Epoxy Flooring Price Calculator Malaysia: Per Sq Ft 2026
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🎨 Free Calculator

Epoxy Flooring Price
Calculator (per sq ft)

Epoxy flooring price in Malaysia runs from RM6–RM10 per sq ft for a basic epoxy coating up to RM18–RM28 per sq ft for metallic or 3D epoxy, installed (indicative 2026, Klang Valley). Pick the epoxy system, enter the floor area in sq ft, and add a UV-stable topcoat if the floor gets sun.

📍 We serve KL, Selangor & Putrajaya.

Worker spreading grey epoxy coating across a car porch floor

Epoxy flooring price estimator

Length × width in feet. A single-car porch is often around 100–200 sq ft; a garage 300–400 sq ft.

Epoxy flooring price per sq ft and by floor size (2026)

Epoxy systemPer sq ft500 sq ft1,000 sq ft1,200 sq ft
Basic epoxy coating (roll-on)RM6–RM10RM3,000–RM5,000RM6,000–RM10,000RM7,200–RM12,000
Self-levelling epoxyRM10–RM18RM5,000–RM9,000RM10,000–RM18,000RM12,000–RM21,600
Metallic / 3D epoxyRM18–RM28RM9,000–RM14,000RM18,000–RM28,000RM21,600–RM33,600
Epoxy flake (decorative)RM14–RM22RM7,000–RM11,000RM14,000–RM22,000RM16,800–RM26,400
Anti-slip epoxy (wet areas)RM10–RM16RM5,000–RM8,000RM10,000–RM16,000RM12,000–RM19,200
UV-stable topcoat (outdoor, add-on)+RM3–RM5+RM1,500–RM2,500+RM3,000–RM5,000+RM3,600–RM6,000

Each size is simply area × rate, installed. Very small floors often cost more per sq ft because set-up is spread over fewer square feet, and heavy grinding or crack repair can move the price. These are Klang Valley rates — prices in Penang, Johor Bahru, Kuching or Kota Kinabalu can differ. ClickBina works in KL and Selangor.

How this estimate works

Epoxy flooring is priced per square foot of finished area, and the system you choose sets the rate: a basic roll-on epoxy coating at RM6–RM10 per sq ft, a self-levelling system at RM10–RM18, metallic or 3D epoxy at RM18–RM28, a decorative flake system at RM14–RM22 and anti-slip epoxy for wet areas at RM10–RM16. The calculator multiplies that rate by your area and shows the result as a range.

If the floor is outdoors or gets direct sun — a car porch, a driveway, a shop front by the glass — standard epoxy yellows. Tick the outdoor option to add a UV-stable aliphatic polyurethane or polyaspartic topcoat at RM3–RM5 per sq ft across the same area.

The rates come from the 2026 tables in our epoxy flooring price guide. What decides whether an epoxy floor lasts is preparation: diamond grinding or shot-blasting, crack repair and a moisture check on the slab. A quote that skips these can look cheaper and fail sooner. For a firm number, WhatsApp ClickBina your job details with the floor size — the quote on WhatsApp is free, and a site visit is free.

What moves the price

FactorHow it changes your quote
SystemA thin roll-on coating is the cheapest; self-levelling, flake and metallic systems add layers and labour.
Surface preparationGrinding or shot-blasting the slab is what makes epoxy bond. Oil-stained, painted or uneven floors need more of it.
Cracks and moistureCracks need filling first, and a damp slab can lift the coating — ask whether a moisture test is included.
Sun exposureOutdoor floors need a UV-stable topcoat or the epoxy discolours.
AreaVery small floors cost more per sq ft because set-up and mobilisation are spread over fewer square feet.
UseCar tyres, forklifts and wet kitchens need tougher or anti-slip systems than a bedroom or showroom.

Indicative estimate only — final pricing after a photo assessment or site visit. Page updated 8 Oct 2026.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is the epoxy flooring price per sq ft in Malaysia?
Indicative 2026 Klang Valley installed rates are RM6–RM10 per sq ft for a basic epoxy coating, RM10–RM18 for self-levelling, RM18–RM28 for metallic or 3D epoxy, RM14–RM22 for a flake system and RM10–RM16 for anti-slip epoxy.
How much is epoxy flooring for 1,000 sq ft?
At 2026 Klang Valley rates, 1,000 sq ft costs about RM6,000–RM10,000 for a basic epoxy coating, RM10,000–RM18,000 for self-levelling and RM18,000–RM28,000 for metallic epoxy. A 500 sq ft floor is roughly half that; add RM3,000–RM5,000 per 1,000 sq ft for a UV-stable topcoat outdoors.
Epoxy paint vs epoxy resin flooring: what is the price difference?
Epoxy “paint” is the thin roll-on coating at the bottom of the range (RM6–RM10 per sq ft). A self-levelling system (RM10–RM18) is poured thicker for a smooth, seamless, glossy floor that also hides minor unevenness.
Can I use epoxy on a car porch or outdoors?
Yes, but standard epoxy yellows in direct sun. Add a UV-stable aliphatic polyurethane or polyaspartic topcoat, which adds RM3–RM5 per sq ft, and choose an anti-slip or flake finish so it is not slippery when wet.
Why do epoxy quotes vary so much?
Mostly because of surface preparation. One contractor grinds the slab and repairs cracks; another only sands it. Ask each quote to name the preparation method, the number of coats and the topcoat type.
Is epoxy good for a home kitchen floor?
It can be — it is seamless and easy to clean. Use an anti-slip system (RM10–RM16 per sq ft) for wet kitchens, and make sure the slab is dry before coating.
How accurate is this epoxy price calculator?
It gives a planning range from published 2026 Klang Valley rates. Send ClickBina photos and the floor size on WhatsApp for a free quote; a site visit is free.

Need a Real Quote?

WhatsApp us your job details and measurements — free quote, we reply within the hour.

WhatsApp ClickBina← All Tools
💬 Get Your Free Quote