A ridge at the joints, a dome in the middle, a soft bubble? Find the cause before anyone re-lays a single plank.
📍 We serve KL, Selangor & Putrajaya.

An SPC floor that lifts, peaks at the joints or domes in the middle has almost always run out of room to move, or is sitting on a floor that is wet or uneven. The usual culprits are a missing expansion gap at the walls, strong sun heating the planks, moisture coming up from the slab, a wavy subfloor, or two layers of underlay. Find the cause before anyone re-lays planks: cutting back the edges fixes a tight floor, but a damp slab will lift a new floor too. ClickBina's guides put click-lock installation labour at RM1.50 – RM2.50 per sq ft (indicative 2026, Klang Valley).
SPC (stone-plastic composite) is a rigid plank that is usually laid as a floating floor: the planks click to each other, not to the slab, and the whole floor sits loose on an underlay. That is why it can go down over old tiles in a day, and it is also why it can lift. When a floating floor has no room to move, or the base under it changes, the stress comes out at its weakest point.
Most lifting has one of five causes. Match what you see before deciding on a fix.
| What you see | Most likely cause | Check this first |
|---|---|---|
| Floor domes in the middle, tight against the walls | No expansion gap, or the gap filled by skirting, grout or a door frame | Lift a skirting and look for a gap at the wall |
| Lifting in the afternoon near a big window, flat in the morning | Heat cycling from direct sun on the planks | Which way the window faces and whether there are blinds |
| Lifting with a musty smell or dark marks at the edges | Moisture from the slab or water through the joints | Ground floor, rising damp, a nearby wet area |
| Joints click loose and drum along one walking line | Uneven subfloor under the planks | Straightedge across the floor in several directions |
| Whole floor feels spongy and joints peak | Two layers of underlay | Whether the planks had underlay attached and a sheet was also laid |
| Soft bubbles on a glued floor | Adhesive failure, often from moisture below | Is it glue-down, and is the slab damp? |
SPC is more stable than laminate, but it still moves with temperature. ClickBina's vinyl and SPC cost guide says to leave a 6–10 mm gap at all fixed edges and cover it with skirting or quarter-round trim. Its SPC supply-and-install guide names the missing gap as the mistake it gets called out to: a floor jammed against the walls has nowhere to go and lifts in the middle, and that is almost always a rushed install rather than a bad product.
The gap can also be lost after installation. Skirting nailed down through the planks, a door frame or a kitchen plinth set on top of the floor, grout or silicone run into the edge, or heavy built-in furniture standing on the planks all pin a floating floor. Once pinned, it cannot expand and it buckles somewhere else.
A room with a big west-facing window and no blinds puts the floor through a heat cycle every afternoon. The SPC guide warns that direct, sustained sun on a rigid plank floor is heat cycling, and heat cycling is what opens gaps at the ends of planks. The same room can peak in the afternoon and gap in the morning.
Blinds, curtains or window film cut the heat that reaches the floor. If the floor was laid with no gap, shading alone will not fix it, but it stops a correctly laid floor being pushed to its limit.
SPC is water-resistant, not a waterproofing system. The SPC guide explains that in bathrooms, wet kitchens and areas with a floor trap, water gets through the joints to the slab and stays there, and you get smell and mould rather than a swollen floor. The vinyl cost guide adds that moisture rising from below the slab can cause adhesive failure or mould between the subfloor and the planks.
Ground-floor rooms on a slab-on-ground are the ones at risk. If a wall darkens in the monsoon or the room smells musty, deal with that first; ClickBina's rising damp guide covers the diagnosis. Re-laying planks over a damp slab only buries the problem again.
A rigid plank bridges small hollows, but it does not correct a floor. The vinyl cost guide says any high spots over 3 mm in a 1.8 m radius will cause click-lock joints to separate or create hollow sounds underfoot. The planks flex every time someone walks the same line, and the joints work loose and can peak.
The other hidden cause is underlay. The SPC guide says underlay is either pre-attached to the plank or laid as a separate sheet, not both, because doubling up makes the floor spongy and stresses the joints. Check the plank backing before blaming the product.
Some SPC and vinyl floors are fully glued to the slab instead of floating. They do not dome in the same way; instead, a patch lets go and forms a soft bubble. The usual reason is moisture below the adhesive or a dusty, poorly prepared slab. The vinyl cost guide notes that peel-and-stick tiles are not recommended for permanent use in Malaysia's heat because the adhesive can fail.
A glued floor is harder to repair, because planks cannot simply be unclicked and lifted. That is one reason the SPC guide calls floating the default for homes.
| Cause | Usual fix | Notes |
|---|---|---|
| Floor tight at the walls | Remove skirting, cut back the plank edges to restore the gap, refit the trim | The floor often settles flat once freed |
| Floor pinned by fixtures | Release the fixture or cut the floor around it with a gap | Fixtures stand on the slab, not the floor |
| Heat from a window | Shade the window; restore the gap if it is missing | Shading alone will not free a pinned floor |
| Uneven subfloor | Lift the planks, level the slab, re-lay | Planks can often be re-used if undamaged |
| Doubled underlay | Lift the planks, remove the extra sheet, re-lay | Same planks, one underlay |
| Damp slab or wet area | Fix the moisture source first, then decide on the floor | SPC should not go in wet areas |
| Glue-down bubble | Cut out and re-bond or replace the affected planks | Only once the slab is dry |
Because a click-lock floating floor can be lifted plank by plank, the SPC guide notes that a damaged plank can be swapped without disturbing the rest, which is why keeping a spare box matters.
These are ClickBina's published SPC ranges (indicative 2026, Klang Valley). A fix that only frees the edges costs far less than one that needs the floor lifted and the slab levelled.
| Item | Indicative price | Source guide |
|---|---|---|
| Click-lock floating installation (labour) | RM1.50 – RM2.50 per sq ft | SPC flooring guide |
| Levelling compound, if needed | RM2 – RM5 per sq ft | SPC flooring guide |
| Hacking out existing tiles | RM1.50 – RM3 per sq ft | SPC flooring guide |
| Mid-range SPC, supplied and installed | RM7 – RM13 per sq ft | SPC flooring guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteIf new planks are needed and your spare box has run out, a new batch may not match exactly, so re-lay whole rooms rather than patches where you can.
WhatsApp us your job details for a quote: which room, when the floor lifts, whether it is a floating or glued floor, whether it is on the ground floor, and whether you have spare planks. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, and supplies and installs interior finishes by budget and use case. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates.