Walls and pipes open for the renovation? That is the cheapest time to close the ways pests get in.
📍 We serve KL, Selangor & Putrajaya.

A renovation is the cheapest moment to keep pests out, because the walls, floors and pipes are already open: seal every pipe and cable penetration, close the gaps behind cabinets and skirting, fit door seals and screens, and keep drains and floor traps covered. Leave weep holes and vents open but screened, since they exist to drain water or move air. For reference, ClickBina's guides put compression seals on a door at RM30 – RM100 per door and rodent proofing alone at RM150 – RM600 (indicative 2026, Klang Valley).
Cockroaches, ants, rats, lizards and mosquitoes get into a house through gaps that are almost always hidden once the house is finished: behind the kitchen plinth, around the pipe that goes through the wall, under a door, around an aircon hole. During a renovation many of those gaps are exposed. Closing them then costs a little sealant and a few minutes; closing them later can mean pulling out cabinets.
ClickBina's pest control services guide sums up prevention as denying pests food, water, entry and shelter. Food and water are housekeeping. Entry and shelter are building details, and a renovation is when you can fix them for good.
| Entry point | Pests that use it | What to do during the renovation |
|---|---|---|
| Pipe and cable holes through walls and floors | Cockroaches, ants, rats | Seal around every penetration on both faces |
| Gap under the kitchen plinth and behind base units | Cockroaches, ants | Close the plinth, seal the back edge and service holes |
| Floor traps and open drains | Cockroaches, drain flies | Fit covers that close, keep traps holding water |
| Gap under doors | Lizards, rats, snakes, insects | Door sweep or compression seal |
| Aircon and cable holes | Lizards, ants, insects | Seal round the pipe after the unit is installed |
| Unscreened windows and vents | Mosquitoes, lizards | Insect screens on windows you open; mesh on vents |
| Gaps where ceiling meets wall, or around downlights | Lizards, insects | Seal or fill before painting |
| Weep holes and drainage openings | Insects, occasionally small lizards | Keep open; fit a weep vent or mesh, never seal shut |
The cicak control guide lists almost the same points for lizards: the gap under doors, loose louvre windows, open aircon and cable holes, unscreened vents and gaps where the ceiling meets the wall.
Every pipe or cable that passes through a wall or floor leaves a ring of gap unless it is sealed. Plumbers and electricians often make the hole bigger than the pipe to fit it easily, then move on. Before walls are plastered, tiled or boarded, walk round and check every penetration:
Seal the gap on both sides with a filler that suits the location: mortar or a suitable sealant around rigid pipes in masonry, and a flexible sealant where the pipe will move or heat up. Where a pipe passes through a wet area, the sealing has to work with the waterproofing, not cut through it.
The kitchen is where cockroaches and ants live, and the space behind and under base units is their favourite shelter: dark, warm and close to food and water. During a kitchen renovation:
A cabinet that is easy to wipe out and has no gaps behind it is the most effective long-term pest control a kitchen can have.
Floor traps are a direct route from the drain into the room. A trap that dries out, or a cover that does not close, lets cockroaches and smells in. ClickBina's guide to cockroaches coming out of floor traps explains the fixes. During a bathroom or kitchen renovation, choose traps with covers that close, make sure every trap holds water, and cover any open drain outside the kitchen door.
The gap under an external door is enough for a lizard, a young rat or a snake. ClickBina's snake and monitor lizard guide recommends sealing gaps under doors, at typically RM30 – RM100 a door. Kitchen and yard doors are the priority.
For windows you actually open, insect screens keep mosquitoes and lizards out without closing the house up. ClickBina's mosquito net cost guide puts installation at roughly RM80 – RM350 per window and RM250 – RM900 per door, and it is easiest to measure and fit them while new frames are going in.
Some openings are there on purpose. Weep holes in window frames and in some walls let trapped water drain out; vents in bathrooms and roof spaces move air. Sealing them to keep insects out causes water to back up and damp to build, which is worse than the insects. The right answer is a weep vent, insect guard or fine mesh that keeps the opening working while blocking pests. Check new window frames after installation to make sure the weep holes have not been blocked by sealant or plaster.
These are ClickBina's published ranges (indicative 2026, Klang Valley). Sealing penetrations and cabinet gaps during a renovation is usually part of the trades' work, so it has no separate figure.
| Item | Indicative price | Source guide |
|---|---|---|
| Compression seal or sweep on a door | RM30 – RM100 per door | Snake and monitor lizard guide |
| Rodent proofing only | RM150 – RM600 | Rat and rodent control guide |
| Insect screen on a window | RM80 – RM350 per window | Mosquito net cost guide |
| Insect screen on a door | RM250 – RM900 per door | Mosquito net cost guide |
| Pre-construction soil treatment for an extension | RM1.50 – RM3.50 per sq ft | Pre-construction anti-termite guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteIf you are building an extension, the ground under the new slab can only be treated before the concrete goes in. ClickBina's pre-construction anti-termite guide explains why that window closes for the life of the building once the slab is cast.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so pest-proofing details can be written into the renovation scope and checked before the walls are closed. Pest treatment itself is carried out by a pest control company. WhatsApp us your job details for a quote: the rooms being renovated and the pests you have seen. We reply within the hour, the price we agree is a flat price with no hidden charges, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.