Bathroom Renovation Cost Calculator Malaysia (2026)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🛀 Free Calculator

Bathroom Renovation
Cost Calculator

Estimate a bathroom renovation budget in seconds — pick the finish level, enter how many bathrooms, then add the extras that move the price most. Indicative 2026 Klang Valley ranges from our bathroom renovation cost guide, shown as a range, never a fake exact figure.

📍 We serve KL, Selangor & Putrajaya.

Tiler laying new wall tiles in a stripped condominium bathroom during a renovation

Bathroom renovation estimator

The toilet drain is cast into the slab. Keep it where it is if you can — moving it means core-drilling.

The premium level already assumes large-format tiles, so this option applies to basic and mid-range only.

The mid-range level already includes a water heater.

How this estimate works

Bathroom renovation in the Klang Valley is budgeted per bathroom, so the calculator starts from the range for the level you pick and multiplies it by the number of bathrooms. A basic refresh — re-tiling with a new toilet, basin, tap and shower set — is RM6,000–RM10,000 per bathroom. A mid-range remodel with a full re-tile, proper waterproofing, a vanity, a glass screen and a water heater is RM12,000–RM18,000. A premium bathroom with large-format tiles, a rain shower, a custom vanity and a feature wall is RM20,000–RM35,000+, and the plus sign stays because the top end is open.

Three extras are added only when they apply, because they are the lines that surprise people most. Moving the toilet or the floor trap means core-drilling through the slab and adds RM2,000–RM5,000 for each bathroom where it happens. Switching from standard tiles to large-format or imported tiles adds RM2,000–RM5,000. On the basic level, an instant water heater adds RM300–RM600 installed; the mid-range level already includes one.

Every figure comes from our bathroom renovation cost guide. The one line we would never cut is waterproofing: a cheap membrane is the most common reason a bathroom leaks into the unit below. When you have a range you are comfortable with, WhatsApp ClickBina photos of the bathroom and rough measurements. When the bathroom is part of a whole-house refurbishment, we coordinate the trades — tiling, plumbing, waterproofing and fittings — under one flat price with no hidden charges; for a bathroom-only job, WhatsApp us your job details for a quote. A site visit is free.

The formula

Estimate = level range × number of bathrooms + RM2,000–RM5,000 × bathrooms where the toilet or floor trap moves + RM2,000–RM5,000 × bathrooms (tile upgrade, basic or mid-range) + RM300–RM600 × bathrooms (instant heater, basic level only). Low ends and high ends are added separately, so the answer stays a range.

What moves the price

FactorHow it changes your quote
Level of finishBasic keeps the layout and swaps the fittings; mid-range adds waterproofing, a vanity and a glass screen; premium changes the whole look.
Hacking or overlayHacking the old tiles down to the substrate costs more than tiling over, but it is the only way to renew the waterproofing properly.
Moving pointsKeeping the toilet, floor trap and shower where they are is the biggest single saving in a bathroom renovation.
Tile size and brandLarge-format and imported tiles cost more to buy and to lay, and need a flatter wall.
SanitarywareA budget toilet and basin suit a rental; a mid-range brand makes sense in a bathroom you will use for a long time.
WaterproofingA full membrane with a proper wall turn-up protects the unit below. Skimping here is the most expensive saving you can make.

Indicative estimate only, not a quotation — final pricing after we see photos or the site.

Get a quote for your job

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesSSM-registeredExperienced KL & Selangor contractor

Common Questions

How much does a bathroom renovation cost in Malaysia?
Indicative 2026 Klang Valley ranges per bathroom are RM6,000–RM10,000 for a basic refresh, RM12,000–RM18,000 for a mid-range remodel with waterproofing, vanity, glass screen and water heater, and RM20,000–RM35,000+ for a premium bathroom. Multiply by the number of bathrooms.
How much extra is it to move the toilet?
Moving the toilet or floor trap means core-drilling through the slab and typically adds RM2,000–RM5,000 per bathroom. Working with the existing position is the simplest way to keep the budget down.
Is waterproofing included in the bathroom renovation price?
In the mid-range and premium levels it is part of the scope. In a basic refresh it is often minimal or skipped — ask for the membrane, the number of coats and the wall turn-up height to be written into the quotation.
Do large-format tiles cost more?
Yes. Switching from standard tiles to large-format or imported tiles adds about RM2,000–RM5,000 per bathroom, because the tiles cost more and the walls must be flatter.
Does ClickBina do bathroom renovation?
As part of a whole-house refurbishment we coordinate every trade, bathrooms included. For a bathroom-only job, WhatsApp us your job details for a quote — we reply within the hour. A site visit is free.
How accurate is this bathroom renovation calculator?
It is a planning range from published Klang Valley figures, not a quotation. The final price depends on the size of the bathroom, the tiles and fittings you choose and what is found once the old tiles come off.

Want a proper quote?

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote