A few stained or sagging boards? What one sheet really costs, which size you need, and when a swap stops making sense.
📍 We serve KL, Selangor & Putrajaya.

There is no single ceiling board price per sheet in Malaysia: a sheet of plain gypsum (“siling kapur”) costs less than a moisture-resistant, calcium silicate or PVC board, and thickness and brand move the price again. ClickBina's guides do not publish a shop price per sheet, because what you actually pay for is the board fitted, jointed and painted. The published installed figures are a patch and repaint at RM400 – RM1,200, a sagging section re-supported and re-boarded at RM500 – RM1,500, and a whole flat ceiling replaced at RM10 – RM17 per sq ft (indicative 2026, Klang Valley).
In Malaysian shops and on contractor quotes, “siling kapur” covers several different boards. In older terraces and flats it often means the small flat boards laid in a visible grid, which can be lifted out and replaced one at a time. In newer homes it usually means large gypsum plasterboard sheets screwed to a frame, taped and skimmed so the joints disappear. Both are “plaster ceilings” to most owners, but they are bought, cut and replaced in very different ways.
Before asking for a price per sheet, work out which one you have. Look for straight lines in a regular grid across the ceiling: if the boards sit on a visible metal or timber grid, you have a tile-type ceiling. If the ceiling is one smooth surface with no lines, it is jointed plasterboard, and a single “sheet” cannot be swapped without cutting, taping and repainting around it.
The size question matters because a replacement board has to fit the gap exactly. The common sizes you will meet are set by the grid or the sheet, not by the shop:
| Board or grid | Size | Where you see it |
|---|---|---|
| Grid tile, the “2x4” board | About 2 ft by 4 ft | Older flat ceilings in terraces and flats; a wet board this size can weigh several kilograms |
| Exposed T-bar grid module | 600 x 600 mm or 600 x 1,200 mm | Offices, shops, some kitchens and service areas |
| Full plasterboard sheet (European norm) | 120 cm wide, most commonly 240 cm long | Smooth jointed ceilings, cut to fit on site |
| Plasterboard thickness | 9.5 to 25 mm across the range | Thicker boards for higher strength, fire or sound needs |
Shops may also sell square boards for older ceilings. Whatever the label, measure an existing board edge to edge and check its thickness before buying, because older ceilings were not always built to today's sizes. ClickBina's false ceiling cost guide explains how T-bar grids are laid out and supported.
A smooth ceiling with no visible lines is built from full plasterboard sheets, most commonly 120 cm wide and 240 cm long, screwed to a frame, then taped and skimmed. When you ask for plasterboard for a ceiling, give the shop or contractor four details:
Fitted, a new flat gypsum ceiling is RM8 – RM12 per sq ft on ClickBina's guides (indicative 2026, Klang Valley).
The board type is the biggest single difference between two sheet prices. Relative to each other:
| Board | Relative sheet price | Suits | Watch for |
|---|---|---|---|
| Plain gypsum (siling kapur) | Lowest | Bedrooms, living rooms, dry areas | Softens and sags once it gets wet |
| Moisture-resistant gypsum | Higher than plain gypsum | Kitchens and humid rooms | Resists damp air, not a leak |
| Calcium silicate or cement board | Higher again | Wet kitchens, bathrooms, porches, eaves | Heavier; cutting makes fine dust |
| PVC ceiling panel | Priced per panel or strip | Bathrooms, yards, porches | Joints show; a different look from plaster |
ClickBina's board comparison guide goes deeper into how each material behaves, and the bathroom ceiling board guide covers wet rooms.
Because all of these change from shop to shop and month to month, a per-sheet price you are quoted only means something once you know the material, thickness and size it refers to. Ask for all three in writing.
A 2x4 ceiling board is a grid tile of about 2 ft by 4 ft, the size used in many older flat ceilings. Its shop price follows the same drivers as any sheet: the material (plain gypsum is the cheapest; moisture-resistant, calcium silicate and PVC cost more), the thickness, the face finish and the brand. Buying one or two tiles from a shop also costs more per tile than a bundle for a whole room. This page does not print a per-tile shop price, because none is published on ClickBina's guides.
For most owners the tile is the smallest part of the bill. A small repair is mostly the visit, the setup and the repaint, and a new tile often looks brighter than its neighbours, so the whole grid is often repainted at the same time. Before buying, measure an existing tile edge to edge and check its thickness: older ceilings were not always built to today's sizes. If the house is old, have the boards checked for asbestos before anyone lifts one out.
Replacing only the damaged boards is usually far cheaper than a new ceiling. ClickBina's ceiling replacement guide sets the line at roughly a third of the surface: below that, replacing the affected panels alone makes sense. How the swap works depends on the ceiling:
A new grid tile often looks brighter than its neighbours, so many owners repaint the whole grid ceiling at the same time. On a jointed ceiling, the taping, skimming and painting are most of the work, not the board.
Some older Malaysian homes still have asbestos-cement ceiling sheets, often in the same flat grid as other boards. If yours might, do not cut, drill, break or sand them, and do not lift them out yourself. Have them identified first. ClickBina's asbestos roof sheet guide explains what to look for and why careful removal matters.
These are the published ClickBina figures for fitted work, which is what most owners actually need priced (indicative 2026, Klang Valley):
| Job | Indicative price | Source guide |
|---|---|---|
| Hairline or joint crack repair, per area | RM150 – RM400 | Ceiling repair guide |
| Patch and repaint, including after a leak | RM400 – RM1,200 | Ceiling repair guide |
| Sagging section re-supported and re-boarded | RM500 – RM1,500 | Ceiling repair guide |
| Fan or fixture point reinforced to the slab | RM150 – RM480 per point | Ceiling repair guide |
| Whole flat ceiling replaced (remove and refit) | RM10 – RM17 per sq ft | Ceiling repair guide |
| New flat gypsum ceiling | RM8 – RM12 per sq ft | Ceiling replacement guide |
| Cement or calcium silicate board ceiling | RM8 – RM12 per sq ft | Ceiling replacement guide |
| PVC ceiling | RM8 – RM12 per sq ft | Ceiling replacement guide |
| Hacking and disposing of an old plaster or asbestos ceiling | RM2 – RM5 per sq ft | Plaster ceiling cost guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteA small repair is mostly the visit, the setup and the repaint, not the board itself, which is why batching several damaged areas into one visit is the cheapest way to buy this work.
If the ceiling is sagging now, keep people out from under it and read ClickBina's guide to why ceilings fall before anyone climbs up.
Buying a few boards and fitting them yourself can work on a dry grid ceiling where a tile simply lifts out and the new one is the same size. It is a poor idea on a jointed ceiling, where the cutting, taping and skimming decide whether the repair shows, and on anything that might be asbestos. Working overhead on a ladder, with dust falling, is also where most DIY ceiling jobs go wrong.
Old downlight and fan holes are a related small job: ClickBina's guide to patching ceiling holes shows how a backing piece and a board patch are fitted.
We do plaster ceiling work as part of renovation and repair: replacing damaged boards, re-supporting sagging sections, patching and repainting, and replacing whole ceilings when patching no longer makes sense. WhatsApp us your job details for a quote: your area, the property type, the room, roughly how many boards are damaged and whether the area is still wet.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates. No per-sheet shop price is printed because none is published on ClickBina's guides.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.