Real Klang Valley price ranges for day curtains, blackout curtains, roller blinds and venetian blinds — supply and installation.
📍 We serve KL, Selangor & Putrajaya.

Indicative Klang Valley ranges for 2026 — actual cost depends on fabric choice, window dimensions and track system. Get an exact quote on WhatsApp.
Window treatment pricing in the Klang Valley depends on three things: the type of treatment (curtains, blinds or dual-layer), the fabric or slat material, and whether the track or headrail is manual or motorised. Here are realistic 2026 all-in ranges (fabric, track/pole and installation):
| Treatment type | Cost per window (installed) | Whole unit (10 windows) |
|---|---|---|
| Roller blinds (economy) | RM80 – RM180 | RM800 – RM1,800 |
| Roller blinds (blackout, branded) | RM180 – RM400 | RM1,800 – RM4,000 |
| Day curtains (sheer / voile) | RM120 – RM300 | RM1,200 – RM3,000 |
| Blackout curtains (double-layer) | RM300 – RM700 | RM3,000 – RM7,000 |
| Venetian / aluminium blinds | RM120 – RM280 | RM1,200 – RM2,800 |
| Motorised roller blinds | RM500 – RM1,200 | RM5,000 – RM12,000 |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteTwelve window treatments for Malaysian condos and landed homes: sheer, layered, linen and velvet curtains, a recessed ceiling track, roller, blackout, zebra and roman blinds, roller blinds for a balcony door, wooden venetians and a pleated honeycomb blind. Each card is an illustrative concept render; filter by type or by room, tap an image to enlarge it, and open the details for where it suits, the finish and what to watch.
12 designs shown
Illustrative concept design · Curtains · Living room
Floor-length white sheer curtains on a slim rod near the ceiling, sunlight softened through the folds.
💬 WhatsApp us about this design
Curtain track installation →Illustrative concept design · Curtains · Master bedroom
Taupe lined curtains tied back at both sides under a pelmet box, with a white sheer layer behind.
💬 WhatsApp us about this design
Curtain track installation →Illustrative concept design · Curtains · Dining
Oatmeal linen-blend curtains on a black rod either side of a large dining window.
💬 WhatsApp us about this design
Curtain cleaning →Illustrative concept design · Curtains · Living room
Floor-length deep green velvet curtains with a soft sheen either side of a tall window.
💬 WhatsApp us about this design
Curtain cleaning →Illustrative concept design · Roller, zebra & roman · Study
Light grey roller blinds half down over a three-panel study window.
💬 WhatsApp us about this design
Zebra vs roller blinds →Illustrative concept design · Roller, zebra & roman · Bedroom
A navy blackout roller blind lowered most of the way, keeping the bedroom dim.
💬 WhatsApp us about this design
Zebra vs roller blinds →Illustrative concept design · Roller, zebra & roman · Dining · Living room
Beige and cream bands of sheer and solid fabric, half lowered over a condo window.
💬 WhatsApp us about this design
Zebra vs roller blinds →Illustrative concept design · Roller, zebra & roman · Bedroom
A blue and white striped roman blind raised halfway, its soft folds stacked at the top.
💬 WhatsApp us about this design
Bedroom design ideas →Illustrative concept design · Venetian, vertical & pleated · Study
Warm honey timber slats lowered over most of a study window, slat shadows on the side wall.
💬 WhatsApp us about this design
Office blinds and window film →Illustrative concept design · Roller, zebra & roman · Balcony · Living room
Light fabric roller blinds over each panel of a wide glass sliding door to a balcony.
💬 WhatsApp us about this design
Balcony design ideas →Illustrative concept design · Venetian, vertical & pleated · Bedroom · Master bedroom
A soft white cellular blind with fine pleat lines lowered most of the way over a bedroom window.
💬 WhatsApp us about this design
Office blinds and window film →Illustrative concept design · Curtains · Living room
Grey curtains and sheers hanging from a track recessed into the ceiling along a full-height window wall.
💬 WhatsApp us about this design
Smart curtain motorisation →These are illustrative concept designs created to show the options. They are not completed ClickBina projects. Prices, where shown, are the per-window installed ranges from the cost tables on this page; layered and blackout curtains, blackout rollers, roman blinds and the balcony door blinds are priced per window from the fabric and track you choose. WhatsApp us your job details (which rooms, how many windows and the look you like) for a quote.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Curtains are priced primarily by fabric type, fabric usage (in running metres) and the track or pole system. The most common configurations in Klang Valley homes are:
| Curtain type | Fabric cost/metre | Full window (2.5 m drop) cost |
|---|---|---|
| Sheer / day curtain (voile) | RM15 – RM45/m | RM120 – RM300 |
| Mid-weight cotton / linen blend | RM45 – RM120/m | RM300 – RM600 |
| Blackout curtain (single layer) | RM60 – RM150/m | RM350 – RM700 |
| Double-layer (day + blackout combo) | RM80 – RM200/m combined | RM500 – RM1,000 |
| Premium velvet / jacquard | RM150 – RM400/m | RM800 – RM2,000 |
Track systems (curtain rods, ceiling-mounted tracks) add RM30–RM120 per window for standard manual systems; ceiling-recessed silent glide tracks add RM80–RM200 per window.
Blinds are generally more compact than curtains, easier to maintain and better suited to smaller or awkwardly shaped windows. Here is a breakdown of the main types popular in Malaysia:
| Blind type | Cost per window (installed) | Key benefit |
|---|---|---|
| Roller blind (non-blackout) | RM80 – RM180 | Clean look; easy to raise fully |
| Roller blind (blackout) | RM180 – RM350 | Full light block for bedrooms |
| Aluminium venetian blind | RM120 – RM250 | Adjustable light and privacy |
| Wooden venetian blind | RM200 – RM450 | Warm natural aesthetic |
| Vertical blind (fabric) | RM150 – RM350 | Suited to wide sliding doors |
| Zebra / day-night blind | RM180 – RM380 | Dual opacity zones; modern look |
| Pleated / honeycomb blind | RM250 – RM600 | Best insulation; energy-efficient |
Motorised window treatments have become mainstream in Malaysian mid-to-premium new launches and renovations over the past three years. A motorised system replaces the manual pull-cord or wand with a quiet DC motor, operated by remote, smartphone app or voice assistant (Google Home / Amazon Alexa).
The premium over manual systems is significant (3–5 times the cost per window) but increasingly justified in open-plan living areas, floor-to-ceiling windows and homes with smart home ecosystems already in place.
See also window tinting cost → as a complementary heat-control measure alongside blinds and curtains.
| Room | Best choice | Why |
|---|---|---|
| Master bedroom | Blackout curtain (double layer) or blackout roller blind | Full light block for sleep quality |
| Living / dining room | Day curtain + blackout layer, or zebra blind | Control between sheer ambience and full block |
| Children’s bedroom | Blackout roller blind | Durable, easy clean, full blackout |
| Study / home office | Venetian or roller blind | Precision light control; minimal fabric dust |
| Bathroom | Waterproof roller blind or aluminium venetian | Moisture-resistant; easy wipe-clean |
| Kitchen | Roller blind (wipe-clean fabric) | Easy to clean; no fabric near cooker |
An illustrative window treatment budget for a 3-bedroom condo (10 windows) in the Klang Valley — a planning guide, not a quote:
| Window | Treatment | Qty | Indicative cost |
|---|---|---|---|
| Living room (floor-to-ceiling, 3 m wide) | Sheer day curtain + blackout layer | 1 set | RM1,400 |
| Dining (standard, 1.5 m wide) | Zebra blind | 1 | RM280 |
| Master bedroom (1.8 m wide) | Blackout curtain, double layer | 1 set | RM700 |
| 2nd bedroom (1.5 m wide) | Blackout roller blind | 1 | RM280 |
| 3rd bedroom / study (1.5 m wide) | Roller blind | 1 | RM160 |
| 2 × bathrooms (small) | Waterproof roller blind | 2 | RM260 |
| Kitchen window | Wipe-clean roller blind | 1 | RM130 |
| Track installation (all rooms) | Ceiling-mount manual tracks | — | RM500 |
| Total | — | 8 windows | ~RM3,710 |
Upgrading the living room and master bedroom to motorised tracks would add RM2,500–RM4,000 to the total. Downgrading all fabric to economy and using standard roller blinds throughout could reduce this to RM1,800–RM2,200.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteTell us what you need — we reply within the hour.