Glass, ceramic, porcelain and stone mosaic, kitkat and hex tiles: where each suits, how sheets are laid, and what it costs.
📍 We serve KL, Selangor & Putrajaya.

Mosaic tiles are small tiles supplied on mesh-backed sheets, in glass, glazed ceramic, porcelain or natural stone, and in shapes such as squares, hexagons, penny rounds and the long thin "kitkat" finger tile. They suit shower floors, niches, backsplashes, feature strips and swimming pools, because the small pieces follow falls and curves and the many grout lines give grip underfoot. They cost more to lay than ordinary tiles: ClickBina's floor tile guide puts mosaic at RM20 – RM45 per sq ft supply and lay, against RM10 – RM18 per sq ft for ceramic (indicative 2026, Klang Valley).
A mosaic is any tile small enough that it is sold and laid as a sheet rather than piece by piece. The small pieces are held on a mesh or paper backing so a tiler can bed a whole sheet at once, then grout the joints between every piece. That is the difference that matters on site: a mosaic floor has far more grout line per square foot than a floor of ordinary tiles, which changes how it grips, how it is cleaned, and how long it takes to lay.
Shapes you will see in Klang Valley showrooms include plain squares, hexagons ("hex tile"), penny rounds, pebble shapes, arabesque and fish-scale patterns, and the long, narrow "kitkat" finger tiles that are popular on curved counters, arches and shower walls. Our tile design ideas page shows several of these as illustrative design concepts.
| Material | Look | Where it suits | Watch for |
|---|---|---|---|
| Glass mosaic | Bright, reflective, deep colour | Pools, shower walls, backsplashes, feature strips | Needs white adhesive and careful cutting; scratches on busy floors |
| Glazed ceramic mosaic | Flat colour, wide range, economical | Walls, niches, light-use areas | Softer body; check it is rated for floors before using it underfoot |
| Porcelain mosaic | Matt or glazed, dense body | Shower floors, wet kitchens, outdoor steps | Choose a matt or textured finish for a wet floor |
| Natural stone mosaic | Marble or travertine, soft natural tones | Feature walls, vanity walls, niches | Porous: must be sealed, and acidic cleaners etch it |
| Kitkat (finger) tiles | Long thin vertical lines | Curved counters, arches, columns, shower walls | Many joints to keep straight; slow to lay |
| Hexagon / penny round | Retro or classic pattern | Bathroom floors, entrance mats, backsplashes | Pattern must line up across sheet edges |
Mosaic is usually the wrong choice for a whole living room or a large condo floor. The extra labour and grout lines add cost and cleaning across a big area where a larger tile does the same job; our tile size guide covers how to match tile size to the room.
Owners often ask whether mosaic is slippery. The answer depends on the face of the tile, not the size alone. A matt porcelain mosaic with many joints grips well on a wet shower floor; a glossy glass mosaic on the same floor can be slippery and scratches under sand from shoes. For any wet floor, ask for the slip rating of the exact tile, as explained in our anti-slip tile guide.
The second point is the fall. A shower floor must drain towards the trap or linear drain. Mosaic follows a four-way fall to a centre trap neatly, which is one reason designers choose it there. It does not fix a screed that falls the wrong way: if the bed under the tiles holds water, the tiler has to correct the screed first.
Because a mosaic surface is mostly joints, the grout decides how it looks after a year. Cement grout is porous, so in a shower it darkens, stains and grows mould. Epoxy grout is non-porous and stays cleaner, which is why it is often specified for mosaic shower floors, pools and white glass mosaic. It costs more and needs a skilled tiler, because it sets quickly and is hard to clean off the face if left too long. Our grout types guide compares the options.
Grout colour matters more on mosaic than on any other tile. A contrasting grout makes the pattern stand out and shows every uneven joint; a matching grout hides small irregularities and makes the surface read as one colour.
These are ClickBina's published figures (indicative 2026, Klang Valley). Mosaic sits above ordinary tile grades because of the labour: more pieces, more joints, more care at edges and niches.
| Item | Indicative price | Source guide |
|---|---|---|
| Mosaic, supply and lay | RM20 – RM45 per sq ft | Floor tile cost guide |
| Ceramic, supply and lay (for comparison) | RM10 – RM18 per sq ft | Floor tile cost guide |
| Porcelain, supply and lay (for comparison) | RM18 – RM35 per sq ft | Floor tile cost guide |
| Hacking out an old floor only, including debris disposal | RM1.50 – RM3 per sq ft | Floor tile cost guide |
| Epoxy grout instead of normal grout | RM1 – RM3 per sq ft extra | Grout types guide |
| Regrouting a standard bathroom | RM300 – RM800 per bathroom | Grout types guide |
| Pool re-waterproofing, system only, before retiling | RM15 – RM30 per sq ft | Pool waterproofing guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteWhat moves a mosaic quote within the range: the material (glass and stone cost more than ceramic), whether the sheets are laid flat or around curves and niches, the grout type, and how much hacking and waterproofing come first. Glass mosaic in a pool is priced with the pool repair; our pool waterproofing guide explains why the waterproofing under pool tiles has to be right before any retiling.
Pool mosaic sits under water all the time and under chlorine, so it should be a glass or porcelain mosaic made for pools, laid in an adhesive and grout rated for immersion. Owners usually re-tile a pool for one of two reasons: tiles falling off, or a leak. Falling tiles often mean the bed has failed; a leak means the waterproofing under the tiles has failed. In both cases a cosmetic patch over the top does not last, and the area has to be opened up. Ceramic mosaic is the economical pool finish; glass mosaic in feature colours costs several times more.
| Problem | Usual cause | Fix |
|---|---|---|
| Sheet outlines visible as a grid | Sheets not aligned to the joints inside them | Lift and re-lay the worst sheets; prevention is care at laying |
| Grey patches behind glass | Grey adhesive or uneven adhesive coverage | Only re-laying fixes it; use white adhesive for glass |
| Pieces popping off | Poor adhesive coverage, movement, or water behind the tiles | Re-fix with fresh adhesive; check for leaks first |
| Dark, mouldy grout | Porous cement grout in a wet area | Rake out and regrout, or switch to epoxy grout |
| Hazy, dull surface | Grout or epoxy residue left to dry on the face | Specialist residue cleaner; prevention is washing down as you go |
| Uneven, lumpy surface | Substrate not flat before tiling | Level the substrate; small tiles show every bump |
Start with where it goes. For a wet floor, choose matt porcelain with a slip rating; for a shower wall, niche or backsplash, glass or glazed ceramic is fine; for a pool, a pool-rated glass or porcelain mosaic; for a feature wall, anything you like, including stone, as long as stone is sealed. Then choose the grout and its colour together with the tile, and keep the mosaic to the zones where its look and grip matter. If you are comparing tile grades for the rest of the house, our tiling contractor guide sets out how tiling is priced and what to ask a tiler.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, and tiling is part of our renovation work, together with the hacking, waterproofing and screed that come before it. WhatsApp us your job details for a quote: where the mosaic goes, the rough area, the type of mosaic and whether old tiles must come out. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.