Renovation Cost Calculator Malaysia: RM50-RM220 per sq ft
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📐 Free Calculator

Renovation Cost Calculator
Malaysia (2026)

How much will your renovation cost? Get an instant budget estimate by area, property type and finish level — using real Klang Valley 2026 rates. Free, no sign-up.

📍 We serve KL, Selangor & Putrajaya.

Contractor measuring an empty living room with a laser meter to estimate a renovation

Estimate your renovation budget

How it works

This calculator multiplies your built-up area by the typical Klang Valley rate per square foot for your chosen scope — roughly RM50–90/sq ft for a light refresh, RM90–150 for full mid-range, and RM150–220+ for premium — with a small adjustment for landed properties. It gives a budgeting range; wet areas (kitchen, bathrooms) push you toward the higher end. See the full method in our cost per sq ft guide → and full renovation cost guide →.

Renovating a condo? See the condo renovation cost guide →. Want the exact number? WhatsApp us your floor plan for an itemised quote.

Indicative 2026 Klang Valley ranges — actual cost depends on materials, layout changes and finishes. Not a fixed quote.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does renovation cost in Malaysia?
It depends on area, property type and finish level. As a guide: roughly RM50–90 per sq ft for a light refresh, RM90–150 for full mid-range, and RM150–220+ for premium. This calculator multiplies your built-up area by the rate for your scope.
How do I estimate my renovation budget?
Enter your built-up area, property type and finish level, and the calculator gives an indicative budget range using real Klang Valley rates. For an exact figure, request an itemised quote.
Does the estimate include furniture and appliances?
No — it covers the renovation works (hacking, flooring, ceiling, painting, basic electrical and finishes). Loose furniture, appliances and air-conditioning units are usually budgeted separately.
Why is my small unit's estimate relatively high?
Kitchens and bathrooms cost far more per square foot than bedrooms, so compact units with multiple wet areas sit toward the higher end of the range.
Is the renovation calculator free?
Yes, completely free with no sign-up. It is an indicative estimate — WhatsApp us your floor plan for a precise itemised quote.

Need a Real Quote?

WhatsApp us your property details — free quote within the hour.

WhatsApp ClickBina← All Tools
💬 Get Your Free Quote