The one pest that eats your building — treated properly. Inspection first, then baiting, soil treatment or pre-construction protection matched to your home, with an honest read on warranty and cost.
📍 We serve KL, Selangor & Putrajaya.

Termites work out of sight, so by the time you see them the colony is usually well established. The classic Malaysian tell is the mud tube — a pencil-thick brown trail of soil the workers build up a wall, a pillar or a door frame to travel under cover. Others: timber that sounds hollow when you tap it, paint that bubbles or ripples over a skirting, a door or window frame that suddenly sticks, thin sawdust-like frass near wooden furniture, and the seasonal swarm of winged “kelkatu” that pours out around dusk after rain and then sheds a carpet of discarded wings on the floor. Any one of these means an active colony, not a passing visitor. Termites do not go away on their own and they do not slow down — every week you wait is more timber eaten, which is why an inspection at the first mud tube is the cheapest move you will make on this problem.
Treating termites correctly depends entirely on which kind you have, because they live and are killed differently:
| Type | How it lives | Tell-tale sign |
|---|---|---|
| Subterranean termites | Nest in the soil, travel up into the building for timber; need ground contact & moisture | Mud tubes; damage rising from the ground floor up |
| Drywood termites | Live entirely inside the timber, no soil contact needed | Small piles of hard, pellet-like frass below infested wood |
WhatsApp us your job details — we reply within the hour with a free quote.
A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.
💬 Get Your Free QuoteThe great majority of destructive Malaysian home infestations are subterranean termites — the soil-nesting kind that build mud tubes — which is why soil treatment and baiting, both aimed at the ground colony, are the mainstay treatments. Drywood termites, which infest furniture and roof timber without touching the soil, are handled differently, often by treating the affected timber directly. Getting the identification right at the inspection is what stops you paying for the wrong treatment.
Every honest termite job begins with an inspection, because the treatment plan and the price both hinge on what it finds. A technician traces the mud tubes back toward their source, checks the moisture-prone spots termites love — the bathroom and kitchen wet walls, the porch edge, the point where a timber frame meets the floor, the roof void — and works out where the colony is entering and how far the damage has spread. That determines whether you need corrective soil treatment, a baiting system, or direct timber treatment, and roughly how much material and labour it will take. Be wary of anyone who quotes a termite “package” over the phone without looking: the entry route and the extent are exactly what set the scope, and they cannot be guessed from a description.
There is no single “termite spray” that solves this — the method is chosen to match the termite type and the situation:
| Method | Best for | How it works |
|---|---|---|
| Baiting system | Eliminating the whole subterranean colony, ongoing protection | In-ground stations the termites feed on and carry back to the nest |
| Soil / corrective treatment | An existing home with an active subterranean problem | A treated soil zone around and under the building the termites cannot cross |
| Pre-construction soil treatment | New builds & extensions — prevention before the slab is poured | The ground is treated as the foundation goes in, creating a lasting barrier |
| Direct timber treatment | Localised drywood or furniture infestation | The affected timber itself is treated |
Many jobs combine methods — corrective soil treatment now to stop active damage, with a baiting system for long-term monitoring. The point of a professional is choosing the right combination for your building rather than applying whatever is in the van to every case.
A baiting system takes the fight to the colony rather than just guarding the building. Discreet stations are installed in the ground around the property; foraging termites find them, feed on the bait, and — crucially — carry it back and share it through the colony, which is how the whole nest, including the parts you can never reach, is brought down over time. Because it works through the termites’ own behaviour, baiting is slower than a knock-down spray but far more thorough, and the stations double as ongoing monitors that flag new activity early. The trade-off is that a baiting system is usually a higher up-front and monitored arrangement, typically with periodic checks. For a home with a recurring or extensive subterranean problem, that colony-elimination-plus-monitoring model is often the most durable answer — but it is a genuine choice against soil treatment, not automatically the “better” one for every house.
Soil, or “corrective,” treatment is the established way to deal with an active subterranean infestation in a house already built. A liquid termiticide is applied into the soil around the foundation, along the perimeter, and at the points where termites are entering — often by drilling small holes through the floor slab or along walls and injecting beneath — to create a continuous treated zone the termites cannot pass through to reach your timber. Done thoroughly, it both kills the workers passing through and blocks the colony’s access. The quality of a soil treatment lives entirely in its continuity: a barrier with gaps is a barrier the termites simply route around, which is why coverage and correct application matter far more than the brand of chemical, and why a rushed, cut-price soil job so often “fails” within a year.
The cheapest termite protection is the one applied before there is a house to protect. Pre-construction soil treatment — treating the ground as the foundation and slab go in, so the building sits on a protected zone from day one — is standard practice on new builds and worth insisting on for any extension or new landed home. On larger or higher-spec projects a reticulation (piping) system can be laid under the slab during construction so termiticide can be topped up through fixed pipes later without drilling — a neat option precisely because it is impossible to retrofit once the concrete is down. Pre-construction work is priced by the floor area treated rather than as a lump sum, which is why it is quoted per square foot. If you are building or extending, raise anti-termite treatment with your contractor before the slab — it is far cheaper here than any corrective treatment later.
Termite pricing depends on the method, the size of the building and how far the infestation has spread (market estimate 2026, indicative Klang Valley):
| Work | Indicative price | Notes |
|---|---|---|
| Termite inspection | Free – RM200 | Often waived if you proceed with treatment |
| Corrective soil treatment (existing home) | RM1,500 – RM4,000 | Depends on perimeter length & drilling needed |
| Baiting system (install + first-year monitoring) | RM2,500 – RM6,000 | Colony elimination plus ongoing station checks |
| Annual baiting renewal / monitoring | RM600 – RM1,500 per year | Keeps stations active after the first year |
| Pre-construction soil treatment | RM1.50 – RM3.50 per sq ft | New builds & extensions, priced by floor area |
Set any of these against the alternative — replacing eaten roof timber, door frames or built-in cabinetry — and early treatment is comfortably the cheaper path. A quote far below these ranges usually means a thin, partial barrier that will not hold.
Termite treatment for a house is not priced on the built-up area alone. Each method has its own basis:
So a 1,400 sq ft terrace with active termites is quoted on its perimeter and the extent of the infestation, not on 1,400 × a rate. Ask every quote to state the method, the treated perimeter or number of stations, and what the monitoring covers.
Termite treatments are commonly sold with a warranty period, and it is one of the most important things to get in writing — but read what it actually promises. A meaningful warranty should state its length, exactly what it covers (re-treatment if termites return? repair of new damage? which areas of the property?), what voids it (renovations that breach a soil barrier, water leaks that wash out treated soil, a missed monitoring visit), and whether it depends on paid annual renewals to stay valid. The questions to ask are straightforward: how long, covering what, and what would cancel it? A vague verbal “guarantee” is worth little; a written warranty with clear terms is worth a great deal. We would rather explain honestly what a warranty does and does not cover than quote an impressive-sounding number you cannot rely on when it matters.
Reaching for a can of insecticide when you find a mud tube is the natural reaction — and with termites it is genuinely counter-productive. A surface spray kills the handful of workers it hits and, worse, can make the colony “shy” away from that spot and simply re-route to another part of the building, so you lose the mud tube that was telling you where they were while the colony carries on eating elsewhere. It also disturbs the trail a professional would have used to trace the source. The hard truth is that you cannot spray your way to killing a subterranean colony nesting metres away in the soil — that needs a treated soil zone or a baiting system that reaches the nest. The best thing you can do when you find termites is leave the evidence alone and get it inspected, not paint over it.
What makes termites the pest worth taking seriously is where they eat: the parts of the house that hold it up and cost the most to replace. Roof timbers and trusses, door and window frames, staircase stringers, skirtings and built-in carpentry are all on the menu, and because termites hollow timber from the inside out, a beam can look sound right up until it fails. In a strata building the picture is shared — an infestation in the common structure or a neighbouring unit can find its way to yours, which is where the common-property responsibility of the JMB or MC comes in. For landlords, folding a periodic termite check into a maintenance routine catches it early, when treatment is cheap and no timber has yet been lost. The message is simple: with termites, the treatment is never the expensive part — the delayed treatment is.
ClickBina arranges termite treatment through a licensed pest control company across Kuala Lumpur and Selangor — a proper inspection first, then the method matched to your home, whether that is corrective soil treatment to stop active damage, a baiting system to eliminate the colony, or pre-construction protection for a new build — with an honest explanation of what any warranty actually covers rather than an impressive-sounding number. It is part of our full pest control service, so the same team that handles the termites in your roof can deal with the bed bugs in a rental or a cockroach problem in the kitchen — one WhatsApp thread, and the timber repairs termites sometimes leave behind. Send us your job details for the mud tube or the damaged timber and we reply within the hour with a plan matched to the problem and an honest read on how urgent it is. You can also scope the wider budget with our free cost tools.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we reply within the hour.