No oiling and no termites, or the look of real timber? Here is how WPC composite and hardwood decks really compare in Malaysian sun and rain.
📍 We serve KL, Selangor & Putrajaya.

Timber decking in Chengal or Balau looks and feels natural but needs re-oiling; WPC (wood-plastic composite) decking does not rot, does not need oiling and termites do not eat it, which makes it the low-maintenance choice for Malaysian gardens, pool surrounds and balconies. Its weaknesses are heat in direct sun, thermal movement that needs expansion gaps, and a plastic look on cheaper boards. ClickBina’s decking cost guide prices basic-to-mid WPC at RM30–RM60 per sq ft installed and Balau at RM35–RM65, so the choice is less about price and more about upkeep, heat and look.
ClickBina’s timber decking cost guide describes WPC as a mixture of wood fibre and recycled plastic that is termite-immune and needs no oiling or staining. The market sells two broad grades:
Boards also come hollow (lighter, cheaper, with a visible cavity at the cut end that needs an end cap or trim) or solid (heavier, stiffer, better for heavy use). Ask which you are being quoted.
Quotes and shop listings use several names for the same wood-plastic board. “Composite decking”, “composite wood decking”, “WPC decking”, “timber composite decking” and “WPC timber decking” all describe WPC boards, sold in the basic (uncapped) or premium capped grades above. “Timber decking”, or a timber deck, should mean real hardwood boards such as Chengal, Balau or Merbau.
| Factor | Chengal / Balau hardwood | WPC composite | Premium capped composite |
|---|---|---|---|
| Termites | Good with treatment | Immune | Immune |
| Rot | Excellent (Chengal) to good (Balau) | Excellent | Excellent |
| Upkeep | Re-oil every 1–2 years | Annual clean | Annual clean |
| Wet slip | Medium, with grooves | Good when textured | Excellent |
| Heat in sun | Warm | Can get hot | Cooler in light colours |
| Look | Real timber that greys or can be oiled | Good imitation | Very good imitation |
The table follows the material comparison in ClickBina’s decking cost guide.
The same guide is blunt: dark-coloured WPC boards in direct sun can reach surface temperatures of 55–65°C at midday. That is too hot for bare feet around a pool. Choose lighter colours for sun-exposed decks, shade part of the deck with a pergola or umbrella, and prefer capped boards, which the guide rates as cooler underfoot than basic WPC. A timber deck in the same spot also warms up, but less sharply.
Plastic-rich boards grow and shrink with temperature. The decking guide says the substructure should allow 5–8 mm expansion gaps per 4 m run for thermal movement. Most composite systems use hidden clips that hold each board to the joists while letting it slide, and start and end clips at the edges. A deck laid tight, glued, or screwed without allowance will buckle or push against walls on the first hot week.
Whatever the boards, the frame decides how long the deck lasts. The decking guide notes that the substructure typically adds RM10–RM30 per sq ft, and that aluminium or steel frames cost more but are termite-immune and recommended for WPC or composite over poorly drained or termite-active ground. A termite-proof board on a timber frame that termites can eat is only half a solution.
On a concrete slab, balcony or rooftop, boards usually sit on a low frame or adjustable pedestals so water can drain beneath. On a waterproofed slab, the frame must not puncture the membrane.
A deck by a pool or in a shaded garden stays damp. Textured and capped boards grip better when wet; smooth or worn surfaces can be slippery, especially with algae. Clean the deck once or twice a year with a soft brush and a mild cleaner, clear leaves from the gaps so water drains, and keep planters on feet so the boards underneath can dry. Uncapped WPC in deep shade is the grade most likely to show mould spots.
| Location | Usually suits | Why |
|---|---|---|
| Pool or koi pond surround | Premium capped composite | Constant splash, no oiling, better wet grip |
| Sunny garden deck | Light-coloured capped composite or hardwood | Heat under bare feet |
| Shaded garden deck | Capped composite or hardwood | Damp and mould risk on uncapped boards |
| Condo balcony | Composite tiles or boards on pedestals | Light, removable, protects the membrane |
| Feature deck where look matters most | Chengal or Balau | Real timber character |
On a condo balcony, check the management’s rules before buying anything. Many buildings restrict what can be fixed to the balcony floor, and the balcony slab usually carries a waterproofing membrane that must not be drilled. Interlocking composite tiles or boards on adjustable pedestals can sit on the existing tiles, keep the drainage falls working and come up again when the balcony needs attention. On a landed home, the bigger questions are the ground underneath, the drainage around the deck, and whether the deck will sit against a house wall, where a gap for air and inspection keeps damp and termites away from the building.
Samples help more than brochures. Ask for real board offcuts, leave them outside in the sun for a few days, stand on them barefoot at midday, pour water on them and walk across in slippers. That simple test tells you more about heat, grip and colour than any catalogue page.
At installation, WPC and mid-range hardwood cost roughly the same per sq ft. The difference comes later: the decking guide says Chengal and Balau need re-oiling every 1–2 years to keep their colour, while WPC and composite need an annual clean only. If you are happy to let hardwood turn silver-grey, the oiling can be skipped; if you want it brown, budget for the oiling cycle.
WPC boards are termite-immune, but termites in the soil still look for timber in the frame, the house walls and anything stored under the deck. Keep the ground under a deck clear, well drained and ventilated, and if the house has had termites, deal with them first; our termite control guide covers treatment options.
These are the installed figures (supply and install) in ClickBina’s timber decking cost guide, indicative Klang Valley.
| Material | Per sq ft installed |
|---|---|
| WPC (basic to mid) | RM30–RM60 |
| Composite (premium capped) | RM50–RM100+ |
| Balau hardwood | RM35–RM65 |
| Chengal hardwood | RM50–RM90 |
| Merbau / Keruing | RM25–RM50 |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteHeight off the ground, the frame material, steps, edges, lighting and access are what move a decking quote. A site visit is free.
Decking is not one of ClickBina’s own listed trades, so WhatsApp us your job details for a quote: the area, what is underneath (soil, slab or balcony), sun or shade, and the look you want. We reply within the hour. When a deck is part of a garden, pool or outdoor makeover, ClickBina handles whole-house refurbishment and coordinates the trades on one job, with a flat price and no hidden charges. For other garden surfaces, see our garden path guide and artificial turf guide.
Pricing note: prices are indicative Klang Valley figures quoted from ClickBina’s timber decking cost guide; a deck is priced in writing after the site has been checked.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.