gazebo when the kitchen is also an entertaining space. Our gazebo cost guide compares frames and roof sheets in detail.
Two practical points matter more than the look. First, the roof must shed rain away from the counter and the gas point, with a gutter so the water does not fall where people stand. Second, smoke needs somewhere to go: a low, fully enclosed roof traps grill smoke under it. Leave the sides open or high enough for smoke to escape, and keep the grill away from the house windows and your neighbour’s.
Back yards in terrace houses are narrow, so most outdoor kitchens are a single straight run along the boundary or rear wall. Plan the run in the order you cook: prepare, wash, cook, serve. That keeps raw food away from the serving end and stops people carrying hot pans past each other.
Whatever the shape, leave clear space in front of the grill and make sure the back door can open fully. An outdoor kitchen that blocks the only route to the washing line or the drain cover will be resented within a month.
A BBQ corner and a BBQ area are different sizes of the same idea. A BBQ corner is a counter beside the grill with space to prepare and serve. It needs a solid, heat-tolerant top, a non-combustible base if you cook on charcoal, task lighting, and shelter from the afternoon sun more than it needs plumbing. A BBQ area is a space for entertaining, usually inside a gazebo or pergola with seating, lights and a fan. Our gazebo guide prices an aluminium frame with a polycarbonate roof at RM6,000–RM15,000, and notes that add-ons such as seating, lighting, screens or a BBQ area can add RM3,000–RM12,000.
For either, put the grill where smoke can escape, away from the house windows and your neighbour’s, leave clear space in front of it, and check with the council before building a permanent roof attached to the house.
Standard indoor kitchen board does not belong outside. Melamine and particleboard swell as soon as water reaches an edge, and a back yard gets rain splash, hose water and humidity every day. The outdoor choice is between stainless steel, aluminium and a concrete base with metal doors.
| Cabinet build | Indicative price (2026, Klang Valley) | Outdoors |
|---|---|---|
| Stainless steel cabinet | RM650 – RM1,000 per ft run | The heavy-cooking and outdoor choice; wipes clean |
| Full aluminium (3G / 4G frame, powder-coated) | RM400 – RM700 per ft run | Waterproof and termite-proof; softer, dents more easily |
| Concrete base with metal doors | Quoted per job (wet works plus doors) | Immovable and quiet; the base itself cannot swell |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quotePrices are from our stainless steel vs aluminium cabinet guide. For a covered but still humid space, aluminium is the common value choice; where the cabinet sits close to the grill or takes daily hosing, stainless steel earns its higher price. Ask which grade of stainless is quoted, because cheaper grades can show rust spots near the sea or where cleaning chemicals sit.
An outdoor top has to handle a hot pan, direct sun and a monsoon. Our sintered stone guide recommends sintered stone for outdoor or balcony kitchen benches because it is UV-stable and weatherproof, and hot pans and woks do not scorch it. Granite is the traditional alternative. Quartz is a common indoor choice, but some colours can fade in direct sun.
| Top material | Price per foot run (2026) | Outdoor notes |
|---|---|---|
| Sintered stone | RM400 – RM900 | UV-stable; tolerates direct heat; thin panels can chip at an unsupported edge |
| Granite | RM200 – RM500 | Natural stone; needs periodic sealing |
| Stainless steel top | Part of a stainless cabinet quote | Heat-proof and hygienic; shows scratches |
| Tiled concrete counter | Quoted per job | Traditional and cheap to repair; grout lines need cleaning |
Most back-yard kitchens cook on LPG: a hob or wok burner fed from a cylinder. Charcoal is kept for satay and BBQ nights. Electric grills are the quiet option for a small patio. Each has a safety rule worth building the layout around.
If you want a fixed gas pipe rather than a cylinder beside the hob, treat it as a separate gas job with its own installer and paperwork, not as part of the carpentry.
A sink is what turns a BBQ corner into a real outdoor kitchen, and it is also where most problems start. The water supply is the easy part. The waste is harder: the outlet must run to a proper drain, and the pipe needs enough fall that water does not sit in it. Kitchen waste carries grease, and grease in an open back-yard drain means smell, blockages and pests.
Our garden pest control guide points out that an outdoor kitchen’s grease lines and the drains that carry kitchen waste water are among the features that turn a tidy compound into a pest problem. A strainer in the sink, a grease trap where cooking is heavy, and a drain cover that can be lifted for cleaning are cheap to include at the start and expensive to add later.
Outdoor sockets and lights sit in a wet, humid space, so they need weatherproof fittings and RCD protection, installed by a competent wireman. Plan the points early: a socket for a rice cooker or an electric grill, task lighting over the counter so you can see the food after dark, and a ceiling fan under the roof to move smoke and heat. Our outdoor lighting guide covers fittings that cope with rain and sun.
There is no single price, because an outdoor kitchen is several jobs put together. Build your estimate from the parts. For a gazebo-based BBQ area, our gazebo guide prices an aluminium frame with a polycarbonate roof at RM6,000 – RM15,000, and notes that add-ons such as seating, lighting, screens or a BBQ area can add RM3,000–RM12,000. Add the cabinets per ft run from the table above, the worktop per foot run, and the plumbing, drainage and electrical points your layout needs.
The pieces that most often push a quote up are the roof (and its approval), running a waste pipe to a distant drain, and moving an existing gas cylinder position. The pieces people forget are lighting, a fan and a lockable space for the cylinder.
In a condo, the balcony is not a back yard. Strata house rules commonly restrict open flames, charcoal and fixed gas on balconies, and any change to the façade or balcony floor goes through management. Read your by-laws and ask management in writing before planning a balcony kitchen; an electric grill and a small counter may be all that is allowed.
In terrace houses the issue is your neighbours. Smoke and cooking smells drift over the party wall. Put the grill at the end furthest from their windows, keep the roof open enough for smoke to lift, and talk to them before the first party rather than after it.
An outdoor kitchen is exactly the kind of job where several trades have to meet: roofing, cabinets, worktop, plumbing, drainage and electrical. ClickBina handles whole-house refurbishment and coordinates the trades, so the roof, counter, sink and points are planned together rather than one after another. WhatsApp us your job details for a quote: the size of the space, whether it is covered, and how you plan to cook. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free. See our house renovation page for the rest of what we do.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are typical Klang Valley market ranges for 2026, not fixed rates; your outdoor kitchen is priced after the space has been seen.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.