What granite costs per foot run and per square foot, and why two quotes for the same job can be far apart.
📍 We serve KL, Selangor & Putrajaya.

Granite in Malaysia is priced two ways: countertops per foot run, and floors per square foot. ClickBina's guides put a granite countertop at RM200 – RM500 per foot run supplied and installed, against RM250 – RM600 for quartz, and marble or granite flooring at RM30 – RM80+ per sq ft supplied and laid (indicative 2026, Klang Valley). The colour and origin of the slab, its finish, the edge profile and the number of cut-outs decide where in that range a job lands. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
| Where the granite goes | Indicative price | Source |
|---|---|---|
| Kitchen or vanity countertop, supplied and installed | RM200 – RM500 per ft run | Countertop repair guide |
| Floor, marble or granite, supplied and laid | RM30 – RM80+ per sq ft | Floor tile replacement cost guide |
| Car porch, marble or granite, supplied and laid | RM30 – RM80+ per sq ft | Car porch flooring guide |
| Quartz countertop, for comparison | RM250 – RM600 per ft run | Countertop repair guide |
| Sintered stone countertop, for comparison | RM400 – RM900 per ft run | Countertop repair guide |
| Solid surface countertop, for comparison | RM150 – RM350 per ft run | Countertop repair guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteThese are ranges, not a price list. Two kitchens with the same run of granite can sit at opposite ends of the countertop band because of the slab chosen and the work cut into it.
Twelve granite ideas for Malaysian homes, using the stones named on this page: absolute black, tan brown, kashmir white and gold, blue bahia and volga blue, plus granite on a car porch, a staircase and a dining floor. Each card is an illustrative concept render; filter by colour or by room, tap an image to enlarge it, and open the details for where it suits, the finish and what to watch.
12 designs shown
Illustrative concept design · Dark granite · Kitchen
Polished black granite with fine white specks around a gas burner and an undermount steel sink.
💬 WhatsApp us about this design
Wet and dry kitchen guide →Illustrative concept design · Dark granite · Kitchen
Dark brown granite with round reddish grains on a cream L-shaped kitchen.
💬 WhatsApp us about this design
Kitchen cabinet design styles →Illustrative concept design · Light granite · Kitchen
White granite with small maroon and grey specks over deep green doors with brass pulls.
💬 WhatsApp us about this design
Countertop chip, crack and stain repair →Illustrative concept design · Light granite · Bathroom
Golden beige granite with brown specks around a white undermount basin on a walnut vanity.
💬 WhatsApp us about this design
Bathroom vanity cabinet design →Illustrative concept design · Blue & colour · Kitchen
A vivid blue and white granite slab as the one feature in an all-white kitchen.
💬 WhatsApp us about this design
Kitchen island design ideas →Illustrative concept design · Blue & colour · Dining
Dark blue-grey granite with large shimmering crystals on a timber bar counter.
💬 WhatsApp us about this design
Bar counter cost →Illustrative concept design · Dark granite · Kitchen
Dark speckled granite tiles with grout lines on a wet-kitchen counter, with matching granite-look wall tiles.
💬 WhatsApp us about this design
Granite and marble slab fabrication →Illustrative concept design · Light granite · Kitchen
A matt black composite sink bowl under a light grey speckled granite top.
💬 WhatsApp us about this design
Kitchen sink and tap guide →Illustrative concept design · Floors & stairs · Entrance
Large textured grey granite slabs across an empty covered porch in front of the entrance doors.
💬 WhatsApp us about this design
Car porch flooring options →Illustrative concept design · Floors & stairs · Living room
Polished black granite treads and risers with fine white veining, under a black wall handrail.
💬 WhatsApp us about this design
Staircase tread cladding →Illustrative concept design · Floors & stairs · Dining
Large polished light grey granite tiles with fine black specks across a dining area.
💬 WhatsApp us about this design
Floor tile replacement cost →Illustrative concept design · Light granite · Kitchen
A grey speckled island top with a thick, rounded built-up front edge on a pale oak cabinet.
💬 WhatsApp us about this design
Granite and marble slab fabrication →These are illustrative concept designs created to show the options. They are not completed ClickBina projects. Prices are the ranges from the table on this page: per foot run for a kitchen or vanity top, and per sq ft for a granite floor. Bar counters, stairs and tiled counters are quoted by the job. We design and renovate kitchens. WhatsApp us your job details (where the granite goes, rough sizes and the colour you like) for a quote.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A foot run is measured along the front edge of the worktop at the standard depth. The rate normally covers the slab, templating, cutting, a standard polished edge, and fitting on your cabinets. Items often priced on top: a raised backsplash or upstand, a waterfall end that runs down to the floor, a deeper island top, undermount sink and hob cut-outs, and mitred thick-look edges. The granite and marble slab fabrication guide explains each of these steps and why templating after the cabinets are fixed matters.
Searches for a “granite price per sq ft” often mix up two different trades. Granite is quoted in the unit that matches the job, and the numbers cannot be swapped between them:
| Job | Quoted per | Indicative price | What the rate covers |
|---|---|---|---|
| Kitchen or vanity countertop | Foot run along the front edge | RM200 – RM500 per ft run | Slab, templating, cutting, a standard polished edge and fitting |
| Floor, granite or marble | Square foot | RM30 – RM80+ per sq ft | Supplied and laid |
| Car porch, granite or marble | Square foot | RM30 – RM80+ per sq ft | Supplied and laid |
For a countertop, the per-foot-run rate covers the slab together with templating, cutting, a standard polished edge and fitting. Prices for individual named colours are not quoted on this page because they vary by quarry, batch and supplier. Granite tiles laid on a concrete worktop are cheaper than a one-piece slab, which is covered under slab or tiles below.
Granite is sold under trade names such as Tan Brown, Absolute Black, Kashmir White, Kashmir Gold, Blue Bahia and Volga Blue. The name is only a starting point: stone from one quarry varies from block to block, and a small sample rarely shows the movement across a whole slab. For anything more than a small vanity top, ask to see the actual slab, or the slab number from the yard, before you pay the deposit. Rare colours cost more because fewer slabs exist, not because they perform better; for everyday use, a common dark granite is as durable as any.
Some worktops, especially in older wet kitchens, are made from granite tiles laid on a concrete top rather than one slab. Tiles are cheaper and easy to replace one by one, but the grout lines collect grease and water and never look like a solid top. A slab gives an unbroken surface with only one or two planned seams. If you are comparing quotes, check which one each quote is for; the difference explains much of the price gap.
| Material | Heat | Stains and sealing | Look |
|---|---|---|---|
| Granite | Handles hot pans well | Porous; needs periodic sealing | Natural, every slab different |
| Quartz (engineered stone) | Resin can scorch; use a trivet | Non-porous; no sealing | Even, consistent colour |
| Sintered stone | Tolerates direct heat | Non-porous | Printed patterns, including marble looks |
| Solid surface | Avoid hot pans | Repairable, can be re-sanded | Seamless joins |
The kitchen countertop guide compares these materials for Malaysian cooking, and the sintered stone guide explains the chipping risk on thin sintered edges. Granite's advantage is heat and a natural look; its cost is regular sealing.
On floors, granite is usually priced with marble as natural stone, at RM30 – RM80+ per sq ft supplied and laid on ClickBina's guides. Outdoors and on a car porch, a flamed or honed finish grips better than a polished one, which turns slippery when wet; the car porch flooring guide compares granite with tiles, pavers and concrete for that job. On stairs, each granite tread is cut to its step, and the staircase cladding guide covers nosings and grip. Compared with marble flooring, granite is harder and resists scratches and acids better.
A granite composite sink is not cut from a granite slab. The kitchen sink and tap guide lists them as quartz and resin, at RM400 – RM800 for a single bowl. They pair well with a granite or quartz top, but they are priced and cared for as a separate product.
Granite is porous, so oil, turmeric and red wine can soak in if the surface is not sealed. Most tops need resealing periodically; water that no longer beads on the surface is the sign. Chips at a sink edge can usually be filled; a crack running from a hob cut-out is a bigger job. The countertop chip, crack and stain repair guide explains when a repair is enough and when a section or the whole top has to be replaced. Replacing a top usually means removing the old stone, templating again and sometimes reconnecting the sink and hob.
Two quotes for the same kitchen are only comparable when they list the same stone, the same edge, the same upstand and the same cut-outs. A cheaper quote with a thinner slab, tiles instead of a slab, or cut-outs left off will look very different once the job is done.
WhatsApp us your job details for a quote: where the granite goes, rough sizes and your area. ClickBina makes custom cabinets and handles whole-house refurbishment and trade coordination, so the cabinets, the stone fabricator's templating, the plumbing and the tiling behind the top can be sequenced as one job. We reply within the hour, and the price agreed is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. See also custom cabinets.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each; prices for individual named colours are not quoted because they vary by quarry, batch and supplier.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.