An “anti-slip” label means little without the test behind it. Here is what the ratings measure and what to ask for in each wet area.
📍 We serve KL, Selangor & Putrajaya.

An R9 tile is the most slippery class on the R scale: the R rating (R9 to R13) comes from the German DIN 51130 ramp test, in which a tester in safety boots walks on an oiled sample, and R13 is the least slippery. The UK Health and Safety Executive warns that R9, and in some cases R10, floors will be slippery when wet or greasy. For barefoot areas such as bathrooms and pool surrounds, the more relevant scale is DIN 51097, graded A, B and C, where A, and often B, will be slippery when wet. So for a shower floor, porch or wet kitchen, look for R11 or a barefoot B/C rating, a textured or matt finish, and ask for the rating in writing.
Slips are among the most common causes of injury, and the HSE notes that most of them happen when a floor is contaminated with water, soap or grease. In a Malaysian home that means the bathroom, the wet kitchen, the car porch in a downpour and the balcony. A polished tile that feels fine when dry can be treacherous when wet, which is exactly when it matters.
Tile boxes and showrooms quote slip ratings, but the numbers come from different tests with different conditions. Understanding what each one measures is the difference between a safe floor and a floor that only looked safe on paper.
The R scale comes from DIN 51130, a German ramp test. A sample is laid on a ramp, coated with motor oil, and a tester wearing heavily cleated safety boots walks up and down while the ramp is tilted until they slip. The angle at which they slip sets the class: R9 slips at the lowest angle, R13 at the highest. In summary:
| Class | What it means | Notes |
|---|---|---|
| R9 | Most slippery class on the scale | HSE: will be slippery when wet or greasy |
| R10 | Low grip | HSE: in some instances slippery when wet; a very wide range |
| R11 | Medium grip | A common choice for wet floors |
| R12 | High grip | Commercial kitchens and similar |
| R13 | Highest grip | Industrial and heavily contaminated floors |
The HSE also points out that a single class can hide a wide range: R10 covers a coefficient of friction from 0.18 to 0.34, which is a very wide spread of slip potential. And because the test uses boots and oil, it says little about bare feet and soapy water.
DIN 51097 is the matching test for bare feet. The tester walks barefoot on a sample wetted with soap solution, and floors are graded A, B or C, with C the most slip-resistant. The HSE notes that floors graded A, and in many instances B, will be slippery when wet. For bathroom floors, shower areas and pool surrounds, where people are barefoot and there is soap, this scale is more relevant than the R number.
The HSE’s preferred method for real floors is the pendulum test, which swings a rubber slider across the surface and gives a pendulum test value (PTV). In the HSE’s table, a wet PTV of 36 or more means low slip potential; 25 to 35 is moderate, and below that is high. It can be done on site, dry and wet, which makes it useful for checking an existing floor rather than a sample in a lab.
The Wikipedia summary of slip testing adds a caution about another common number, the DCOF from the US A326.3 test: its own disclaimers say a minimum DCOF does not mean a floor is safe, and that the value should not be the only factor in choosing a floor.
| Area | What to look for | Notes |
|---|---|---|
| Shower floor and bathroom | R11, or barefoot B or C; matt or textured | Smaller tiles or mosaics add grout lines that help grip |
| Wet kitchen | R11 or higher | Grease makes a floor slipperier than water |
| Car porch | Textured outdoor tile or finish | Rain, tyres and algae; avoid polished tiles |
| Balcony and yard | Textured porcelain | Rain blows in; check the falls |
| Pool surround | Barefoot C | Wet and barefoot all the time |
| Stairs | Anti-slip nosing or textured treads | The edge is where slips start |
For porch finishes, our car porch flooring guide compares tiles, granite, pavers and concrete; for stairs, see our stair tread and nosing guide.
Most searches for an R9 tile, an R10 tile or “R10 vs R11 tiles” come down to one question: is this grade enough for the floor I have in mind? The short answer is that the higher the number, the more grip, and wet or barefoot floors need the top of the residential range.
| Rating | What it means | Where it fits |
|---|---|---|
| R9 tile | Most slippery class on the scale; the HSE says it will be slippery when wet or greasy | Dry indoor floors only; not a shower, wet kitchen or porch |
| R10 tile | Low grip, and a very wide range: R10 covers a coefficient of friction from 0.18 to 0.34 | Dry areas and floors that only get the odd splash; check the barefoot rating too |
| R11 tile | Medium grip; a common choice for wet floors | Shower and bathroom floors, wet kitchens, balconies; on a car porch, pick an R11 that is also textured |
R9 porcelain tile: “porcelain” describes the tile body and “R9” describes the surface grip, so the same porcelain range can come in a polished R9 face and a textured R11 face. Ask for the rating of the exact finish you are buying, not the range. Car porch tiles: rain, tyres and algae make a porch slippery, so use a textured outdoor tile, avoid polished faces and check the falls so water does not sit. Bathroom: R11, or a barefoot B or C rating, in a matt or textured finish.
The HSE warns that manufacturers’ ratings are usually measured on new, as-supplied tiles, and that slip resistance can change significantly after grouting, cleaning, burnishing or polishing, and after short periods of use. Soap film and the wrong cleaning product can make a good tile slippery; a polish or sealer can do the same. Clean with a product suited to the tile, rinse well, and avoid wax or glossy coatings on wet floors.
If the floor is already laid and slippery, the options are to change the cleaning routine, add anti-slip treatments or mats in the worst spots, or re-tile. In a toilet, an epoxy flake floor over the old tiles is another route; our epoxy flake versus re-tiling guide compares the two. For a new bathroom, choose the tile first and make sure the falls are right before anything else.
ClickBina guides publish these supply-and-lay rates (indicative 2026, Klang Valley). Anti-slip versions sit within the same families; the grade and finish decide where in the range you land:
| Item | Indicative price | Notes |
|---|---|---|
| Homogeneous (full-body) tile, supply & lay | RM15 – RM30 per sq ft | Heavy-traffic floors |
| Porcelain tile, supply & lay | RM18 – RM35 per sq ft | Wet and outdoor areas |
| Mosaic, supply & lay | RM20 – RM45 per sq ft | Labour-intensive; useful for shower floors |
| Hack and dispose of existing tiles | RM3–RM6 per sq ft | Added when re-tiling |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteOur floor tile replacement guide covers the full costs, including screeding and waterproofing under wet floors.
Changing a bathroom or porch floor usually means waterproofing, falls and drains as well as the tiles. ClickBina is an experienced KL & Selangor contractor that handles whole-house refurbishment and coordinates the trades on one job. WhatsApp us your job details for a quote: the area, the size and what is there now. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure is quoted unchanged from the ClickBina guides named above; they are typical Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.