Nako Windows Malaysia: Replacement Options & Costs 2026
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🪟 Windows · Replacement

Nako Windows
Replacement Options, Ventilation and Costs (2026)

Leaky, rattling or insecure louvre windows? Here is what to replace a nako window with, how to keep the ventilation a bathroom or kitchen needs, and what the new windows cost.

📍 We serve KL, Selangor & Putrajaya.

Old nako louvre window with rusted clips in a terrace house kitchen wall

Old nako windows (louvre windows) should be replaced with a window that still opens: a top-hung window in a bathroom, a casement or sliding window in a bedroom, or a new, better-made louvre in a kitchen. That keeps the natural ventilation the by-laws expect while fixing leaks, dust and security. Indicative Klang Valley ranges for 2026 are RM250 – RM600 per aluminium casement panel, RM200 – RM500 per aluminium sliding panel and RM500 – RM1,200 per uPVC casement panel. WhatsApp ClickBina your job details for a quote; we reply within the hour.

What a nako (louvre) window is

A nako window, also called a louvre or jalousie window, is a frame holding a stack of narrow glass blades in metal clips. A handle tilts all the blades together, like a Venetian blind made of glass. The doors and windows guide sums up its place in Malaysian homes: excellent ventilation, less secure, and traditional in Malaysian terrace houses, especially in kitchens, bathrooms and service areas.

Many older terrace houses and flats still have their original nako windows. They are often not broken, just tired: blades that no longer close tight, clips that have rusted, and a gap that lets in dust, insects and wind-driven rain.

Nako windows: pros and cons

Nako windows stayed popular in Malaysian kitchens and bathrooms for one reason, and most of the complaints about them follow from the same design: a stack of glass blades that overlap but never seal.

ProsCons
Excellent ventilation, even with the blades only partly openLess secure: loose blades can be slid out of worn clips
Lets steam and cooking smoke out of kitchens, bathrooms and service areasDriving rain, dust and insects get through even when the window is shut
The traditional window in older terrace houses and flats, so it matches the original lookAir-conditioned air leaks out and traffic noise comes in through the gaps
Blades tilt together with one handleRusted clips and stiff operators; many narrow blades to clean

If ventilation is the main job of the window, a new, better-made louvre can still be the right answer in a kitchen or service yard. Where security, rain or aircon matter more, a window that seals and locks usually wins; the next sections cover both.

Why owners replace nako windows

  • Security. Loose glass blades can be slid out of worn clips, and the doors and windows guide rates louvres less secure than other windows.
  • Rain and dust. The blades overlap but do not seal, so driving rain and dust come through even when the window is shut.
  • Aircon and noise. A room that is being air-conditioned loses cool air through the gaps, and traffic noise comes in the same way.
  • Worn hardware. Rusted clips and stiff operators make the window hard to open and close, and a loose blade can fall.
  • Cleaning. Many narrow blades mean many edges to clean.

Before replacing, it is worth asking whether the problem is the window or the frame around it. The window repair guide puts the rule simply: the decision is made by the frame, not by the fault. A sound frame can often take new hardware; a corroded one is a replacement.

Keep the ventilation the by-laws expect

The reason nako windows were fitted in kitchens and bathrooms is airflow, and the Uniform Building By-Laws 1984 (UBBL) still expect it. By-law 39 in the consolidated text published by KPKT says every room used for residential or business purposes must have natural lighting and ventilation through windows with a total area of not less than 10 percent of the room’s clear floor area, and not less than half of that must be openable so that air can pass through freely.

For bathrooms and toilets the same by-law asks for openings of not less than 0.2 square metre per water closet or bathroom, through which air can pass freely. That text is a model by-law, and your state’s UBBL is the one that applies, but the practical lesson holds: do not replace a bathroom or kitchen nako with fixed glass. Choose a replacement that still opens, and keep the opening area.

What to replace a nako window with

ReplacementHow it opensSuitsTrade-off
Top-hung (awning) windowHinged at the top, opens outwardBathrooms, laundry; can stay open in light rainSmaller opening than a louvre of the same size
Casement windowHinged at the side, swings outBedrooms, kitchens, wider openingsNeeds clear space outside to swing; grille must allow it to open
Sliding windowPanels slide sidewaysWide openings where nothing can swingOnly about half the frame opens at a time
New aluminium louvreTilting blades in a new frameKitchens and service yards that need maximum ventilationStill less secure and less weathertight than a hinged window
Fixed glass with an openable sectionOne part fixed, one part hinged or slidingLarge openingsThe openable part must still give enough airflow

For a kitchen or service yard the doors and windows guide still recommends a louvre for maximum ventilation and steam release, so replacing a kitchen nako with a new, better-made louvre is a reasonable choice. In a bathroom, a top-hung window gives airflow while keeping most rain out.

What the replacement windows cost

Indicative Klang Valley ranges for 2026, quoted unchanged from the doors and windows guide:

ItemIndicative cost
Aluminium casement window (per panel, standard size)RM250 – RM600
Aluminium sliding window (per panel)RM200 – RM500
uPVC casement window (per panel)RM500 – RM1,200
Security grille, powder-coated mild steel (per window)RM200 – RM600
Invisible / stainless mesh grille (per window)RM500 – RM1,200

Get a quote for this job

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a Quote
Flat price, no hidden chargesA renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go aheadExperienced KL & Selangor contractor

Removing the old frame, making good the plaster around the opening and repainting are usually separate lines. The window count, their sizes, the floor level and access all change the price.

Bathroom and kitchen windows

Bathrooms and kitchens are where most nako windows sit, and where the choice matters most. Steam and cooking smoke need somewhere to go, and a window that is kept shut because it leaks or rattles does not ventilate at all. Frosted or patterned glass keeps privacy in a bathroom without giving up the opening.

If the room has an exhaust fan, the window still matters: the by-law rule is about natural ventilation. For wet-area damp that has already marked the walls, look at the source first; a new window will not dry out a wall that is wet from a leaking pipe or failed waterproofing.

Frame, glass and hardware to specify

  • Frame thickness. The doors and windows guide recommends specifying a minimum 1.2 mm frame wall thickness for aluminium windows, and 1.4–2.0 mm for larger openings or high-wind exposure.
  • Frame material. Aluminium is the usual choice; uPVC costs more and seals better.
  • Glass. Frosted or patterned for bathrooms, clear or tinted elsewhere. Ask for the glass type in writing.
  • Hardware. Friction stays, handles and locks are often priced separately by cheaper suppliers.
  • Colour. Match the rest of the house, or the building’s approved colour in a strata scheme.

Sealing and drainage: fitting it so it does not leak

A new window is only as dry as its installation. Window frames must be sealed with a flexible sealant at the perimeter to prevent water ingress, one of the most common causes of wall dampness in Malaysian homes. At the same time, the frame has to drain: the window repair guide warns never to let anybody run sealant across the bottom of the outer frame, because that blocks the weep holes.

If an old opening already leaks around the frame, sort out the cause as part of the replacement; the window leak repair guide explains how to tell a frame leak from a wall leak.

Grilles and security

Replacing a nako window improves security by itself, because hinged and sliding windows lock and have no loose blades. Many owners add a grille at the same time. The doors and windows guide notes that at least one quick-release emergency grille per floor is needed for fire escape under UBBL and local authority rules, so plan which window that will be. Casement windows that open outward need a grille that still lets them open; see invisible grilles for an option that sits inside the frame line.

Flats and condos: approval first

In a strata building the outside face of the window is part of the elevation. The window repair guide notes that any change to the appearance of the elevation, including a different frame colour or a new grille, is normally a permit matter under the house rules. Ask the management office for the approved window design and colour before ordering, and check strata renovation rules for working hours and deposits.

What the quotation should list

  1. Each window by room, with its measured size and the replacement type.
  2. Frame material, profile and wall thickness, and the finish colour.
  3. Glass type for each window (clear, tinted, frosted).
  4. Hardware: stays, handles and locks.
  5. Removal and disposal of the old nako frame and blades.
  6. Perimeter sealing, making good the plaster and any repainting.
  7. Grilles, if included, and which one is the quick-release emergency grille.
  8. For a strata unit: who obtains management approval.

How ClickBina quotes nako window replacement

ClickBina is an experienced KL & Selangor contractor. We handle whole-house refurbishment and coordinate the trades.

WhatsApp us your job details for a quote. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. The price is flat, with no hidden charges, and we reply within the hour. ClickBina is SSM-registered.

Sources & methodology

Prices and specification points are quoted unchanged from the site’s doors and windows guide (window types, indicative price table, frame thickness, perimeter sealing and emergency grilles). Repair versus replace, drainage and strata points come from the window repair guide. The ventilation rule is by-law 39 of the Uniform Building By-Laws 1984 (KPKT consolidated text), which is a model by-law; your state’s UBBL applies. Prices are typical Klang Valley ranges for 2026, not fixed rates; the final price depends on the number and size of windows and access, confirmed on site.

Ready to price your job?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a Quote
Flat price, no hidden chargesA renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go aheadExperienced KL & Selangor contractor

Common Questions

How much does it cost to replace a nako window in Malaysia?
Indicative Klang Valley ranges for 2026 from the doors and windows guide: an aluminium casement window costs RM250 – RM600 per panel, an aluminium sliding window RM200 – RM500 per panel and a uPVC casement window RM500 – RM1,200 per panel. Removal and making good are usually extra.
What should replace a bathroom nako window?
A window that still opens. A top-hung (awning) window suits bathrooms because it can stay open in light rain. Avoid fixed glass: the by-laws expect bathrooms to have openings for natural ventilation.
Can I replace a nako window with fixed glass?
Not in a bathroom, toilet or kitchen that relies on the window for ventilation. By-law 39 of the UBBL model text asks for openable windows in rooms and openings in bathrooms; check your state’s by-laws.
Why do nako windows leak and let in dust?
The glass blades overlap but do not seal, and old clips and operators wear loose, so driving rain, dust and insects get through even when the window is closed.
Are nako windows a security risk?
They are rated less secure than other windows, because loose blades can be removed from their clips. Hinged or sliding windows that lock, with a grille where needed, are more secure.
Do I need approval to change windows in a condo or flat?
Usually yes. Changing the appearance of the elevation, including a different frame colour or a new grille, is normally a permit matter under the house rules. Ask management first.
Can ClickBina quote nako window replacement?
WhatsApp us your job details for a quote. We handle whole-house refurbishment and coordinate the trades. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead, and we reply within the hour.
What is a nako window?
A nako window, also called a louvre or jalousie window, is a frame holding a stack of narrow glass blades in metal clips that tilt together with one handle. It is common in the kitchens, bathrooms and service areas of older Malaysian terrace houses and flats.
Are nako windows good?
They ventilate very well, which is why they suit kitchens and bathrooms. But the blades do not seal and can be slid out of worn clips, so nako windows let in rain, dust and noise and are rated less secure than hinged or sliding windows.

Get a Free Quote

Tell us what you need — we reply within the hour.