Woven diamond-mesh fencing for land, courts and back boundaries: how it is built, what to specify and what drives the price.
📍 We serve KL, Selangor & Putrajaya.

A chain link fence is a woven mesh of galvanised or PVC-coated steel wire in a diamond pattern, stretched between steel posts; it is also called a cyclone fence. It suits long boundaries, empty land, sports courts and back fences where you want a clear view and a low cost per metre, but it is easy to climb and cut, so it is a boundary marker rather than a security barrier. No ClickBina guide publishes a chain link price; for comparison, ClickBina's fencing guide lists galvanised BRC welded mesh at RM80 – RM150 per linear metre installed (indicative 2026, Klang Valley).
Chain link is made by weaving zig-zag steel wires into each other so they lock into a diamond pattern. The mesh comes in rolls, is unrolled along the line, stretched tight and tied to steel posts set in concrete. Because it is woven rather than welded, the mesh can flex and follow ground that rises and falls, which is why it is common on long rural boundaries, school fields, factory compounds, empty plots and courts.
In Malaysian shops the same product is sold as chain link, cyclone fence, diamond mesh or simply wire mesh fence. It is a different product from BRC, the welded square mesh panels that ClickBina's fencing cost guide prices for house boundaries.
| Point | Chain link (woven) | BRC (welded panels) |
|---|---|---|
| How it is made | Wires woven into a diamond mesh, sold in rolls | Wires welded into rigid panels with a rolled top edge |
| Uneven or sloping ground | Follows the ground; easier on long, uneven runs | Panels step down slopes in stages |
| Look | Utilitarian, industrial | Neater, more finished on a house boundary |
| Stiffness | Needs tension wires or a top rail to stay tight | Rigid between posts |
| Climbing and cutting | Easy to climb and cut | Also climbable; tighter anti-climb mesh is harder |
| Typical use | Land, courts, factories, back boundaries | Terrace and semi-D side and rear boundaries |
For a house, BRC or a grille usually looks tidier. Chain link earns its place on long, uneven or out-of-sight runs, and on courts where a ball-stopping mesh is needed.
ClickBina's fencing guide makes the same point for other fences: hollow mild steel posts in direct soil contact rust from the inside out, so posts set in concrete with a sloped top are the norm.
Chain link is specified by two things: how thick the wire is (the gauge) and how big the diamond openings are. In the gauge system a lower number means a thicker, stronger wire, which is easy to get backwards when comparing quotes. Smaller openings are stiffer and harder to get a foot or hand into; larger openings use less wire and cost less. When comparing quotes, ask each supplier to write down the wire gauge, whether that is measured before or after coating, the opening size, the coating type and the post size, so you compare like with like rather than a thin cheap mesh against a heavy one.
| Part | What it does | What to check |
|---|---|---|
| Line posts | Hold the mesh along the run | Spacing, post size, set in concrete |
| End, corner and gate posts | Take the pull of the stretched mesh | Heavier than line posts, with braces |
| Top rail or top tension wire | Keeps the top edge straight | A rail is stiffer; a wire is cheaper |
| Bottom tension wire or kerb | Stops the bottom edge being pushed or dug under | A concrete kerb stops dogs and gaps |
| Tension bars and ties | Fix the mesh to posts and rails | Galvanised or coated, enough of them |
A fence that sags after a year usually had end posts that were too light, too few ties or no proper tensioning. For keeping dogs in or strays out, the bottom edge matters more than the mesh, as our stray cat and dog proofing guide explains.
A chain link gate is a welded steel frame with the same mesh fixed inside it, hung on a heavier gate post. Single swing gates suit pedestrians; double swing or sliding gates suit vehicles on land and factory compounds. Ask for a frame that is braced so it does not drop at the latch side, hinges that can be adjusted, a latch or drop bolt that can take a padlock, and a gate post set deeper than the line posts. On a house frontage, most owners prefer a proper main gate; see the main gate design guide for options.
Chain link is still a fence, so local authority by-laws apply. ClickBina's fencing guide sets out that most local authorities (DBKL, MBPJ, MBSA) allow a front boundary fence of 1.5 m – 1.8 m without a special permit, and that open grille or mesh fencing is usually exempt up to 1.8–2.0 m, while solid walls above 1.5 m typically need a building plan. Open chain link mesh falls on the easier side of those rules, but each council sets its own, so check before ordering a tall fence. In strata and gated schemes, the management's rules on boundary fencing also apply.
No ClickBina guide publishes a chain link price, because wire gauge, coating, height, post spacing and the ground all move it. These are the published comparison figures for other fence types, and the add-on for taking out an old fence (indicative 2026, Klang Valley).
| Item | Indicative price | Source guide |
|---|---|---|
| Galvanised BRC welded mesh fence (comparison) | RM80 – RM150 per linear metre | Fencing cost guide |
| Mild steel grille fence (comparison) | RM150 – RM350 per linear metre | Fencing cost guide |
| Aluminium pressed-panel fence (comparison) | RM200 – RM400 per linear metre | Fencing cost guide |
| Removing an old fence and debris | RM15 – RM40 per metre | Stray cat and dog proofing guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteWhat moves a chain link quote: total length (long runs spread the fixed costs), height, wire gauge and coating, how many corners and gates there are, post spacing, whether a concrete kerb runs along the bottom, and access to the site for digging post holes.
Chain link keeps out casual trespassers and stray animals and marks the line clearly, but the diamond openings give hand and foot holds and the wire can be cut. If security is the goal, owners usually raise the boundary wall, choose a tighter anti-climb mesh, or add an electric fence on top of a solid wall; our electric fence guide covers that option and its safety rules. Lighting and an alarm do more against break-ins than a taller mesh.
WhatsApp us your job details for a quote: your area, the type of site, the rough length, the height you want, whether you need a gate and whether an old fence has to come out. ClickBina is an experienced KL & Selangor contractor and coordinates the trades for whole-house work, so boundary walls, kerbs, gates and fencing can be planned as one job. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026. Chain link fencing itself is quoted per job.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.