Want a seamless concrete look without hacking your tiles? Here is when microcement works over existing tiles, why it cracks, and what to check before you agree to it.
📍 We serve KL, Selangor & Putrajaya.

Microcement is a thin, jointless cement-based coating that can go over firm existing tiles without hacking, but it is rigid: it cracks over hollow tiles, material junctions and anything that moves, and it relies on its sealer to resist water. Patches usually show. The site publishes RM900 – RM1,500 for a microcement-look accent wall; floors are priced on the surface underneath. Re-tiling instead costs RM12 – RM30 per sq ft plus hacking. WhatsApp ClickBina your job details for a quote; we reply within the hour.
Microcement is a thin, cement-based coating trowelled on in several layers to give a continuous, jointless surface on floors, walls, stairs and even furniture. It is sealed at the end, and the finish can be matt or with some sheen depending on the sealer. The look is the reason people want it: a smooth, concrete-like surface with no grout lines.
The reason contractors like to sell it is different: it goes on top of the existing surface. One European maker, Topciment, describes it building up to a thickness of 1 to 3 mm, so doors normally fitted with about 5 mm of clearance above the floor do not need planing. That makes it a no-hacking alternative to re-tiling, at least on paper.
Eleven ways to use microcement in a Malaysian home: jointless floors in living, kitchen and dining areas, a staircase, accent walls, and bathrooms where the sealer and the waterproofing underneath do the real work. Each card is an illustrative concept render; filter by surface or by room, tap an image to enlarge it, and open the details for where it suits, the finish and what to watch.
11 designs shown
Illustrative concept design · Floors · Living room
A jointless warm sand-greige floor with a soft cloudy texture across a condo living area.
💬 WhatsApp us about this design
Popped and hollow floor tiles →Illustrative concept design · Floors · Kitchen
Seamless light grey microcement over the dry kitchen floor, with no grout lines.
💬 WhatsApp us about this design
Tiling over existing tiles →Illustrative concept design · Walls · Living room
One living room wall in warm grey microcement with a soft mottled texture behind a low sofa.
💬 WhatsApp us about this design
Texture paint and decorative finishes →Illustrative concept design · Bathrooms · Bathroom
Seamless pale grey microcement on the walls around a walk-in shower, above a pale tiled floor.
💬 WhatsApp us about this design
Bathroom waterproofing →Illustrative concept design · Bathrooms · Bathroom
Taupe microcement walls and a recessed niche in a walk-in shower behind black-framed glass doors, above a pale tiled floor.
💬 WhatsApp us about this design
Bathroom makeover without hacking →Illustrative concept design · Floors · Living room
Seamless mid grey microcement on the treads and risers of a straight staircase, with a black wall handrail.
💬 WhatsApp us about this design
Staircase tread cladding →Illustrative concept design · Floors · Dining
An off-white jointless floor with faint cream clouding under a round timber dining table.
💬 WhatsApp us about this design
Dining room design ideas →Illustrative concept design · Floors · Entrance
Seamless charcoal microcement with a soft sheen in the entrance foyer.
💬 WhatsApp us about this design
Polished concrete floors compared →Illustrative concept design · Floors · Study
A jointless pale grey microcement floor through a small study with a timber desk by the window.
💬 WhatsApp us about this design
Study room design ideas →Illustrative concept design · Walls · Kitchen
A light beige microcement backsplash band above the dry kitchen counter, with one timber shelf.
💬 WhatsApp us about this design
Kitchen design ideas →Illustrative concept design · Bathrooms · Bathroom
A floating vanity slab with rounded edges coated in warm grey microcement, continuous with the wall, under a round vessel basin.
💬 WhatsApp us about this design
Bathroom makeover without hacking →These are illustrative concept designs created to show the options. They are not completed ClickBina projects. Only the accent-wall cards carry a price, the one microcement-look accent wall range from the cost table on this page; floors and bathrooms depend on the surface underneath and are quoted per job. We design and renovate homes. WhatsApp us your job details (the surface, the area and what is underneath now) for a quote.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Often, yes, but only over tiles that are sound. The same maker says it can be applied on tiles, avoiding removal of the original covering, as long as the tiles are firm and not loose, and that a fibre mesh is needed to bind the substrate. Its guidance adds that the surface must be level, consolidated, clean and with a humidity level of less than 5%.
That rules out a lot of Malaysian floors. Tiles that sound hollow when tapped are usually tiles whose mortar bed was never full, and the bond is already failing; see popped and hollow floor tiles. A coating a few millimetres thick cannot hold those tiles down. Before anyone quotes an overlay, every tile should be tap-tested and any hollow or cracked ones lifted and re-laid.
| Existing surface | Overlay suitable? | What has to happen first |
|---|---|---|
| Firm, well-bonded floor tiles | Usually | Clean, degrease, fill grout lines, fibre mesh |
| Hollow-sounding or cracked tiles | No, not over those tiles | Lift and re-lay on a full bed, then overlay |
| Terrazzo or marble in sound condition | Usually | Clean and prepare; check for cracks and movement |
| Fresh cement screed or render | Only once cured | The maker says mortar must set for at least four weeks |
| Timber, parquet or mixed materials that move differently | No | The maker says it cannot go on natural wood |
| Wall with an active damp source | No | Fix the source first; no finish survives damp |
Microcement is rigid, and rigid finishes show any movement underneath. The site’s decorative finishes guide puts it simply: applied over a substrate that is still settling, or across a junction between two different materials, rigid seamless finishes crack in a straight line. The common causes:
Microcement is porous. The maker’s own guidance is that a varnish or sealer is needed to protect it from dirt and to make the surface waterproof, and that only some of its systems are waterproof without that sealer. In other words, the sealer is doing the work, and sealers wear.
A bathroom still needs a proper waterproofing membrane under whatever finish goes on top. The decorative finishes guide is blunt: a wet-area wall needs a waterproofed, tiled or purpose-designed system, and a decorative coating is not one. If you want microcement in a shower, ask the applicator for the maker’s wet-area system in writing, and check how the bathroom waterproofing underneath will be done.
Walls are the easier job: less wear, less water, no furniture legs. Floors take foot traffic, grit, chair legs and mopping, so the base coats, mesh and sealer matter more, and the floor has to be left alone while it hardens. The maker says special care is needed in the first week after completion as the coating gains its full hardness.
| Walls | Floors | |
|---|---|---|
| Wear | Low | High: foot traffic, grit, furniture |
| What cracks it | Settling substrate, junctions between materials | Hollow tiles below, missing mesh, movement at the walls |
| Repair | A patch usually shows | A patch usually shows; a room is often redone |
| Time on site (maker’s guide) | Three to five days for a typical job | Up to one week |
This is the downside few sellers mention. The decorative finishes guide groups microcement with polished mineral and metallic finishes as the least forgiving: a localised repair almost always shows, and the honest answer is to re-do the wall corner to corner. On a floor, a dropped pot or a chipped edge is not a quick touch-up.
Think about where it goes. A hallway, a kitchen floor or a rental unit sees knocks and heavy use; a feature wall or a low-traffic bedroom floor is kinder to a finish that cannot be patched invisibly.
The site does not publish a microcement floor price, because it depends heavily on the condition of the floor underneath, how much preparation and mesh is needed, the system chosen and the area. What the site does publish:
| Item | Indicative cost (2026, Klang Valley) | Source guide |
|---|---|---|
| Venetian plaster or microcement look, one accent wall of roughly 80–120 sq ft | RM900 – RM1,500 | Decorative finishes guide |
| Internal skim coat to flatten a wall first | RM1.50 – RM4.00 per sq ft | Decorative finishes guide |
| Floor tiles, hack and re-tile (the alternative) | RM12 – RM30 per sq ft, plus RM1.50 – RM3 for hacking | Floor tile replacement guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a QuoteWhen comparing a microcement floor quote with re-tiling, compare like with like: the floor tile replacement cost guide includes hacking and debris disposal, while an overlay quote should include tile repairs, grout filling, mesh, the number of base and finish coats, and the sealer. For decorative walls, the texture paint and decorative finishes guide compares microcement with limewash and Venetian plaster.
Most people searching for a microcement flooring price in Malaysia want a per square foot figure. The site does not publish one, because a floor overlay is mostly preparation: tap-testing every tile, lifting and re-laying hollow ones on a full bed, filling the grout lines, laying fibre mesh, then the base coats, finish coats and sealer. Two floors of the same size can need very different amounts of that work.
A bathroom adds the waterproofing underneath and the maker’s wet-area system, because the sealer alone is not a membrane. The fairest way to judge a microcement quote is against the alternative it replaces: hacking and re-tiling at RM12 – RM30 per sq ft plus RM1.50 – RM3 for hacking. For a single feature wall, the published RM900 – RM1,500 accent-wall range is the reference point.
The maker recommends cleaning with water and neutral pH soap. Harsh or acidic cleaners attack the sealer, and once the sealer wears through, the porous coating underneath stains. Ask the applicator which sealer was used, and when and how it can be topped up, before the job is signed off.
Felt pads under chair and table legs, mats at entrances to catch grit, and wiping spills quickly all extend the life of the finish on a floor.
ClickBina is an experienced KL & Selangor contractor. We handle whole-house refurbishment and coordinate the trades.
WhatsApp us your job details for a quote. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. The price is flat, with no hidden charges, and we reply within the hour. ClickBina is SSM-registered.
Product behaviour is taken from the Topciment microcement product page (topciment.com), read in September of this year: application over tiles, mesh, thickness and door clearance, substrate humidity, curing of new mortar, drying time between sealer coats, time on site, first-week care, wet-area sealing and cleaning. It is one maker’s guidance, named for reference, not a product recommendation. Site figures come from the texture paint and decorative finishes guide (accent-wall cost, skim coat, cracking, patching, wet areas), the floor tile replacement guide (hack and re-tile rates) and the popped floor tiles guide (hollow tiles). Prices are typical Klang Valley market ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a QuoteTell us what you need — we reply within the hour.