Patterned & Moroccan Tiles Malaysia: Types, Sealing & Cost
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🧱 Tiles

Patterned & Moroccan Tiles
Encaustic, Printed Porcelain & Zellige-Style (2026)

Love the look of Moroccan tiles? Which material is behind the pattern, where it suits, how to seal and lay it, and what it costs.

📍 We serve KL, Selangor & Putrajaya.

Panel of blue and terracotta Moroccan patterned tiles framed by plain tiles in an entrance foyer

Moroccan floor tiles and other patterned tiles come in three very different materials: encaustic tiles with the pattern poured into a cement body, printed porcelain or ceramic tiles with the pattern in the glaze, and glossy zellige-style tiles. Encaustic tiles look the most authentic but are porous and must be sealed before and after grouting; printed porcelain gives the look with far less upkeep and suits wet floors. On ClickBina's guides porcelain is RM18 – RM35 per sq ft supplied and laid and ceramic RM10 – RM18 (indicative 2026, Klang Valley); patterned layouts add cutting labour on top.

What counts as a patterned or Moroccan tile

"Moroccan tiles" in Malaysian shops usually means a square tile with a geometric or floral pattern, often in blues, greens, terracotta and cream, that repeats across the floor or wall. "Patterned tiles" and "encaustic tiles" are used for the same look. The name tells you the pattern, not the material, and the material decides where the tile can go, how it is laid and how it ages.

ClickBina's tiles design gallery shows patterned floors as one of many looks and notes that patterned tiles vary too much by product to give one price. This guide explains the materials behind the look.

Three materials behind the same look

MaterialHow the pattern is madeStrengthsWeaknesses
Encaustic (cement-body) tileColoured pigment poured into a mould and pressed into a cement base; the pattern runs a few millimetres deepAuthentic, matt, wears into a patinaPorous; stains without sealing; heavy; colours vary by batch
Printed porcelainPattern printed into the glaze on a dense porcelain bodyLow absorption, easy to clean, suits wet floorsPattern is on the surface; repeats can look identical
Printed ceramicPattern printed on a ceramic wall or floor tileCheapest; huge range of patternsMore porous; walls and dry floors only
Zellige-style glazed tileGlossy, slightly uneven glaze, often a single colour laid in a patternLight-catching, handmade look on wallsSlippery as a floor; uneven edges need skilled laying

Most "Moroccan tiles" sold for Malaysian bathrooms and kitchens today are printed porcelain or ceramic. True encaustic tiles are imported and treated as a feature material.

Where each type suits

  • Wet floors (bathroom, wet kitchen, yard): printed porcelain with a suitable slip rating. Encaustic can work but needs sealing and resealing; zellige is too slippery.
  • Dry floors (entrance, dining, living): any of them. A patterned rug-like panel framed by plain tiles is the classic use.
  • Kitchen backsplash: printed ceramic or zellige-style; behind the hob, choose a glazed tile that wipes clean.
  • Shower walls: glazed porcelain or ceramic; encaustic on a shower wall needs a robust sealer and upkeep.
  • Outside: only tiles rated for outdoor use and frost-free sun; check the grade, not the pattern.

For floors, grip matters more than pattern. ClickBina's anti-slip tiles guide explains the R ratings to ask for in wet areas.

Sealing encaustic tiles

Encaustic tiles are porous until sealed. Unsealed, they soak up grout colour, oil, tea and even water marks. The usual sequence is:

  1. Lay the tiles on a flat bed and let them dry out fully.
  2. Apply a penetrating sealer before grouting, so the grout does not stain the tile face.
  3. Grout with a colour chosen to suit the lightest colour in the pattern, and clean the face promptly.
  4. Apply further sealer coats after grouting, as the sealer maker directs.
  5. Clean with a neutral cleaner; acidic or harsh cleaners strip the sealer and etch the surface.
  6. Reseal periodically, more often in kitchens and wet areas.

Printed porcelain needs none of this beyond normal grout care, which is the main reason it is the common choice for busy homes. The stone sealing guide explains how penetrating sealers work on porous surfaces.

Layout, batches and the pattern repeat

A patterned floor that is laid without a plan shows it at once: a half pattern at the door, a seam of cut tiles across the middle, a border that does not meet.

  • Dry-lay first: lay out a section without adhesive to check the pattern and the colour mix.
  • Centre the pattern on the room or the main view, so cut tiles sit at the edges.
  • Mix boxes: encaustic and handmade tiles vary between boxes; blend them as you go.
  • Order spares from one batch: patterned tiles are hard to match later if one cracks.
  • Plan borders and panels: a framed panel of pattern in a plain floor is easier to set out than wall-to-wall pattern.

The tiles design gallery warns that patterned layouts need more cutting and labour than a straight lay; ask for it as its own line on the quote.

Grout and joint colour

Joint colour changes the pattern. A grout that matches the lightest colour lets the pattern flow across joints; a dark grout outlines every tile and turns the floor into a grid. Thin, even joints suit printed porcelain; handmade zellige-style tiles need slightly wider joints to take up the irregular edges. In wet areas, ClickBina's grout types guide explains why epoxy grout resists stains and mould.

Using pattern without overwhelming the room

In small Malaysian condos, patterned tiles work best in one zone: an entrance, a powder room, one bathroom wall, a kitchen backsplash or a dining area panel. Whole floors of busy pattern make small rooms feel smaller. The Peranakan interior guide and the Mediterranean interior guide show how patterned tiles fit into those styles.

What patterned tiling costs

There is no single price for patterned tiles; it depends on the material and the product. These published supply-and-lay rates by tile grade are the nearest figures (indicative 2026, Klang Valley):

ItemIndicative priceSource guide
Ceramic tile, supply and layRM10 – RM18 per sq ftTiles design gallery
Porcelain tile, supply and layRM18 – RM35 per sq ftTiles design gallery
Mosaic, supply and layRM20 – RM45 per sq ftTiles design gallery
Hack and re-tile a floorRM12 – RM30 per sq ftPeranakan interior guide

Want this priced for your home?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Imported encaustic tiles usually cost more than printed porcelain to buy, and their sealing and the extra layout labour are separate lines. Hacking, levelling and waterproofing are also quoted separately.

How ClickBina can help

We do floor and wall tiling as part of renovation work, including patterned layouts and feature panels. WhatsApp us your job details for a quote: where the tiles go, the rough area, the tile type you are considering and what is on the surface now.

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina tiles design gallery — per-grade supply-and-lay prices and the patterned-layout labour note.
  • ClickBina Peranakan interior guide — hack and re-tile price, batch and centring advice.
  • ClickBina anti-slip tiles and grout types guides — grip and grout for wet areas.
  • Sealing and care steps described from general trade practice; follow the chosen sealer maker's instructions. No external source is quoted.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guide named beside it; they are indicative Klang Valley ranges for 2026, not fixed rates.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is the difference between encaustic and patterned porcelain tiles?
Encaustic tiles have the pattern poured into a cement body and must be sealed; patterned porcelain has the pattern printed in the glaze and needs no sealing.
Can Moroccan tiles be used on a bathroom floor?
Printed porcelain with a suitable slip rating, yes. Encaustic needs sealing and resealing; glossy zellige-style tiles are too slippery.
Do patterned tiles need sealing?
Encaustic tiles do, before and after grouting. Glazed porcelain and ceramic do not.
Are patterned tiles good for a kitchen backsplash?
Yes. Printed ceramic or zellige-style tiles wipe clean; choose glazed tiles behind the hob.
Why do patterned tiles cost more to lay?
The pattern must be set out, centred and cut so it lines up, which takes more time than a straight lay.
What grout colour suits patterned tiles?
A grout matching the lightest colour in the pattern lets the design flow; dark grout outlines each tile.
How much does porcelain tiling cost?
ClickBina's tiles design gallery puts porcelain at RM18–RM35 per sq ft supplied and laid (indicative 2026, Klang Valley).

Free Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote